For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-169 — Bulkhead design

Code of the City of Miramar, Florida (Supp. No. 105: codified through Ordinance No. 26-10, adopted July 8, 2026) · Miramar City Code § 22-169

Corpus is an independent public-information project, not the official City of Miramar website. Stable reference: corpuslaw.us/code/b8b57832-cbd3-483c-b31a-ce84a05c476e

Sec. 22-169. - Bulkhead design.

The bulkhead design, drawings and specifications, shall be prepared by a registered engineer of the state and submitted to the city engineer for approval. The city engineer may at his or her option require copies of design calculations, borings or other soil investigations for his or her review prior to his or her approval. The design shall conform to accepted standards and applicable codes, and shall take into consideration a moving surcharge equal to that imposed by necessary canal maintenance equipment. Bulkheads shall be constructed of durable materials suited for the service and exposure. No wood bulkhead construction shall be permitted. The elevation of the top of the bulkhead shall be USC&GS MSL datum.

(Code 1964, § 7-4)

Ask a question about Miramar law

Corpus searches the Miramar sections it holds and shows the ones that match, with their citations. Free, no sign-in.