§ 30-36 — Permit procedures
Code of Ordinances of the City of Miami Gardens, Florida (Codified through Ordinance No. 2026-005-494, adopted February 25, 2026 (Supp. No. 19)) · Miami Gardens Code of Ordinances § 30-36
Corpus is an independent public-information project, not the official City of Miami Gardens website. Stable reference: corpuslaw.us/code/1bf401fe-bb9a-43f3-a8b3-c3d9e41c8f06
Sec. 30-36. - Permit procedures.
Application for a building permit shall be made to the city building department on forms furnished by the department prior to any development activities, including placement of manufactured homes, and may include, but not be limited to, the following plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, earthen fill, storage of materials or equipment, drainage facilities, and the locations of the foregoing. Specifically, the following information is required, but is not necessarily limited to: (1) Application stage. a. Proposed elevation of the lowest floor that meets or exceeds in height the highest of the following elevations: 1. Highest adjacent crown-of-road plus 12 inches. 2. Miami-Dade County flood criteria plus 12 inches. 3. Base flood elevation plus 12 inches as depicted on the current FIRM. b. Proposed elevations of all machinery, utilities and equipment servicing the structure, demonstrating compliance with the criteria established in subsection (1)a. of this section; c. Proposed elevation of the lowest adjacent grade of the exterior of the structure; d. A sediment and erosion control plan that includes appropriate and adequate best management practices to retain sediment and stormwater runoff on a construction site, and prevent erosion at such site; e. A stormwater management plan that demonstrates on-site retention of stormwater runoff; f. Proposed elevation in relation to mean sea level to which any nonresidential building will be floodproofed; g. Certificate from a registered professional engineer or architect that the nonresidential floodproofed building will meet the floodproofing criteria in section 30-64(2); and h. Description of the extent to which any watercourse will be created, altered or relocated as a result of proposed development; i. For accessory structures, the lowest floor shall be elevated to a minimum of four inches above the highest adjacent grade. For accessory structures placed in special flood hazard areas, the design requirements in subsection 30-64(3) shall apply. (2) Construction stage. a. Upon the start of construction, the permit holder shall have in place a sediment and erosion control plan as approved in subsection 30-36(1)(d) of this article. Failure to comply with conditions of this approved plan during construction shall be considered a violation of this section. b. Upon placement of the lowest floor, or before pouring the columns and/or tie beam, or floodproofing by whatever construction means, it shall be the duty of the permit holder to submit to the floodplain administrator or building official a certification of the NGVD elevation of the lowest floor or floodproofed elevation, in relation to mean sea level. Said certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for a particular building said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to submission of the certification shall be at the permit holder's risk. The floodplain administrator shall review the lowest floor and floodproofing elevation survey data submitted. The permit holder shall correct violations detected by such review immediately and prior to further progressive work being permitted. Failure to submit the survey or failure to make said corrections required hereby shall be cause to issue a stop-work order for the project, or to initiate other appropriate enforcement action as warranted. (3) Completion of construction phase. a. Upon completion of the project, after final grading and landscaping has been completed, it shall be the duty of the permit holder to submit to the floodplain administrator a signed and sealed elevation certificate showing NGVD elevations that demonstrate compliance with all elevations proposed in the permit application, and all the elevation requirements established in this chapter. The permit holder shall correct all deficiencies noted in the certificate prior to issuance of a certificate of occupancy or temporary certificate of occupancy. b. For those projects with approved floodproofing designs, a signed and sealed as-built floodproofing certificate shall be submitted to the floodplain administrator. Said certificate must demonstrate compliance with this chapter and with the approved floodproofing design certificate submitted at the application phase of development. Said certificate must also include operational and maintenance plans as defined in this chapter. Correction to any deficiencies noted in this certificate must be corrected before issuance of a certificate of occupancy or temporary certificate of occupancy.
(Ord. No. 2009-20-192, § 2(art. IV, § A), 9-8-2009; Ord. No. 2011-22-264, § 4, 10-5-2011; Ord. No. 2021-009-439, § 3, 12-8-2021)
Ask a question about Miami Gardens law
Corpus searches the Miami Gardens sections it holds and shows the ones that match, with their citations. Free, no sign-in.