§ 102-46 — Permit required; application, fee
Code of Ordinances of the City of Lakeland, Florida (Supp. No. 22: codified through Ordinance No. 6121, enacted December 1, 2025) · Lakeland Code of Ordinances § 102-46
Corpus is an independent public-information project, not the official City of Lakeland website. Stable reference: corpuslaw.us/code/3db36da4-6f39-4f51-875d-e143c2834503
Sec. 102-46. - Permit required; application, fee.
(a) All significant industrial users shall be required to obtain a wastewater discharge permit and shall complete and file with the city an application for such permit in the form prescribed by the city and accompanied by a fee of $100.00. Existing users who, after the effective date of the ordinance from which this section was derived, are identified as significant industrial users shall apply for a WDP within 30 days after notification of significant industrial user status by the city, and proposed new significant industrial users shall apply at least 90 days prior to connecting to or contributing to the WWF. In support of the application, the significant industrial user shall submit, in units and terms appropriate for evaluation, the following information: (1) Identifying information. a. The name and address of the facility, including the name of the operator and owner. b. Contact information, description of activities, facilities, and plant production processes on the premises. (2) Environmental permits. A list of any environmental control permits held by or for the facility. (3) Description of operations. a. A brief description of the nature, average rate of production (including each product produced by type, amount, processes and rate of production), and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes; b. Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; c. Number and type of employees, hours of operation, and proposed or actual hours of operation; d. Type and amount of raw materials processed (average and maximum per day); e. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge. (4) Time and duration of discharges. (5) The location for monitoring all wastes covered by the permit. (6) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula. (7) Measurement of pollutants. a. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources. b. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the director, of regulated pollutants in the discharge from each regulated process. c. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. d. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection 102-58(h) of this chapter. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the director or the applicable standards to determine compliance with the standard. e. Sampling must be performed in accordance with procedures set out in section 102-104 of this chapter. (8) Any requests for a monitoring waiver (or a renewal of an approved monitoring waiver) for a pollutant neither present, nor expected to be present in the discharge based on subsection 102-55(b). (9) Any other information as may be deemed necessary by the director to evaluate the permit application. (10) If additional pretreatment technology and/or O&M will be required to meet the pretreatment standards, as established by local, state, or federal limits, a compliance schedule by which the significant industrial user will provide such additional pretreatment shall be submitted. The completion date in this compliance schedule shall not be later than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to this compliance schedule: a. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the significant industrial user to meet the applicable pretreatment standards, e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc. b. No increment referred to in subsection (10)a. of this section shall exceed nine months. c. No later than 14 days following each date in the schedule and the final date for compliance, the significant industrial user shall submit a progress report to the director including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for the delay and the steps being taken by the significant industrial user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the director. (11) Any other information as may be deemed by the city to be necessary to evaluate the permit application. (b) Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. (c) All WDP applications and reports must be signed by an authorized representative of the user and contain the following certification statement: "I certify under penalty of law that this document and all attachments were prepared under my direct supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations". (d) The city will evaluate the data furnished by the significant industrial user and may require additional information. After evaluation and acceptance of the data furnished, the city may issue a WDP subject to terms and conditions provided in this article. (e) Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this article and subjects the wastewater discharge permittee to the sanctions set out in division 3 of the article. Obtaining a wastewater discharge permit does not relieve a permittee of their obligation to comply with all federal and state pretreatment standards or requirements, or with any other requirements of federal, state or local law.
(Code 1960, § 29.05.1(A)(1); Ord. No. 3243, § 5, 11-5-90; Ord. No. 3706, § 1, 3-4-96; Ord. No. 5107, § 2, 7-6-09; Ord. No. 5319, § 2, 5-21-12)
Ask a question about Lakeland law
Corpus searches the Lakeland sections it holds and shows the ones that match, with their citations. Free, no sign-in.