§ 177.023 DRAINAGE PLAN.
(A) Approval required; exceptions. (1) Prior to initiating any of the following activities, a drainage plan must be approved by the City Engineer, unless exempted under Florida Statutes or other local ordinance, and such official exemption has been issued by the governmental entity having jurisdiction, such as, the St. Johns River Water Management District, Florida Department of Environmental Protection, or the United States Army Corps of Engineers (if wetlands or other surface waters are impacted). (a) Recording a plat or subdividing land; (b) Altering, rerouting, deepening, widening, obstructing or modifying the configuration of an existing drainage facility or permitted stormwater management system or natural hydrologic system in any way; (c) Commencing development for subdivisions, shopping centers, commercial or industrial facilities; or (d) Commencing any other development which may: 1. Significantly increase or decrease the rate or quantity of stormwater runoff; 2. Degrade the quality of surface or ground water; 3. Adversely affect any wetlands, watercourse, water body, or surface waters. (2) For the purpose of this section, development within a subdivision shall not require approval of a stormwater management plan if each of the following conditions have been met: (a) Drainage provisions for the subdivision were previously approved by the City Engineer or designee, and an Environmental Resource Permit has been obtained from the St. John's River Water Management District or State 404 Permit if applicable and the construction phase of the permit has not expired, or the permit is in the operation and maintenance phase and the stormwater drainage system is functioning as designed and authorized; (b) The development is conducted in substantial accordance with the drainage provisions contained in the approved final development plan and construction plans, and as authorized by a valid Environmental Resource Permit or State 404 permit if applicable. (3) Normal maintenance activities which do not alter drainage discharge location, peak rate, or elevation, and do not cause or contribute to water quality degradation are exempt. This must be demonstrated through provision of a maintenance activity plan, including stormwater pollution prevention best management practices. (4) A single-family or duplex residential dwelling to be built and inhabited by the applicant may be excluded from the requirements of this subchapter upon determination by the City Engineer that such construction will not adversely impact the city's MS4 drainage system. (5) The City Council, upon consultation with the City Engineer, may grant a written variance from any requirement of this section using the following criteria: (a) Any variance granted under this subsection shall comply with the Water Resource Implementation Rule, and the FDEP and SJRWMD stormwater management goals and plans pursuant to the Surface Water Improvement and Management Act; and (b) The granting of the variance will not: 1. Significantly increase the rate or volume of stormwater runoff to receiving waters; 2. Significantly decrease recharge to adjacent wetlands; 3. Significantly contribute to the degradation of water quality of an impaired waterbody with an established Total Maximum Daily Load (TMDL) and/or Basin Management Action Plan, such as the Indian River Lagoon, St. John's River, or Turkey Creek; 4. Adversely impact adjacent properties; 5. Otherwise impair attainment of the objectives of this subchapter. (6) An impervious surface that is not a part of a larger common plan of development or sale, may be excluded if less than five thousand (5,000) total square feet is created or less than four thousand (4,000) square feet subject to vehicular traffic, upon determination by the City Engineer that such construction will not adversely impact the city drainage system (MS4) or natural wetlands or surface waters. (7) The applicant shall demonstrate compliance for other land uses with the above drainage plan requirements by providing signed and sealed plans and, if deemed necessary, signed and sealed hydrologic and hydraulic calculations, topographical survey, or geotechnical reports, or best available information as deemed necessary by the City Engineer to demonstrate compliance with the above standards. (B) Contents. (1) It is the responsibility of an applicant to include in the stormwater management plan sufficient information for the Planning & Zoning Board and the City Council to evaluate the environmental qualities of the affected area, the potential and predicted impacts of the proposed activity on affected waters, and the effectiveness and acceptability of these measures proposed by the applicant for reducing adverse impacts. The stormwater management plan shall contain maps, charts, graphs, tables, photographs, narrative descriptions and explanations, and citations to supporting references. The stormwater management plans and calculations shall be signed and sealed by a Professional Engineer registered in the State of Florida and comply with accepted engineering standards for site/land development and construction. Substandard work shall not be accepted. (2) The stormwater management plan shall be a part of the construction plan and separate from the final plat, shall contain the name, address, and telephone number of the owner/developer. In addition, the legal description of the property shall be provided, and its location with reference to such landmarks as major water bodies, adjoining roads, railroads, subdivisions, or towns shall be clearly identified by a map. (3) The existing environmental hydrologic conditions of the site and of receiving waters and wetlands shall be described and mapped in the construction plans and drainage system report Pre-Development Conditions, including the following: (a) The direction, flow rate, and volume of flow of surface water runoff under predevelopment conditions; (b) The location of areas on the site where surface waters collect and percolate into the ground; (c) A geotechnical survey performed within ten years if there have been no significant site alterations or development and within one year, with significant site alteration or development; (d) A description of all watercourses, water bodies, and wetlands on or adjacent to the site or into which surface waters flow/discharge. Information regarding their water quality and the current water quality classification or impairment status and pollutants of concern, if any, given them by the Florida Department of Environmental Regulations shall be included; (e) Groundwater levels, including seasonal fluctuations, using U.S. Soil Conservation Service (SCS) methodology or other acceptable engineering standards means; (f) A description of the topography, including a signed and sealed topographical survey representative of the current site conditions, soils, vegetation, and location of the floodplain (according to the latest edition of the Flood Insurance Rate Map, FIRM). (4) Proposed site development activities shall be described and shown in detail in the construction plans, including: (a) Changes in topography; (b) Areas where vegetation will be cleared or otherwise killed; (c) Areas that will be covered with an impervious surface and description of the surfacing material; (d) Areas that will be subject to vehicular traffic; (e) The size and location of buildings or structures; and (f) Proposed stormwater management facilities. (5) Predicted impacts of the proposed development on existing conditions shall be described and mapped, including: (a) Changes in water quality by performing a pre- vs post-development runoff nutrient, or pollutant loading analysis; (b) Changes in groundwater levels as applicable to wetland drawdown; (c) Changes to groundwater quality based upon proposed land use; (d) Changes in the extent of flooding on the site and upstream and downstream from it; (e) Changes in water quantity demonstrated by performing a pre- vs post-development peak discharge rate and volume analysis (if deemed appropriate) for the entire basin in which the site is located, including offsite upstream properties that flow to, or over the site and downstream properties that receive runoff; (f) Impact on the health of conserved or mitigated wetlands and wetland habitats; and (g) Impact on natural conserved vegetation. (6) All components of the drainage system that the Public Works or Low Impact Development Guidance Manuals require, and all measures to detain, retain, or infiltrate post-development runoff for attenuation of peak flows, reduction of volume, and water quality treatment or pollutant removal shall be described and mapped in the construction plans (post-development conditions), including: (a) The channel direction and specifications of best management or integrated management practices that attenuate flow rate, volume and enhance quality of stormwater that will be conveyed from the site, with a comparison to predevelopment conditions; (b) Detention or retention areas, including plans and specifications for the discharge of contained waters, including water quality treatment volumes, peak discharge rates, weir and orifice elevations, normal and seasonal high groundwater elevations, tailwater elevations, soil infiltration rates, and stage-storage volume-discharge tables, with pollutant load reductions calculated based on the latest accepted scientific literature, which should be provided as supporting documentation, and/or accepted water quality treatment modelling programs. In addition, detention or retention areas shall be a separate common areas maintained by a designated operation and maintenance entity with a maintenance plan and covenants which travel with the land, and shall not be part of front or back yards of single-family residential homes. Therefore, subdivisions shall have separate tracts of land dedicated to stormwater detention/retention; (c) These separate areas of the site shall be used or reserved for percolating water into the ground, with plans to mitigate groundwater quality if necessary; (d) A detailed stormwater pollution prevention plan for the control of erosion and sedimentation, which specifies in detail the type and location of control measures that will remain in place until the site is stabilized by vegetation upon construction completion, the stage/phase of development at which they will be properly installed and provisions for their maintenance; (e) Any other information which the developer, the Planning & Zoning Board and the City Council consider necessary for an evaluation of the proposed development. (7) The data required for submittal are considered the minimum in order for the Department of Public Works to properly evaluate the system and ascertain its impact on existing facilities. (8) All consultants should review the Public Works Manual for the requirements as it relates to the specific project. A pre-application meeting is strongly recommended in order to avoid delays in the approval process. (Ord. 2024-33, passed 9-19-24)
Ask a question about Palm Bay law
Corpus searches the Palm Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.