For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 43-43 — Permits and building code

Code of Ordinances of the City of West Palm Beach, Florida (Supp. No. 77: codified through Ordinance No. 5172-26, enacted July 6, 2026) · West Palm Beach Code of Ordinances § 43-43

Corpus is an independent public-information project, not the official City of West Palm Beach website. Stable reference: corpuslaw.us/code/25bea1d4-7ed7-46a1-979c-826538eb1f9d

Sec. 43-43. - Permits and building code.

(a) Building permit. A building permit and inspections shall be required for artwork and foundation work when necessitated by the art and as determined by code. (b) Electrical components. An electrical permit and inspections are required for artwork that uses electrical components. Either the entire electrical system or each electrical component used shall be listed by underwriter's laboratory (UL), or similar nationally recognized testing laboratory, and shall only be used in accordance with such listing. Alternatively, the electrical drawings and installation shall demonstrate that the electrical system complies with the version of the National Electrical Code referenced in the current Florida Building Code. The electrical power supply must be installed by a licensed electrical contractor in accordance with the current Florida Building Code. The electrical system configuration shall provide access for maintenance of the electrical system in accordance with the current Florida Building Code. (c) When the artwork media is lighting or text-based art, and is not a sign, the art is not required to meet code requirements for signs, but must be determined by city inspectors to be safe.

(Ord. No. 5172-26, § 2, 7-6-2026)

Ask a question about West Palm Beach law

Corpus searches the West Palm Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.