Sec. 29-1. - Fill permits—Required.
(a) No submerged land or low-lying land within the city for which a design grade has been or later may be established by the county shall be filled until a permit authorizing the filling has been obtained from the resilience and public works department. Such permit shall be obtained by the owner of the land or by a qualified contractor having a bona fide contract with the owner to perform the work. (b) A fill permit issued by the resilience and public works department shall be required when the elevation of the land to be filled is two feet or more below the design grade established by the county and the areas to be filled consist of 10,000 square feet or more. On land requiring a fill permit, the application for a building permit shall not be made before the fill permit is obtained. The fact that a fill permit may not be required does not lessen the responsibility of the owner or developer to comply with the intent of this article. If, in the opinion of the director of resilience and public works, unsuitable materials are being used for fill, the director of resilience and public works may stop the work and require that a fill permit be obtained.
(Code 1967, § 27-1; Code 1980, § 29-1; Ord. No. 13792, § 1, 10-11-18)
Ask a question about Miami law
Corpus searches the Miami sections it holds and shows the ones that match, with their citations. Free, no sign-in.