§ 3-181 — Special electrical installation requirements
Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee Land Development Code § 3-181
Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/92689be1-dae5-4ca7-877b-5db2f0d87c2a
Sec. 3-181. - Special electrical installation requirements.
All electrical installations shall conform to the following provisions: (1) A complete set of electrical plans shall be submitted to electrical inspection and electric departments for approval before work is started, except on single-family detached and duplex dwellings. Such plans to indicate location of service and whether overhead or underground, and a diagram showing feeder details shall be provided prior to the installation of the feeders. Such diagram shall show the area in square feet of the building or other structure supplied by each feeder, the total connected load before applying demand factors, the demand factors used, the computed load after applying demand factors and the size and type of conductors to be used. No electrical permit shall be issued until all corrections have been approved. Any work affecting the electrical service location, size, or size increase must be approved prior to permitting by the electric department. a. Before any service entrance is installed in any building, the customer, builder, contractor or his authorized representative shall obtain from the city electric department approval of the point where the service entrance shall be made. b. Prior to the permanent connection of any structure, the building or house number shall be permanently affixed to the meter can. The numbers shall be a minimum of one inch in height and in contrasting color to the meter can. (2) Any underground work on public rights-of-way shall be installed in accordance with underground utility placement plan after being permitted by the proper governing body. (3) Permanent electrical service shall not be connected to a structure until all fees, charges, assessments, etc., required to be paid prior to the certificate of occupancy being issued shall have been paid. (4) Until such time as the certificate of occupancy has been issued, the building official with cause may, upon 48 hours, written notice to the contractor and owner, authorize the permanent electrical power to be disconnected. All fees associated with connection and reconnection shall be borne by the contractor. (5) All connections from the electric lines of the city to the entrance wires of the consumer within the city shall be made in accordance with the requirements of the city and will be made by the city at a fee as indicated in the schedule of fees, payable in advance, provided such connections are made with overhead wires. If underground conduit wires are desired, the connection with the street pole line to the building shall be made at the expense of the consumer.
(Ord. No. 07-O-63, § 1, 11-20-2007)
Ask a question about Tallahassee law
Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.