For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 82-127 — Placement or maintenance of a communications facility, utility pole or wireless support structure in public rights-of-way

Code of Ordinances, City of Hialeah, Florida (Supp. No. 45: codified through Ordinance No. 2026-048, adopted June 23, 2026) · Hialeah Code of Ordinances § 82-127

Corpus is an independent public-information project, not the official City of Hialeah website. Stable reference: corpuslaw.us/code/a95148a1-1606-4787-a215-f046297d3089

Sec. 82-127. - Placement or maintenance of a communications facility, utility pole or wireless support structure in public rights-of-way.

(a) The registrant must at all times comply with and abide by all applicable provisions of the state statutes and city ordinances, codes and regulations in placing or maintaining a communications facility, utility pole or wireless support structure in the public rights-of-way. A registrant shall at all times be subject to all lawful exercise of the police power of the city. (b) A registrant shall not commence to place or maintain a communications facility, utility pole or wireless support structure in the public rights-of-way until all applicable permits have been issued by the city and the registrant has complied with all applicable processes required by the city or other appropriate authority. The registrant acknowledges that as a condition of granting such permits, the city may impose reasonable rules or regulations governing the placement, maintenance or repairs of a communications facility, small wireless facility, utility pole or wireless support structure in public rights-of-way. No permit is required for routine maintenance and replacement of existing small wireless facilities and micro wireless facilities with small wireless facilities and micro wireless facilities that are substantially similar or at the same or smaller size or the placement of micro wireless facilities in the public rights-of-way unless the maintenance or replacements involves excavation, closure of a sidewalk, or closure of a vehicular lane for existing, new or replacing facilities or accompanying equipment that are underground. Permits shall apply only to the areas of public rights-of-way specifically identified in the permit. However, in cases of emergencies, meaning a condition that affects the public's health, safety or welfare, which includes an unplanned out-of-service condition of a pre-existing service, the registrant shall provide prompt notice to the city of the placement, maintenance or repairs of a communications facility, utility pole or wireless support structure in the public rights-of-way. (c) As part of any permit application to place a new or replace an existing communications facility, small wireless facility, utility pole or wireless support structure in the public rights-of-way, the registrant shall complete the city's telecommunications information packet and include a proposal for construction of the communications facility, small wireless facility, utility pole or wireless support structure that sets forth at least the following: (1) An engineering plan signed and sealed by a state registered professional engineer, or prepared by a person who is exempt from such registration requirements as provided in F.S. § 471.003, identifying the location of the proposed facility or structure, including a description of the facilities and structures to be installed, where it is to be located, and the approximate size of facilities, structures and equipment that will be located in public rights-of-way. If the plans so provided require revision based upon actual installation, the registrant shall promptly provide revised plans or "as-builts" upon completion of any installation or construction in accordance with this Ordinance. The plans shall be in a digitized format showing the two-dimensional location of the facilities based on the city's geographical database, or other format reasonably acceptable to the city. The registrant shall provide such plans at no cost to the city. The city shall maintain the confidentiality of such plans and any other information provided in accordance with F.S. § 202.195, as it may be amended; (2) A description of the manner in which the facility will be installed (i.e., anticipated construction methods and/or techniques); (3) A traffic maintenance plan for any disruption or obstruction of the public rights-of-way; (4) Information on the ability of the public rights-of-way to accommodate the proposed communications facility, small wireless facility, utility pole, wireless support structure or accompanying equipment facility, if available (such information shall be provided without certification as to correctness, to the extent obtained from other persons with facilities, poles or structures within 50 feet of the same public rights-of-way). The 50-foot distance requirement may be modified if the streets department determines that the proposed location: (i) better serves the city's interests in safe, aesthetic, efficient and effective management of the public rights-of-way; (ii) is necessary to address a documented lack of capacity for one or more communications services providers; or (iii) will help minimize the total number of communication facilities necessary to serve a particular area; (5) If appropriate given the facility or structure proposed, an estimate of the cost of restoration to the public rights-of-way; (6) The timetable for construction of the project or each phase thereof, and the areas of the city which will be affected; and (7) Such additional information requested by the city that is reasonably necessary to review the permit application consistent with applicable law. (d) The city shall have the power to prohibit or limit the placement of new or additional communications facilities, utility poles, wireless support structures or accompanying equipment facilities within the public rights-of-way if it will materially interfere with the safe operation of traffic control equipment, sight lines or clear zones for transportation, pedestrians, or interferes with compliance with the Americans with Disabilities Act or similar federal or Florida standards regarding pedestrian access or movement, or fails to comply with the 2010 edition of the Florida Department of Transportation Utility Accommodation Manual, as may be amended, or fails to accommodate imminent city plans for public improvements or projects that the city determines are in the public interest for public safety and to the extent not prohibited by applicable law. (e) To the extent not inconsistent with Florida Public Service Commission regulations, the city may require the use of trenchless technology (i.e., directional bore method) for the installation of communications facilities in the public rights-of-way underground as well as joint trenching for the installation of facilities in existing conduit. In making such requests, the city shall take into consideration several factors including inconvenience to the public and other users of rights-of-way and the economic and technical feasibility of such requests. The registrant shall be liable for the displacement, damage or destruction of any property, irrigation system or landscaping as a result of the placement or maintenance of its facility within the public rights-of-way. The appropriate city official may issue such rules and regulations concerning the placement or maintenance of a communications facility, small wireless facility, utility pole, wireless support structure or accompanying equipment facility in the public rights-of-way as may be consistent with this Ordinance and other applicable codes or law. (f) If the city determines there is potential interference with public safety prior to the commencement of any work by the registrant in the rights-of-way, the city may require the registrant to issue notice of the work using reasonable means to property owners whose property either adjoins or lies within 100 feet of such rights-of-way. (g) All safety practices required by applicable law or accepted industry practices and standards shall be used by registrant during the placement or maintenance of communications facilities, utility poles and wireless support structures. A registrant's system and facilities shall comply with the FCC's rules and regulations of the emergency alert system when applicable. (h) A registrant shall, at its own expense, keep all affected areas in a reasonably clean and workmanlike manner, and restore the public rights-of-way to at least its original condition or improved condition than what existed prior to commencement of work in the public rights-of-way. The registrant shall warrant its restoration for a period of 12 months after completion of such restoration. If the registrant fails to make such restoration within 20 calendar days after completion of construction, or such other time as may be required by the city, the city may, after written notice to the registrant, perform such restoration using city employees, agents or contractors, and withdraw the amount of all costs related to the restoration from the registrant's current construction bond and require replenishment of the bond and reimbursement of any excess within 30 days after the submission of the invoice by the city to the registrant. (i) Removal or relocation at the direction of the city of a registrant's communications facility, utility pole, wireless support structure or accompanying equipment facility in the public rights-of-way shall be governed by the provisions of F.S. § 337.403, as amended. If the registrant fails to remove and/or relocate registrant's communications facility, utility pole, wireless support structure or accompanying equipment facility in the public rights-of-way, the city may, after written notice to the registrant, perform such removal and relocation using city employees, agents or contractors, and withdraw the amount of all costs related to the removal and relocation of registrant's communications facility, utility pole, wireless support structure or accompanying equipment facility in the public rights-of-way from the registrant's current construction bond and require replenishment of the bond, and reimbursement of any excess within 30 days after the submission of the invoice by the city to the registrant. (j) A permit from the city constitutes authorization to undertake only certain activities on public rights-of-way in accordance with this Ordinance, and does not create a property right or grant authority to impinge upon the rights of others who may have an interest in the public rights-of-way. (k) A registrant shall maintain its communications facility, utility pole or wireless support structure in the public rights-of-way in a manner consistent with accepted industry practice, standards and applicable law, as amended or adopted. (l) All construction, installation and maintenance of a registrant's communications facilities, utility poles and wireless support structures in the public rights-of-way shall comply with the National Electrical Safety Code, the National Electric Code, the state building code, accepted industry practices and standards, applicable codes, and all laws established by all local, state or federal authorities, and as hereinafter may be amended or changed. The registrant shall use and exercise due caution, care and skill in performing work in the public rights-of-way and shall take all reasonable steps to safeguard work site areas. (m) In connection with excavation or placement of its facilities underground in the public rights-of-way, a registrant shall, where applicable, shall maintain appropriate membership in the one-call notification system and comply with the Underground Facility Damage Prevention and Safety Act set forth in F.S. ch. 56, as it may be amended. (n) In the interest of the public's health, safety and welfare, upon request of the city, a registrant shall coordinate placement or maintenance activities under a permit with any other work, construction, installation or repairs that may be occurring or scheduled to occur within 30 days in the subject public rights-of-way. The city may require a registrant to alter reasonably its placement or maintenance schedule for permitted work as necessary so as to minimize disruptions and disturbance in the public rights-of-way. The city may provide a more definite timeframe based on specific city construction or maintenance schedules. (o) Upon the city's request, registrant's employees, contractors and subcontactors must provide a picture identification badge and telephone number indicating that they work for the registrant and/or contractor for city employees to contact. A registrant or contractor shall also require all company vehicles to prominently display the name under which the registrant or contractor is doing business, and logo, if any, in a manner clearly visible to the public. (p) A registrant shall not place or maintain its communications facilities, utility poles wireless support structures or equipment facilities so as to interfere, displace, damage or destroy any facilities, including, but not limited to, sewers, gas or water mains, storm drains, pipes, cables or conduits of the city, landscaped areas and swales, or any other person's facilities lawfully occupying the public rights-of-way of the city. Further, a registrant shall not place or maintain its communications facilities, utility poles or wireless support structures, company or contractor vehicles, or related equipment facilities so as to interfere with the safety of the public. (q) The city makes no warranties or representations regarding the fitness, suitability or availability of public rights-of-way for the registrant's communications facilities, utility poles or wireless support structures and any performance of work or costs incurred by registrant or provision of services shall be at registrant's sole risk. Nothing in this Ordinance shall affect the city's authority to add, vacate or abandon public rights-of-way and the city makes no warranties or representations regarding the availability of any added, vacated or abandoned public rights-of-way for communications facilities, utility poles, wireless support structures or equipment facilities. (r) The city shall have the right to make such visual inspections of facilities or structures placed or maintained in public rights-of-way as it finds necessary to ensure compliance with this Ordinance. In the event the city determines that a violation exists with respect to the registrant's placement or maintenance of facilities or structures in the public rights-of-way that is not considered to be an emergency or danger to the public health, safety or welfare, the city will provide the registrant no less than three days' written notice setting forth the violation and requesting correction. A registrant shall, upon receipt of written notice from the city, be given a time schedule to cure the violation. Failure to commence to cure the violation within 30 days and to complete cure, to the city's satisfaction, within 60 days, or such longer time as the city may specify, may result in revocation of any registration or permit and the city may seek any remedy or damages to the full extent of the law. The registrant may appeal the revocation of any registration or permit in accordance with section 82-131. This shall not preclude other penalties allowed by law. (s) The city reserves the right to place and maintain, and permit to be placed or maintained, sewer, gas, water, electric, storm drainage, communications, poles and other facilities, cables or conduit, and to do, and to permit to be done, any underground and overhead installation or improvement that may be deemed necessary or proper by the city in public rights-of-way occupied by the registrant. The registrant shall allow city facilities to be installed within city's public rights-of-way through the use of a joint trench during the registrant's construction project. Such joint trench projects shall be negotiated in good faith by separate agreement between registrant and city and may be subjected to other city rights-of-way requirements. The city further reserves without limitation the right to alter, change, or cause to be changed, the grading, installation, relocation or width of the public rights-of-way within the limits of the city and within said limits as same may from time to time be altered. (t) Subject to applicable law, a registrant shall, on the request of any person holding a permit issued by the city, temporarily support, protect, raise or lower its communications facilities, utility poles or wireless support structures to permit the work authorized by the permit. The expense of such temporary support, protection, raising or lowering of facilities shall be paid by the person requesting the same, and the registrant shall have the authority to require such payment in advance. The registrant shall be given not less than 30 days advance written notice to arrange for such temporary relocation. If the city requests the temporary support, protection, raising or lowering of a facility for a public purpose, the city shall not be charged for the temporary support, protection, raising or lowering of the facility, subject to F.S. § 337.403. (u) No wireless support structures in excess of 55 feet in height, or telecommunications towers as defined by the city code, may be installed or placed in the public rights-of-way. (v) Installation standards for communications facilities, utility poles, wireless support structures and accompanying equipment facilities. For the purposes of this subsection, to the extent not expressly prohibited by federal law, state law, the City Code or applicable Florida Public Service Commission rules and regulations, a communications facility, utility pole, wireless support structure or equipment facility placed in the public rights-of-way shall be subject to the following criteria: (1) All new utility poles that replace existing utility poles must be of substantially similar design, material, and color; (2) All communications facilities, utility poles, wireless support structures and equipment facilities in the public rights-of-way must be camouflaged, with substantially similar design, material, and the color of existing utility poles or wireless support structures; (3) All communications facilities, utility poles and wireless support structures shall not have any type of lighted signal, lights, or illuminations unless it is a light pole or required by an applicable federal, state, or local rule, regulation, law or the city code; (4) No commercial advertising shall be allowed on a communications facility, small wireless facility, utility pole, wireless support structure or accompanying equipment facility in the public rights-of-way; (5) No back-up power sources, including, but not limited to, generators and fuel storage tanks, may be installed or placed in the public rights-of-way; (6) The preferred location for placement of any accompanying equipment facilities or cabinets used in association with a communications facility, utility pole or wireless support structure in order of ranking is from highest (i) to lowest (iii). Where a lower ranked alternative is proposed, the registrant must demonstrate in its registration application that higher ranked options are not available. (i) Underground in the public rights-of-way; or (ii) Mounted onto the utility pole or wireless support structure itself; or (iii) On the ground in the public rights-of-way; (7) Space permitting, accompanying equipment facilities installed on the ground in the public rights-of-way must be located in areas with existing foliage or another aesthetic feature to obscure the view of the equipment facilities. (8) For public safety purposes, no registrant may overlash on or between utility poles or wireless support structures for the provision of communications services in the public rights-of-way if the facilities suspended on cables or wires strung between utility poles or wireless support structures or attached to utility poles or wireless support structures fail to comply with load capacity required by applicable codes and laws, as amended. (9) To the extent reasonably practicable, no exposed conduit or wiring is permitted. (10) Such design standards may be waived by the city upon a showing that the design standards are not reasonably compatible for the particular location of a small wireless facility or that the design standards impose an excessive expense. The waiver shall be granted or denied within 45 days after the date of the request.

(Ord. No. 2018-028, § 3, 4-24-2018)

Ask a question about Hialeah law

Corpus searches the Hialeah sections it holds and shows the ones that match, with their citations. Free, no sign-in.