Sec. 21-195. - Equivalent residential connection.
As a basis of providing a uniform and consistent method of distributing costs to developers within the service area, the city hereby establishes equivalent residential connections, hereinafter referred to as ERCs, as the standard unit to measure water or wastewater demand. On or prior to issuance of a building permit, the number of ERCs attributable to any project shall be determined in accordance with this section. (a) The use of three hundred twenty-five (325) gallons of water per day, the maximum daily amount of water expected to be consumed by a typical detached single-family residential unit, constitutes one ERC. (b) The generation of three hundred (300) gallons of wastewater per day, the greatest average of the maximum daily amount generated by a typical detached single-family residential unit during each of any three consecutive months. (c) Meter size shall be used only to determine ERCs for detached single-family residential units, as follows: Meter Size | ERCs for Detached Single-Family Residential Uses ⅝ | 1.0 1 | 3.5 1.5 | 3.5 _____ (d) For the uses identified in the following table and in subparagraphs (i) and (ii) below, the number of water and wastewater ERCs will be determined as follows: Type of Use | Unit of Measure | ERCs per Unit Apartments | each | 0.500 Duplexes, townhouses and mobile homes | each | 0.700 Gas station (fueling only) | fuel pump | 0.500 Vehicular repair | per bay | 0.500 Laundry | per machine | 1.510 Restaurant/cafeteria | per seat | 0.113 Restaurant (24 hour) | per seat | 0.189 Restaurant (fast food) | per seat | 0.057 Bar, cocktail lounge | per seat | 0.057 Place of worship | per seat | 0.011 Private school | per student | 0.040 Dentist/doctor office | per doctor/dentist | 0.943 _____ (i) ERCs will be determined on a case-by-case basis by the city utility staff for manufacturing, laboratory and similar facilities that use water as an integral part of their process, based on water use data documenting water consumption for the most recent one-year operating period of at least four (4) similar establishments that are acceptable to the city in its reasonable judgment. Similar establishments will be limited to facilities of a similar size, utilizing the same process in a comparable geographical environment with approximately the same operating environment, including hours, number of employees, and other relevant features. Average daily flow will be converted to maximum daily flow by multiplying the average daily flow by the "system peaking factor" and multiplying the result by the "unaccounted-for system water factor." The maximum daily flow will be divided by three hundred twenty-five (325) to determine the number of water and wastewater ERCs. (ii) ERCs will be determined on a case-by-case basis by the city utility staff for hotels and motels, based on water use data documenting water consumption for the most recent one-year operating period of at least four (4) similar establishments that are acceptable to the city in its reasonable judgment. Similar establishments will be limited to facilities of a similar size and number of rooms, engaged in the same type of business in a comparable geographical environment with approximately the same operating environment, including hours, number of employees, and other relevant features. Average daily flow will be converted to maximum daily flow by multiplying the average daily flow by the "system peaking factor" and multiplying the result by the "unaccounted-for system water factor." The maximum daily flow will be divided by three hundred twenty-five (325) to determine the number of water and wastewater ERCs. (iii) [Reserved.] (iv) For purposes of converting average daily flow to maximum daily flow: (A) the term "system peaking factor" means the amount computed for the system by dividing (1) the maximum day demand by (2) the annual average day demand, in accordance with the most recent policy of the Florida Public Service Commission; and (B) the term "unaccounted-for system water factor" means the amount computed by dividing (1) the volume of water leaving the water treatment plant by (2) the volume of water measured at the customers' meters, calculated in accordance with standards promulgated by the American Water Works Association. (e) For all non-residential uses not specified in paragraph (d), the number of water and wastewater ERCs will be determined as follows: (i) The number of water ERCs will be determined by multiplying the number of fixture units attributable to the project (determined from the table set forth in subparagraph (iii) below) by fourteen and one-tenth (14.1) gallons per day, and then dividing the result by three hundred twenty-five (325) gallons per day per ERC. For example: Total Water ERC Value = Number of Fixture Units; X 14.1 gpd; 325 gpd/ERC (ii) If the city is providing both water and wastewater service to the project, the number of wastewater ERCs will be equal to the number of water ERCs. If the city is providing only wastewater service to the project, the number of wastewater ERCs will be determined by multiplying the number of fixture units attributable to the project (determined from the table set forth in subparagraph (iii) below) by thirteen (13) gallons per day, and then dividing the result by three hundred (300) gallons per day per ERC. For Example: Total Wastewater ERC Value = Number of Fixture Units X 13 gpd;300 gpd/ERC (iii) Fixture units are a measure of the instantaneous rate of flow normally required by a particular type of plumbing fixture. The sum of the fixture units of all plumbing fixtures in a project is a measure of the total water used by that project. The number of fixture units attributable to any project shall be determined as follows: Type Fixture | Fixture Units Bathtub (with or without overhead shower) | 2 Bidet | 1 Dental unit or cuspidor | 1 Dental lavatory | 1 Drinking fountain | ½ Dishwasher domestic | 2 Floor drains | 3 Lavatory (small pipe outlet) | 1 Lavatory large pipe outlet) | 2 Lavatory, barber, beauty parlor | 2 Lavatory, surgeon's | 2 Laundry tray (1 or 2 compartments) | 2 Shower stall, domestic | 2 Showers (group) per head sinks | 3 Combination sink-and-tray | 3 Combination sink-and-tray with food disposal unit | 3 Kitchen sink, domestic | 2 Kitchen sink, domestic with food waste grinder and/or dishwasher | 2 Surgeon's sink | 3 Flushing rim sink (with valve) | 8 Service sinks, combination trap, standard | 3 Service sink (P trap), ordinary | 2 Pot, scullery, etc., sink | 4 Wash sink (circular or multiple), per faucet set | 1 Urinal, pedestal | 8 Urinal, wall | 4 Urinal stall, washout | 4 Water closet, tank operated | 4 Water closet, valve operated | 8 Automatic dishwasher (domestic) | 2 Automatic clothes washer | 4 Commercial dishwasher | 6 Commercial clothes washer | 6 (iv) If the actual number of fixture units cannot be determined at or prior to issuance of a building permit (for example, in connection with a shell building), the utility staff shall reasonably estimate the number of fixture units based upon the anticipated uses. If the issuance of any building permit would result in a number of fixture units greater than the estimate, the developer shall pay for or assign the additional ERCs prior to issuance of the building permit. Upon completion of all interior improvements, a final fixture count shall be made. If the final number is less than the estimate, the utility staff shall issue a credit to the building owner for the number of unused ERCs. (f) [Reserved.] (g) If the number of ERCs for any project has been determined under section 21-195(d) the director of engineering services may elect to audit the accuracy of the determination in the manner set forth in this paragraph (g). Any audit shall be based upon actual demand during any twelve-month period within three (3) years of issuance of the certificate of occupancy, as determined by the director of engineering services, adjusted for the percentage of actual occupancy and use during each relevant period. Average daily flow will be converted to maximum daily flow by multiplying the average daily flow by the "system peaking factor" and multiplying the result by the "unaccounted-for system water factor". The maximum daily flow will be divided by three hundred twenty-five (325) to determine the number of water and wastewater ERC's. Upon completion of the audit, the utility staff shall provide a copy to the developer by certified mail, return receipt requested. If the audit concludes that the actual demand exceeds the number of ERC's determined under paragraph (d), the developer shall pay for the additional ERC's within thirty (30) days of receiving the audit. If the audit concludes that the actual demand is less than the number of ERC's determined under paragraph (d), the city shall reimburse the developer for the difference. (h) Prior to issuance of a building permit to change the use of a nonresidential structure after it has been connected to the system, the number of added or reduced ERCs attributable to the change in use shall be calculated in accordance with this section. If the calculation results in additional ERCs, the developer shall pay for the additional ERCs prior to issuance of a building permit. If the calculation results in a reduction in the number of ERCs, the difference will be available for application to a future change in use or expansion of the project. This paragraph (h) shall not apply to building permits for the construction of initial tenant interiors within a shell building, which shall be handled in accordance with subparagraph (iv) of paragraph (e). (i) The number of ERCs for any commercial, industrial and institutional building shall be calculated separately and must be rounded to the nearest highest whole number. Each commercial, industrial and institutional building will be individually metered. The developer's engineer shall certify a proposed meter size and provide information on estimated peak flows and low flows, including head losses through the metering devise from the manufacturer's literature, sufficient for the utility staff to review the metering accuracy in accordance with standards promulgated by the American Water Works Association. If the utility staff determines that the proposed meter size will accurately measure the flow, the proposed meter size will be approved. If the utility staff determines that the proposed meter size will not accurately measure the flow, the utility staff shall provide the developer's engineer by certified mail, return receipt requested, written notification of the rejection of the proposed meter size, the reason for rejection and the appropriate meter size to be used. The determination of the utility staff shall be final.
(Ord. No. 98-8, § 2, 12-3-97; Ord. No. 11-08, § 3, 7-6-11)
Ask a question about Miramar law
Corpus searches the Miramar sections it holds and shows the ones that match, with their citations. Free, no sign-in.