For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3-575 — Procedures for implementation of this article

Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee Land Development Code § 3-575

Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/d926fb27-f894-4806-a193-1adcb00e9cef

Sec. 3-575. - Procedures for implementation of this article.

(a) The city commission may authorize the implementation of this article by resolution or, in the event that a meeting of the city commission cannot be scheduled within one week of a declaration of disaster, the city manager or designee may implement the provisions of this article upon determining that post-disaster circumstances are such that adequate repair or reconstruction of a significant number of structures in the city or in specific areas of the city will require substantial time to complete. (b) After a determination that the implementation of this article is desirable, permits allowing temporary waiver of non-conformity shall be allowed. Such permits shall be issued only upon the determination of the building official that the original structure is uninhabitable. (c) The initial term of the permit allowing a non-conforming structure to remain in use and on site will be six months from the date of a declaration of state of emergency. If multiple declarations are issued for one disaster, the date of the latest declaration shall govern. After this initial term, should the city commission determine that circumstances are such that safe and efficient reconstruction of damaged properties warrant the extension of the permit period, the commission may issue a resolution allowing for a three-month extension of all issued permits. The commission may grant additional three-month extensions by resolution. (d) Should the commission determine that extension of all temporary use permits issued pursuant to this section is not necessary, the commission may, by resolution, authorize staff to grant extensions to individual permit holders who were unable to complete reconstruction in the permitted time because of extenuating circumstances beyond the permit holder's control including, but not limited to, a local shortage of building materials, or properly licensed contractors. (e) Without requiring an extension of a previously issued temporary use permit, a new temporary use permit may be issued for a structure damaged by a subsequent disaster, if that structure was previously issued a temporary use permit which has not expired, and so long as the terms of this article were activated by the city manager to address damage caused by the subsequent disaster. (f) As a condition for receiving a temporary use permit, the applicant must complete a land use affidavit and agreement with the city wherein the applicant shall agree to remove the temporary recreational vehicle, mobile or manufactured home, or manufactured building within 30 days of the issuance of the certificate of occupancy for the new or rehabilitated residential or non-residential use or upon expiration of the temporary use permit, whichever occurs first. The city commission delegates the authority to execute the provisions of the contract on behalf of the city to the city manager or designee.

(Ord. No. 06-O-65, § 2, 12-13-2006)

Ask a question about Tallahassee law

Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.