For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 63.233 — Post-Development Groundwater Infiltration Volumes

Code of the City of Orlando (Supp. No. 93, Update 1: codified through Ordinance No. 2026-10, adopted April 6, 2026) · Orlando City Code § 63.233

Corpus is an independent public-information project, not the official City of Orlando website. Stable reference: corpuslaw.us/code/283ddd5c-dac5-4b32-80f5-5460ae84ab24

Sec. 63.233. - Post-Development Groundwater Infiltration Volumes.

Post-development groundwater infiltration rates and volumes within primary groundwater recharge areas shall meet the least restrictive of the following standards: (a) Post-development rates and volumes must be at least equal to pre-development rates and volumes; or (b) Post-development rates and volumes must achieve at least 70% infiltration to the aquifer of all on-site stormwater. This standard may be achieved by means of natural infiltration, ponding for stormwater retention/detention, structural exfiltration systems or any other method which conforms to the requirements of the Orlando Urban Stormwater Management Manual (OUSWMM).

(Ord. of 9-16-1991, Doc. #25100; Ord. of 12-19-1994, Doc. #28065-1)

Ask a question about Orlando law

Corpus searches the Orlando sections it holds and shows the ones that match, with their citations. Free, no sign-in.