§ 172.041 — RAC-PUD REQUIRED EXHIBITS
Palm Bay City Code (2026 S-41) · Palm Bay City Code § 172.041
Corpus is an independent public-information project, not the official City of Palm Bay website. Stable reference: corpuslaw.us/code/9ecc1547-acf6-42fb-a4c1-eff3c94ec46f
§ 172.041 RAC-PUD REQUIRED EXHIBITS.
Processing a preliminary development plan and a final development plan for a RAC PUD shall require the same submittals as a PUD, in addition to the following. (A) Required exhibits for RAC-PUDs preliminary development plan. Application for planned unit developments on sites classified as regional activity center (RAC) on the future land use map shall include the following. (1) Concept plan. A generalized plan that establishes the allowable land uses and the allowable development density or intensity ranges. The concept plan shall include: (a) The general location of residential areas (including maximum density and unit types), open space, parks, passive or scenic areas, and nonresidential areas (including maximum building square footage or other intensity maximums). (b) A plan of vehicular and pedestrian circulation showing the general locations and right-of-way widths of roads, sidewalks, the capacity of the system and major access points to the external and internal thoroughfare network. (c) A summary of allowable development, including: 1. The total acreage of the district and each phase, as may be proposed; 2. The acreage of areas proposed for specific land uses proposed to be allowed within the district and phases proposed, as may be applicable; 3. The acreage of open space or conservation areas within the district and phases proposed; 4. The minimum and maximum allowable residential density to be allowed within the district and each phase proposed; and 5. The minimum and maximum allowable nonresidential development intensity to be allowed within the district and each phase. (d) A written analysis identifying consistency with the adopted comprehensive plan and how the proposed development is consistent with the intent of the PUD zoning category. (2) Generalized regulations and development standards. The application shall contain standards for development within the district and each phase, including the following. Development features not specifically addressed in the design standards must comply with the LDC. In the event of a conflict, the most stringent requirement shall apply. (a) Principles of the development plan; (b) An itemized list of uses proposed to be allowed in the district by phase; (c) General lot dimensions and size; (d) Transit development and mobility standards for streets, bicycle lanes, trails, and sidewalks, including proposed dimensions of internal streets, sidewalks, and other transportation facilities (such standards may be conveyed through annotated diagrams); (e) Resource and activity-based open space provisions; (f) Infrastructure and engineering development standards; (g) Lighting standards; (h) Signage standards; and (i) Perimeter buffering, and landscaping standards. The concept plan may establish additional development and design standards for other development and design characteristics and elements so long as these standards are consistent with the comprehensive plan. (3) The concept plan shall also include additional items identified at the pre-application conference by city staff that, by their nature, are unique to the specific location of the project or development proposal. (4) Site condition maps and data that include: (a) A legal description of the properties included in the application with an associated boundary survey signed and sealed by a registered Florida land surveyor. (b) Name of the RAC PD; the owners of all properties included in the district; the agent for the application, and address and phone number of the agent; and, date of drawing and of any subsequent revision. (c) Scale, north arrow, and general location map showing relationship of the site to external uses, structures, and features. (5) Natural resource assessment. The preliminary development application shall include an assessment of the property identifying major environmental features of the site and endangered wildlife and vegetation. (6) Traffic study. A traffic study meeting generally accepted engineering practices and in accordance with the City of Palm Bay Standardized Traffic Impact Study Guidance Manual examining the impact of the proposed development on the surrounding roadway network. (B) Required exhibits for RAC PUD final development plan. In addition to the exhibits identified in § 172.031(A), the following documents shall be attached to the final development plan application. The final development plan may pertain to an entire RAC-PUD district or one or more phases of the project. The final development plan shall include: (1) Final development plan. A detailed plan that establishes the specific locations and boundaries for all lots to be developed, rights-of-way, public easements and provides detailed development standards for all properties within the phase being reviewed. (a) A specific plan for the use of all lands within the proposed RAC PUD or phase. Such plans shall indicate the specific location and layout of residential areas (including maximum density and unit types), open space, parks, passive or scenic areas, and nonresidential areas (including maximum building square footage or other intensity maximums). (b) A plan of vehicular and pedestrian circulation showing the specific locations and right-of-way widths of roads, sidewalks, the capacity of the system and major access points to the external and internal thoroughfare network. (c) A summary of allowable development. The summary shall provide: 1. The total acreage of the district and the specific phase for which final development plan approval is being sought; 2. The acreage of areas proposed for specific land uses proposed in the final development plan, as may be applicable; 3. The acreage of open space or conservation areas within the specific phase proposed in the final development plan; 4. The minimum and maximum allowable residential density to be allowed within the phase proposed; and 5. The minimum and maximum allowable nonresidential development intensity to be allowed within the phase. (2) Specific regulations and development standards applicable to the phase, including: (a) Principles of the development plan; (b) An itemized list of uses proposed to be allowed in the phase; (c) Lot dimensions and size; (d) Dimensions of internal streets, sidewalks, and other transportation facilities (such standards may be conveyed through annotated diagrams); (e) Resource and activity-based open space provisions; (f) Perimeter buffering, and landscaping standards; (g) Lighting standards; (h) Signage standards; and (i) Specific architectural design standards. The final development plan may establish additional development and design standards for other development and design characteristics and elements so long as these standards are consistent with the comprehensive plan. (3) Site condition maps and data that include: (a) A legal description of the properties included in the application with an associated boundary survey signed and sealed by a registered Florida land surveyor. (b) Name of the RAC PD; the owners of all properties included in the district; the agent for the application, and address and phone number of the agent; and, date of drawing and of any subsequent revision. (c) Scale, north arrow, and general location map showing relationship of the site to external uses, structures, and features. (4) Conservation area management plan (CAMP). The preliminary development application shall include a CAMP which shall: An environmental assessment of the property identifying major environmental features of the site and endangered wildlife and vegetation and description of permitting in process or completed. (a) Identify all jurisdictionally defined wetlands and environmentally sensitive areas; (b) Provide for wildlife corridors; (c) Designate the property to be placed in conservation easements; (d) Promote interconnected linkage between existing conservation or jurisdictional areas, activity- or resource-based open space, and the land within the RAC; and (e) Provide a minimum buffer of twenty-five (25) feet adjacent to all jurisdictional wetlands. (5) Traffic study. A traffic study meeting generally accepted engineering practices and in accordance with the City of Palm Bay Standardized Traffic Impact Study Guidance Manual examining the impact of the proposed development on the surrounding roadway network and the proposed improvements necessary to support the phase of development proposed in the final development plan. (6) Services. Specific plans and designs for the provision of potable water and sanitary sewer, electric power, gas and other public utilities and services, as applicable. (7) Maintenance. Identification of planned maintenance responsibility for all aspects of the development. Specifically identify all facilities proposed for maintenance by the city or other governmental entities. (8) Exceptions. Identification of all exceptions to city construction and design standards proposed for the development. Exceptions include, but are not limited to, modification of required street or roadway right-of-way and pavement requirements, signage, location of utilities, design of utilities and drainage facilities, easement widths and locations and modifications proposed to any public improvement. (9) Schedule. Proposed schedule for construction of all infrastructure and estimates of the buildout for the development phase proposed. (C) Joint approvals. (1) Final construction plans are not required to, but may, be submitted concurrently as part of the final development plan application. The applicant shall, however, provide sufficient detail in plans and proposals to permit the Council to ascertain the feasibility of future construction including infrastructure demand and supply issues. (2) Joint RAC concept and final development plan application. At the option of the applicant, a RAC PUD concept plan may be reviewed simultaneously with a RAC PUD final development plan. In addition, modifications to an approved concept plan may be made as part of the approval process for a final development plan. All applicable requirements for both the concept plan and the final development plan submittal applications must be addressed. (D) Administrative process following final development plan approval. Physical development of the property must be consistent with the approved Concept plan and final development plan for the RAC. Administrative review and approval processes for subdivisions, site plans, building permits and other land development regulations shall ensure such consistency. Substantial changes, as determined by the City Manager or designee, shall require re-submittal for final development plan approval. Minor changes not deemed to be substantial may be approved administratively. (Ord. 2024-33, passed 9-19-24)
Ask a question about Palm Bay law
Corpus searches the Palm Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.
