§ 8-38 — Milestone inspections for condominiums and cooperative buildings
Code of Ordinances, City of St. Petersburg, Florida (Supp. No. 55, Update 2: codified through Ordinance No. 646-H, adopted August 27, 2026) · St. Petersburg City Code § 8-38
Corpus is an independent public-information project, not the official City of St. Petersburg website. Stable reference: corpuslaw.us/code/d4ee3363-e168-485c-bae4-3c0d0aea348c
Sec. 8-38. - Milestone inspections for condominiums and cooperative buildings.
(a) Definitions. The following words, terms and phrases, when used in this section shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning. (1) Milestone Inspection means a structural inspection of a building, including an inspection of load-bearing elements and the primary structural members and primary structural systems as those terms are defined in F.S. §627.706, by an architect licensed under chapter 481 or engineer licensed under chapter 471 authorized to practice in this state for the purposes of attesting to the life safety and adequacy of the structural components of the building and, to the extent reasonably possible, determining the general structural condition of the building as it affects the safety of such building, including a determination of any necessary maintenance, repair, or replacement of any structural component of the building. (2) Qualified Building means a building that is three habitable stories or more in height as determined by the Florida Building Code and that is subject, in whole or in part, to the condominium or cooperative form of ownership as a residential condominium under chapter 718 or a residential cooperative under chapter 719, Florida Statutes. The term does not include a single-family, two-family, three-family, or four-family dwelling with three or fewer habitable stories above ground. (3) Substantial Structural Deterioration means substantial structural distress or substantial structural weakness that negatively affects a building's general structural condition and integrity. The term does not include surface imperfections such as cracks, distortion, sagging, deflections, misalignment, signs of leakage, or peeling of finishes unless the licensed engineer or architect performing the phase one or phase two inspection determines that such surface imperfections are a sign of substantial structural deterioration. (b) Timeline for Inspections. An initial milestone inspection must be performed by December 31 of the year in which a qualified building reaches 30 years of age. The age of the building shall be calculated from the date the initial certificate of occupancy for the building was issued. Subsequent milestone inspections must be performed every ten years after the date of the initial milestone inspection. (c) Compliance. All owners or condominium associations of qualified buildings are required to comply with the following requirements: (1) Milestone inspection reports shall be completed using Milestone Inspection Report Forms in Appendix D of the Florida Building Code, Existing. (2) All qualified buildings must complete a Phase I milestone inspection and submit a complete report to the Building Official within 180 days of the date of notice from the City stating a milestone inspection is required. (3) If required by the Phase I report, all qualified buildings must submit a Phase II inspection report within 180 days of the submission date of the Phase I report. (4) All unit owners or tenants of qualified buildings must receive notices of all milestone inspection findings within 45 days of the date of submission of the report(s) to the Building Official. (5) The Building Official may issue an extension of not more than 60 days to submit a building milestone inspection report or to obtain any necessary permits upon a written extension request from the architect or engineer responsible for the Milestone Inspection. Such request shall contain a signed and sealed statement from the architect or engineer responsible for the Milestone Inspection that the building may continue to be occupied while undergoing the building milestone inspection. (6) Once all required repairs have been completed, the architect or engineer responsible for the milestone inspection and the report shall re-inspect the areas noted on the original report and shall provide the building owner, association, and Building Official an amended report with a signed and sealed letter stating that all of the required repairs and corrections have been completed and that the building or structure is acceptable for continued use under the present occupancy. The building owner or the architect or engineer responsible for the Milestone Inspection shall submit that letter to the building official. (d) Violations. Failure to meet any of the requirements of this section shall be a violation of this Code punishable as provided in Section 1-7.
(Ord. No. 624-H, § 1, 12-4-2025)
Ask a question about St. Petersburg law
Corpus searches the St. Petersburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.
