§ 59.206 — Stormwater Level of Service
Code of the City of Orlando (Supp. No. 93, Update 1: codified through Ordinance No. 2026-10, adopted April 6, 2026) · Orlando City Code § 59.206
Corpus is an independent public-information project, not the official City of Orlando website. Stable reference: corpuslaw.us/code/4c0b8399-85c0-4904-af7c-c94cdaa58eb7
Sec. 59.206. - Stormwater Level of Service.
Stormwater level of service shall be used to determine whether levels of service for Stormwater are adequate to support the impacts of new development, pursuant to Part 3 of this Chapter. Stormwater Level of Service Standards. Stormwater level of service standards for new development shall be consistent with the Engineering Standards Manual as follows: Facility | LOS City Primary | Design Storm: 25 year/24 hour. Max. Flood Stage: 100 yr/3 day below flood elevation. Max. Hydraulic grade line (HGL): at gutter elevation for 25 year/6 hour storm. City Secondary | Design Storm: 10 year/6 hour. Max. HGL: 1 foot below gutter elevation. Check Storm: 25 year/6 hour. Max. HGL: at gutter elevation. City Tertiary | Design Storm: 10 year/6 hour. Max. HGL: at 1 foot below gutter elevation. Check Storm: 25 year/6 hour. Max. HGL: at gutter elevation. Arterial Road | Roadway Section and Inlet Design: 10 year/6 hour storm. Minimum 2 feet between seasonal high water table and bottom of base course. Collector Road | Roadway Section and Inlet Design: 5 year/6 hour storm. Minimum 1 foot between seasonal high water table and bottom of base course. Minor Road | Roadway Section and Inlet Design: 3 year/6 hour storm. Minimum 1 inch between seasonal high water table and bottom of base course. Travel Lane Spread | 12 feet for all roads; roads with parking lane, width measured from face of curb to centerline of the outermost travel lane; clearance between design water surface and top of curb: 1 inch. Maximum Run Distance | 400 Feet to first Inlet. Retention Ponds | Per Water Management District Criteria. Detention Ponds | Per Water Management District Criteria. Detention Ponds (landlocked basins) | Per Water Management District Criteria. Floodprone Areas | Development allowed in 100 year floodplain with compensatory storage loss for floodplain and no development in the floodway. ;hn0; (Ord. of 9-16-1991, Doc. #25096; Ord. of 11-16-1992, Doc. #26149; Ord. No. 2017-4, § 1(Exh. A), 2-27-2017, Doc. #1702271206)
Ask a question about Orlando law
Corpus searches the Orlando sections it holds and shows the ones that match, with their citations. Free, no sign-in.
