For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 26-58 — Excavation procedures and installation of facilities

Code of Ordinances of the City of Miami Gardens, Florida (Codified through Ordinance No. 2026-005-494, adopted February 25, 2026 (Supp. No. 19)) · Miami Gardens Code of Ordinances § 26-58

Corpus is an independent public-information project, not the official City of Miami Gardens website. Stable reference: corpuslaw.us/code/8577cab8-b5db-4c47-aa52-b9dc3034361c

Sec. 26-58. - Excavation procedures and installation of facilities.

(a) Excavators are prohibited from removing or destroying any markings used by a member operator to mark the horizontal route of an underground facility. If markings are no longer visible, the excavator shall stop activities in that vicinity and notify the state one-call notification system to have the route remarked. (b) No excavator may excavate or engage in demolition where such excavation or demolition is substantially certain to result in damage to any underground facility; this section shall not preclude an excavator from engaging in exploratory digging. If an excavation or demolition causes damage to any existing underground facility, the excavator must cease excavation or demolition at that depth and immediately notify the affected utility. (c) No new underground facility shall be installed in such a way that creates a conflict with an existing underground facility unless the excavator submits a permit drawing showing the existence of the conflict and this permit drawing is approved by the permitting agency or, when the excavator discovers a conflict the existence of which the excavator was unaware of when the excavator applied for a permit, that excavator ceases excavation, immediately notifies the owner of the existing facility and: (1) Takes such measures as are reasonable in the determination of the owner of the existing facility to prevent interference with the operation or maintenance of the existing facility, where the existing facility is a water or sewer facility owned, operated, or maintained by the county or a municipality; or (2) Consults with the owner of the existing facility to determine whether measures to prevent interference with the operation, or maintenance of the existing facility are reasonably necessary, if the existing facility is not a water or sewer facility owned, operated, or maintained by the county or a municipality; in the event that the excavator and the owner of the existing facility are not able to determine whether such measures are reasonably necessary, the permitting agency shall determine what measures are reasonably necessary to allow installation of the new facility. (d) If the owner of the existing facility does not respond to notification provided by an excavator under this section within 24 hours of such notification, the excavator shall be allowed to continue installation. All conflicts of which the excavator is aware of when applying for a permit shall be disclosed on the permit drawings; for the purposes of subsection (c) of this section, a conflict which does not involve a water and sewer facility shall refer to 12 and not 24 inches. Nothing in this section shall empower any agency or person to approve any installation in violation of any state or federal statute, rule, or code. (e) An excavator shall not engage in directional boring unless the equipment used for such directional boring allows the excavator to monitor the location of the excavator's bore-head, or equivalent equipment.

(County Code, § 21-225)

Ask a question about Miami Gardens law

Corpus searches the Miami Gardens sections it holds and shows the ones that match, with their citations. Free, no sign-in.