Sec. 21-94. - Wastewater discharge permit administration.

(a) Permit application/wastewater survey. (1) It is unlawful to discharge industrial waste without a city wastewater discharge permit in any area under the jurisdiction of the city's wastewater system; or to any person outside the system who are, by contract or agreement with the city, users of the city's WWF; and/or to the WWF any wastewater except as authorized by the director in accordance with the provisions of this division. Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this division and shall subject the permittee to sanctions set out in sections 21-98 through 21-100. Obtaining a wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state, and local law. The director may require other industrial users, including liquid waste haulers and nondischarging industrial users to obtain wastewater discharge permits as necessary to carry out the purposes of this division. (2) All prospective industrial users must submit to the director information on the nature and characteristics of their wastewater by completing a wastewater discharge permit application/wastewater survey at least one hundred eighty (180) days prior to the date upon which any discharge will begin. The director is authorized to prepare a form for this purpose and may periodically require industrial users to update the survey. Information to be provided with the survey may include the industrial user's identifying information (e.g., name and address of industrial user), information of any applicable environmental permits held by the IU, and location(s) for monitoring wastes covered by the permit, description of the industrial activity, specifications of the constituents inherent to the processes and wastes, identification of the wastewater characteristics, plumbing diagrams, number of employees and hours of operation, and any other information deemed necessary by the director to evaluate the permit application. Failure to complete this survey shall be reasonable grounds for terminating service to the user and shall be considered a violation of this division. (3) Within ninety (90) days of receipt of a complete wastewater discharge permit application, the director will determine whether or not to issue a wastewater discharge permit. Permits will be issued to all users determined to be significant industrial users as defined in this section. Permits may also be issued to minor users as deemed necessary by the director to ensure compliance with this division. The director may deny any application for a wastewater discharge permit. (4) Any user which discharges industrial waste into the WWF prior to the effective date of this division are granted temporary authority to continue to discharge in compliance with the existing codes, regulations, and policies of the city. Those users who wishes to continue such discharges, shall apply for a wastewater discharge permit within ninety (90) days after the effective date of this division. The user shall not cause or allow discharges to the WWF to continue after one hundred and eighty (180) days of the effective date of this division, except in accordance with a wastewater discharge permit issued by the director. (5) Any existing industrial user located outside of the city's jurisdiction shall submit a wastewater discharge permit application within ninety (90) days of the effective date of this division. New industrial users located outside the city's jurisdiction shall submit the applications to the director one hundred and eighty (180) days prior to any proposed discharge into the WWF. Alternatively, the director may enter into an agreement with the neighboring jurisdiction in which the industrial user is located to provide for the implementation, and enforcement of the pretreatment program requirements against said user. (b) Application signatories and certification. (1) All wastewater discharge permit applications and industrial user reports must contain the following certification statement and be signed by an authorized representative of the industrial user: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (2) Annual certification for non-significant categorical industrial users. A facility determined to be a non-significant categorical industrial user by the director pursuant to section 21-91 (definition of SIU subsection (3)) and section 21-94(a)(3) must annually submit the following certification statement signed in accordance with the signatory requirements in 1.4 C [Note: See 40 CFR 403.120(l)]. This certification must accompany an alternative report required by the superintendent: Based on my inquiry of the person or persons directly responsible for managing compliance with the categorical pretreatment standards under 40 CFR, I certify that, to the best of my knowledge and belief that during the period from MM/DD/YYYY to MM/DD/YYYY [Month, Day, Year]: a. The facility described as [Facility Name] met the definition of a non-significant categorical industrial user as described in 1.4 GG (3); [Note: See 40 CFR 403.3(v)(2)] b. The facility complied with all applicable pretreatment standards and requirements during this reporting period; and c. The facility never discharged more than one hundred (100) gallons of total categorical wastewater on any given day during this reporting period. This compliance certification is based on the following information: [Fill in pertinent information]. (3) If the designation of an authorized representative is no longer accurate because a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this section must be submitted to the director prior to or together with any reports to be signed by an authorized representative. (4) A facility determined to be a non-significant categorical industrial user by the director pursuant to section 21-91(b)(3) must annually submit the signed certification statement in section 21-95(c)(1). (c) Permit issuance process. (1) Wastewater discharge permits shall be expressly subject to all provisions of this division and all other applicable regulations. The cost of said permit shall be incurred by the industrial user in accordance with the fee schedule as set forth in section 21-102 of this division and Article VI "Rates, Charges, Billing and Collection Procedures." (2) Permit duration shall not exceed two (2) years and upon expiration of same, a renewal permit may be issued which shall be effective for an additional two (2) years provided that the conditions of the existing permit have not changed and the appropriate renewal fees have been paid. The permit shall be displayed by the industrial user in a location at the permitted facility so as to be seen and read by the general public. (3) Wastewater discharge permits shall contain at a minimum, the following conditions: a. A statement that indicates wastewater discharge permit duration; b. A statement of nontransferability; c. Pretreatment standards and effluent limits applicable to the user based on applicable standards in federal, state, and local law; d. Self monitoring, sampling, reporting, notification, and record keeping requirements; e. Statement of applicable civil, criminal, and administrative penalties for violation of pretreatment standards and requirements. (4) Wastewater discharge permits may contain the following additional conditions: a. The unit charge or schedule of user charges and fees for management of the wastewater to be discharged to the WWF; b. Limits on the instantaneous, daily, monthly average and/or four-day maximum concentration, mass, or other measure of identified wastewater constituents and characteristics; c. Limits on the average and/or maximum rate and time of discharge and/or requirements for flow regulations and equalization; d. Requirements for installation and maintenance of inspection facilities, and flow metering and sampling equipment; e. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the WWF; f. Development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or routine discharges; g. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the WWF; h. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; i. Other conditions as deemed appropriate by the director to ensure compliance with this division, and federal and state laws, rules, and regulations. (d) Compliance schedules. If additional pretreatment and/or operation and maintenance will be required to meet the pretreatment standards, the user shall submit to the director for approval and incorporation in the permit the shortest schedule by which the user is to provide additional pretreatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standards: The following conditions shall apply to this schedule: (1) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). (2) No increment referred to in paragraph (a) shall exceed nine (9) months. (3) Not later than fourteen (14) days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the director including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the project to the schedule established. In no event shall more than nine (9) months elapse between the progress reports to the director. (e) Permit transfer. Wastewater discharge permits are issued to a specific user for a specific operation. A wastewater discharge permit may not be reassigned, transferred or sold to a new owner or new user unless the permittee gives at least ninety (90) days advance written notice to the director and the director approves the wastewater discharge permit transfer. The notice to the director shall include a written certification by the new owner and/or user that: (1) States that the new owner and/or user has no immediate intent to change the facility's operations and processes; (2) Identifies the specific date on which the transfer is to occur; (3) Acknowledges full responsibility for complying with the terms and conditions of the existing permit. Failure to provide advance notice of a transfer renders the wastewater discharge permit voidable on the date of facility transfer. (f) Permit appeal. (1) The director shall provide public notice of the issuance of a wastewater discharge permit. Any person, including the user, may petition the city to reconsider the terms of a wastewater discharge permit within fifteen (15) days of its issuance. Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal. (2) In its petition, the appealing party must indicate the wastewater discharge provisions objected to, the reasons for the objection, and the alternative condition, if any, it seeks to place in the wastewater discharge permit. (3) The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal. (4) If the city fails to act within fifteen (15) days, a request for reconsideration shall be deemed to be denied. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit, or not to modify a wastewater discharge permit, shall be considered final administrative action for purposes of judicial review. (g) Permit modification. Permits may be modified by the city for causes including, but not limited to the following: (1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; (2) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance; (3) A change in the WWF that requires either a temporary or permanent reduction or elimination of the authorized discharge; (4) Information indicating that the permitted discharge poses a threat to the city's WWF, city personnel, or the receiving waters; (5) Violations of any terms or conditions of the wastewater discharge permit; (6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; (7) Revision of or a grant of variance from categorical pretreatment standards pursuant to Rule 62-625.700, F.A.C.; (8) To correct typographical or other errors in the wastewater discharge permit; (9) To reflect a transfer of the facility ownership and/or operation to a new owner/operator. (10) Upon request of the permittee, provided such request does not create a violation of any applicable requirements, standards, laws, or rules and regulations. Industrial user requests for permit modifications shall be made in writing and include facts or reasons which support the request. When modifying a permit, the city shall allow a reasonable time frame for the user to comply with the new or changed conditions if the user cannot meet them at the time of the modification and if permitted by law. If the new or changed conditions are the result of new or changed pretreatment regulations, those regulations will stipulate the compliance period. The filing of a request by the permittee for a wastewater discharge permit modification does not stay any wastewater discharge permit condition. (h) Permit revocation. Wastewater discharge permits may be revoked for the following reasons: (1) Failure to notify the city of significant changes to the wastewater prior to the changed discharge. (2) Failure to provide prior notification to the city of changed condition pursuant to section 21-95(f). (3) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application. (4) Falsifying self-monitoring reports. (5) Tampering with monitoring equipment. (6) Refusing to allow the city timely access to the facility premises and records. (7) Failure to meet effluent limitations. (8) Failure to pay penalties. (9) Failure to pay sewer charges. (10) Failure to meet compliance schedules. (11) Failure to provide advance notice of the transfer of a permitted facility. (12) Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this division. (13) Indication that the discharge presents a threat to the environment or threatens to interfere with the operation of the WWF. Wastewater discharge permits shall be voidable upon nonuse, cessation of operations, or transfer of business ownership. All wastewater discharge permits are void upon the issuance of a new wastewater discharge permit. (i) Permit renewal. All permittees must apply for a permit renewal a minimum of ninety (90) days prior to the expiration of the existing permit. The reapplication for a permit shall consist of a written request for reissuance of the permit. The request shall state if all terms and conditions of the existing permit and ordinance are complied with and must be signed by an authorized representative of the user. (j) Special agreements. The city reserves the right to enter into special agreements with industrial users setting out special terms under which they may discharge to the WWF. In no case will a special agreement waive compliance with a categorical pretreatment standard or requirement. (k) Regulation of discharge from other jurisdictions. In the event another jurisdiction or municipality contributes all or a portion of its wastewater to the city's WWF, the WWF may require the jurisdiction or municipality to enter into an multi-jurisdictional agreement with the city. (1) Prior to entering into an agreement, the director shall request the following information from the contributing jurisdiction: a. A description of the quality and volume of the wastewater at point(s) where it enters the WWF from the contributing jurisdiction. b. An inventory of all industrial users discharging to the WWF within the contributing jurisdiction. c. Other information as may be required by the director. (2) A multi-jurisdictional agreement as required above, shall contain the following conditions: a. A requirement for the contributing jurisdiction to adopt a sewer use ordinance which is at least as stringent as this division and local limits which are at least as stringent as those set out in section 21-92. The requirement shall specify that the ordinance and limits must be revised as necessary to reflect changes made to this division. b. A requirement for the contributing jurisdiction to submit a revised industrial user inventory on at least an annual basis. c. A requirement for the contributing jurisdiction to (i) conduct pretreatment implementation activities including industrial user permit issuance, inspection and sampling, and enforcement; or (ii) authorize the WWF to take or conduct the activities on its behalf. d. A requirement for the contributing jurisdiction to provide the city with access to all information that the municipal user obtains as part of its pretreatment activities. e. Limits on the nature, quality, and volume of the contributing jurisdiction wastewater at the point where it discharges to the WWF. f. Requirements for monitoring the municipal discharge. g. A provision ensuring the director access to the facilities of users located within the contributing municipality's jurisdictional boundaries for the purpose of inspection, sampling, and any other duties deemed necessary by the director. h. A provision specifying remedies available for breach of the terms of the multi-jurisdictional agreement. (3) Violation of the terms and conditions of the multi-jurisdictional agreement subjects the contributing jurisdiction to the sanctions set out in sections 21-98 through 21-100.

(Ord. No. 99-3, 11-18-98; Ord. No. 12-15, § 2, 5-2-12)