For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-152 — Site plan review process

Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee Land Development Code § 9-152

Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/b1a0c217-3bb7-4b39-b257-de2df9a5c207

Sec. 9-152. - Site plan review process.

(a) Application. A site plan application is required for review Types A, B, C and D. The difference between the review types is the level of detail required by the land use administrator or technical assistance staff, in the land use compliance certificate. The submittal requirements for site plan review are listed in this section. The land use administrator may waive specific submittal requirements. (b) Submittal requirements. (1) The applicant shall submit to the land use administrator a detailed statement of objectives indicating: a. The general purpose of the development; b. The density, number and type of dwelling units to be constructed; c. The method and time schedule of development and improvements to be made as part of the project; d. The type and square footage of nonresidential development including floor area ratios, pervious and impervious surface areas, and other standards as may be required; and e. For any site plan including 50 or more residential units, the applicant shall include a statement indicating whether the residential units are intended to be owner occupied or rental units. For those site plans with 50 units or more intended to be owner occupied, affordable on-site housing units shall be provided pursuant to article VI in this chapter. (2) A site conditions map drawn to an appropriate engineering scale sufficient to show and to depict the location of existing property lines for both private and public property (boundary survey, signed and sealed by a surveyor), existing contours shown at a contour interval of no greater than two feet, streets, buildings, watercourses, transmission lines, sewers, bridges, culverts and drain pipes, water mains, public utility easements, wooded areas, streams, lakes, marshes, and any other physical conditions on the site. (3) A site plan shall be drawn to an appropriate engineer's scale showing: a. The proposed grading plan; b. The width, location, typical section, and names of proposed streets; c. The width, location and names of surrounding streets including any/all rights-of-way and easements; d. The zoning district categories and existing land uses on properties adjacent to the proposed development; e. The use, size, location and height of all proposed buildings and other structures; f. The location of phase lines indicating all applicable construction phases; g. The off-street parking and loading plan; h. A circulation diagram showing vehicular and pedestrian movements including any special engineering features and traffic regulation devices; and i. The location and size of common open spaces and public or quasi-public area. (4) A utility service plan showing: a. Existing drainage and sewer lines; b. The disposition and/or retention of sanitary waste and storm water; c. The source of potable water; and d. The location and width of all utility easements and rights-of-way. (5) A landscaping plan showing: a. Landscaped areas; b. All specimen trees or groups of specimen trees 36 inches in diameter or larger, indicating those to be retained, removed, or relocated; c. The location, height, and material for walks, fences, walkways, and other manmade landscape features; d. Any special landscape features including but not limited to, manmade lakes, land sculpture, and waterfalls. (6) Statistical information including: a. Total acreage of the site; b. Maximum building coverage expressed as a percentage of the total site area; c. The area of land devoted to rights-of-way, transportation easements, parking and other transportation facilities expressed as a percentage of the total site area; d. The area of land devoted to undisturbed open space expressed as a percentage of the total site area; e. The area of land devoted to landscaping and/or open space usable for recreation purposes expressed as a percentage of the total site area; and f. The calculated density/intensity for the project. (7) Development schedule showing order of construction, proposed date for the beginning of construction and completion of the project as a whole and any phases thereof. (8) Covenants, grants, easements, dedications and restrictions to be imposed on the land, buildings, and structures, including proposed easements for public utilities and instruments relating to the use and maintenance of common open spaces and private streets. Such instruments shall give consideration to access requirements of public vehicles for maintenance purposes. (9) For properties proposed for residential usage, the applicant shall submit a completed school impact analysis form. (10) For properties in the design review districts, the site plan shall include: a. Elevations of front and sides with indications of materials and dimensions: b. Elevations of accessory buildings, if proposed, with indications of materials and dimensions; c. Paving materials; and d. Palette of exterior materials and their colors. (11) Additional relevant information which is deemed to be appropriate by the city to ensure consideration of all relevant issues. (c) Special expedited site plan review and appeals process for advanced technology projects. For advanced technology projects that have been qualified by the state office of tourism, trade, and economic development (OTTED), the procedures set forth in this article shall be varied and expedited pursuant to the authority granted in F.S. § 403.973. (1) Site plan review. The time frames in the procedures outlined in section 9-154 for review of Type A site plans, in section 9-155 for review of Type B site plans, and in section 9-156 for review of Type C site plans shall not apply to qualified advanced technology projects. Notwithstanding anything in this article to the contrary, the entity with authority to approve an advanced technology project shall act on an application within 90 days from receipt of an application that has been determined to be complete according to the criteria in this article or within the time limits specified in a memorandum of agreement between the city and the applicant. The time may be extended by agreement between the city and the applicant, or by the city alone if circumstances preclude final action by the entity with authority to approve the project within the 90-day time frame. The 90-day time frame does not include any time necessary to complete any administrative or appellate proceedings that will affect the issuance of the permit. (2) Completeness of an application for an Advanced Technology Project. An application for an advanced technology project shall not be considered complete until the approval by the city commission of a memorandum of agreement pursuant to F.S. § 403.973 and execution of the memorandum of agreement by all parties. A request for a memorandum of agreement may be submitted to the city manager's office for review and scheduling for a workshop and public hearing before the city commission. The memorandum of agreement shall include at a minimum the following: a proposed site plan meeting the requirements of subsection (3) of this section, a natural features inventory, an environmental impact assessment, and a report on the concurrency impacts for traffic and stormwater. The growth management department shall review the documents submitted with the memorandum of agreement, and shall make a recommendation to the city commission on the completeness of the application. (3) Quasi-judicial proceedings for Type A and Type B site plans. For advanced technology projects that have been qualified by the state office of tourism, trade, and economic development (OTTED), final decisions on Type A site plans submitted pursuant to section 9-154 and Type B site plans submitted pursuant to section 9-155 shall be made after public hearings. Notice of a public hearing under this subsection (c)(3) shall be in accordance with section 9-155(7)d. All witnesses shall be sworn, and the parties shall have the right to cross examine witnesses. (4) Appeals of Type A and Type B site plans. The provisions related to formal proceedings in section 9-154(8)f for formal proceedings on a Type A site plan and in section 9-155(7)h for formal proceedings on a Type B site plan shall not apply to advanced technology projects that have been qualified by the state office of tourism, trade, and economic development. Rather, a party with standing shall have the right to seek review in circuit court by a petition for writ of certiorari within 30 days from final action on the application.

(Code 1984, ch. 27, § 21.7; Ord. No. 95-O-0025AA, 9-13-1995; Ord. No. 96-O-0033AA, § 19, 12-11-1996; Ord. No. 02-O-45AA, § 3, 7-10-2002; Ord. No. 04-O-28AA, § 3, 3-31-2004; Ord. No. 04-O-43AA, § 4, 6-23-2004; Ord. No. 04-O-90AA, § 3, 4-13-2005; Ord. No. 08-O-13AA, § 7, 10-22-2008)

Ask a question about Tallahassee law

Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.