For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 34-94 — Levels of service standards (LOS)

Code of Ordinances of the City of Miami Gardens, Florida (Codified through Ordinance No. 2026-005-494, adopted February 25, 2026 (Supp. No. 19)) · Miami Gardens Code of Ordinances § 34-94

Corpus is an independent public-information project, not the official City of Miami Gardens website. Stable reference: corpuslaw.us/code/6a5837b8-a90d-4f9c-acea-0596896e842f

Sec. 34-94. - Levels of service standards (LOS).

A determination of concurrency shall be based on the levels of service established in the capital improvements element of the comprehensive development master plan of the city, at the time, the proposed development is projected to generate a demand for services. A determination of concurrency shall be conducted in accordance with the methodology described in the city's concurrency management system manual and shall be based on the capacity of available public facilities less applicable capacity credits within the applicable transportation concurrency management area (TCMA) and traffic analysis zones (TAZ). (1) The following level of service standards shall be used to determine whether concurrency exists: a. Roads. If an application for a concurrency determination, a certificate of concurrency reservation, or a conditional certificate of concurrency reservation includes a project which is subject to county, regional or state jurisdiction, the applicant must submit with such application written documentation from the said agency engineering department evidencing that the project shall be in full compliance with the requirements of that jurisdiction, and, if an application is for other than a concurrency determination, such compliance shall exist for the entire life of the requested certificate and all possible development orders flowing there from. Except as provided below, those roads within the city as identified in the comprehensive development master plan, shall operate at the adopted level of service as defined in the transportation level of service table. The city has established four transportation concurrency management areas. Each TCMA shall maintain an area wide level of service. Maintenance of LOS shall be the basis for the issuance of development orders and permits within each TCMA. The comprehensive development master plan states that the city will comply with all concurrency management requirements and the following minimum LOS standards: Table 1: Transportation Level of Service Transportation Level of Service Table Facility Type | Location Inside Miami Gardens | Roadways Parallel to Exclusive Transit Facilities | Inside Transportation Concurrency Management Areas FIHS/SIS-Limited Access Highway | LOS D [E] | LOS E | LOS D [E] FIHS/SIS-Controlled Access Highway | LOS D | LOS E | LOS E Non-FIHS/SIS Facilities | — | — | Area wide LOS E* Notes: FIHS = Florida Intrastate Highway System. SIS = Strategic Intermodal System LOS inside of [brackets] applies to general use lanes only when exclusive through lanes exist. The overall average LOS within each TCMA shall remain at E or better. Applicants shall be required to submit traffic studies and circulation plans including ingress and egress from and to adjacent roadways for automobiles, trucks and delivery vehicles, pedestrian, mass transit, and bicycles. Traffic circulation plans shall be reviewed and approved by the city. Non-de minimus developments shall be required to perform traffic studies to estimate their compliance with the LOS standards. If these studies estimate that a developments traffic impact does not meet the LOS standards, the city shall require enforceable development agreements that commit the developer to make certain improvements to meet those standards. During this interim period, developments that cannot meet the above standards shall not be approved. Through this procedure, the level of service standard adopted in the comprehensive development master plan shall be maintained on city roads for both small and large projects. b. Sanitary sewer. Sanitary Sewer facilities shall meet the following level of service standards as adopted by the city's two main service providers, namely the Miami-Dade Water and Sewer Department (WASD) and the City of North Miami Beach: Table 2: Sanitary Sewer Level of Service Standard Facility | Level of Service Standard Sanitary Sewer | Miami-Dade County Service Area Level of Service Standard: Regional wastewater treatment plants shall operate with a physical capacity of no less than the annual average daily sewage flow. Effluent discharged from wastewater treatment plants shall meet all federal, state, and county standards. The system shall maintain the capacity to collect and dispose of 102 percent of average daily sewage demand for the preceding five years. City of North Miami Beach Service Area Level of Service Standard: The sanitary sewer collection system within the city shall accommodate an average daily flow of at least 85 gallons per person per day. The county treatment and disposal system shall operate with a design capacity of two percent above the daily flow of the preceding year. Otherwise, septic tanks shall be the level of service. The adopted LOS standard shall be used as the basis for determining the availability of facility capacity and the demand generated by a development within the city for purposes of issuing development orders or building permits. c. Solid waste. The solid waste facilities serving the city shall operate at the following LOS standards: Table 3: Solid Waste Level of Service Standard Facility | Level of Service Standard Solid waste | Maintain solid waste disposal capacity sufficient enough to accommodate waste flows to the system through long-term interlocal agreements or contracts along with anticipated non-committed waste flows for a period of five years (Same as Miami Dade County). d. Drainage. Drainage facilities shall operate at the following LOS standards: Table 4: Drainage Level of Service Standard Facility | Level of Service Standard Storm water drainage | Water Quality Standard. Stormwater facilities shall meet the design and performance standards established in chapter 62-25, Florida Administration Code (FAC), with treatment of the runoff from the first one inch of rainfall onsite to meet the water quality standards required by chapter 62-302, Rule 862-302.500, FAC Water Quantity Standard. Where two or more standards impact a specific development, the most restrictive standard shall apply: Post-development runoff shall not exceed the pre-development runoff rate for a 25-year storm event, up to and including an event with 24-hour duration. Treatment of the runoff from the first one inch of rainfall onsite or the first one-half inch of runoff from impervious areas, whichever is greater. e. Potable water. Potable water facilities shall operate at the following LOS standards: Table 5: Potable Water Level of Service Standard Facility | Level of Service Standard Potable water | Miami-Dade County Service Area Level of Service Standard Regional treatment: The regional treatment system shall operate with a rated capacity no less than 2 percent above the maximum daily flow for the preceding year and an average daily capacity 2 percent above the average daily system demand for the preceding 5 years. Water quality: Water quality shall meet all federal, state, and county primary standards for potable water. Countywide storage capacity: Countywide storage capacity for finished water shall equal no less than 15 percent of the countywide average daily demand. Water is delivered to users at a pressure no less than 20 pounds per square inch (psi) and no greater than 100 psi. Miami Gardens will adopt the county's system-wide per capita of 155 gallons per capita per day as its LOS. The minimum fire flows maintained by WASD shall be based on the following land uses: Single-family Residential/Estate, Single-family, Duplex, and Residential on minimum lots of 7,500 square feet, Multifamily Residential; Semiprofessional Offices, Hospitals; Schools, Business and Industry. City of North Miami Beach Service Area Level of Service Standard: Potable water: the city's water system shall provide 144 gallons per person per day at a pressure of 40 pounds per square inch (psi). The city attempts to maintain a water pressure of 40 pounds per square inch (psi) although 20 psi is the legal minimum. Miami Gardens will adopt the LOS standards of 144 gallons per person per day consistent with North Miami Beach level of service standards. Table 6: Minimum Fire Flow Level of Service Land Use | Minimum Fire Flow LOS (Gal/Min) Single-Family Residential/Estate | 500 Single-family, Duplex, and Residential on minimum lots of 7,500 square feet | 750 Multifamily Residential; Semiprofessional Offices | 1,500 Hospitals; Schools | 2,000 Business: Industry | 3,000 f. Parks and recreation. Parks and recreation facilities shall operate at the following LOS standards: Table 6: Parks and Recreation Level of Service Standard Facility | Level of Service Standards Public parks | 1.0 acre(s) of public park facility per 1,000 residents g. Public schools. Public schools shall operate at the following LOS standards: Table 7: Public Schools Level of Service Standard Facility | Level of Service Standards Public schools | Pursuant to state law and administrative rules, the city shall coordinate with the Miami-Dade School Board and adopt a school concurrency program with an accompanying level of service standard of 100 percent utilization of Florida Inventory of School Houses (FISH) capacity (with relocatable classrooms) that will ensure the adequate supply of schools to serve the student population in the city. All non-exempt new residential units shall be reviewed for public school concurrency at the time of final plat or site plan (or functional equivalent) and shall be subject to the public school concurrency requirements as set forth in this article, and the amended and restated interlocal agreement as amended from time to time. The burden shall be on the applicant to ensure compliance with this section, and the applicant shall provide the necessary documentation demonstrating satisfaction of these requirements.

(Ord. No. 2010-10-218, § 2(3-100), 4-7-2010)

Ask a question about Miami Gardens law

Corpus searches the Miami Gardens sections it holds and shows the ones that match, with their citations. Free, no sign-in.