§ 19-128 — Tests and performance monitoring
Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee City Code § 19-128
Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/95b08885-e4fb-4ea1-b91e-048fdfad8edd
Sec. 19-128. - Tests and performance monitoring.
(a) Not later than 30 days after any new or substantially rebuilt portion of the system is made available for service to subscribers, the grantee shall conduct technical performance tests to demonstrate full compliance with all technical standards contained in this article and the franchise, and the technical standards and guidelines of the FCC. (b) Such tests shall be performed by a qualified technician. A report shall be submitted to the city, describing test results, instrumentation, calibration and test procedures, and the qualification of the technician responsible for the tests. (c) System monitor test points shall be established and such periodic tests shall be made at the test points as shall be required by the FCC or the franchise. (d) In addition to the performance test reports required in this section, a copy of any performance test report required by the FCC shall be submitted to the city within 60 days of completion. (e) If the city has a reasonable basis to believe that a grantee is not complying with one or more performance standards specified in rules or regulations promulgated by the FCC, it may provide notice of such noncompliance to the grantee. The grantee shall have 30 days after such notice to demonstrate that it is complying with applicable FCC standards. Thereafter, the city may conduct proof-of-performance tests to determine if the grantee is in compliance with FCC performance standards. The grantee shall have the right to conduct such proof-of-performance tests jointly with the city; provided, however, that the grantee's participation shall not unreasonably delay the testing. If the city's proof-of-performance testing demonstrates that the grantee does not comply with any performance standard, the grantee shall, within 30 days, reimburse the city for its testing costs and bring the cable system into compliance with such standard. (f) The city shall have the right to employ qualified consultants, if necessary or desirable, to assist in the review, evaluation and monitoring of the grantee's performance under this section or any other section of this article or the franchise.
(Code 1984, § 13-106(IX); Ord. No. 91-O-0004AA, § VI, 6-5-1991; Ord. No. 92-O-0026AA, § 1, 8-26-1992; Ord. No. 02-O-77AA, § 13-106(VIII), 12-11-2002)
Ask a question about Tallahassee law
Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.
