§ 3.3 — STORMWATER MANAGE- MENT—GENERAL
Code of Ordinances of the City of Alpharetta, Georgia (Codified through Ordinance No. 908, enacted August 2, 2026 (Supp. No. 16, Update 1)) · Alpharetta Unified Development Code § 3.3
Corpus is an independent public-information project, not the official City of Alpharetta website. Stable reference: corpuslaw.us/code/e06fbecc-8ad2-467c-9ded-dcb1c8c1dd55
SECTION 3.3 - STORMWATER MANAGE- MENT—GENERAL
3.3.1 Post-Construction Stormwater Management for New Development and Redevelopment. A. Purpose and Intent. The purpose of this article is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-construction stormwater runoff and nonpoint source pollution associated with new development and redevelopment. Proper management of post- construction stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment and general welfare of the public, and protect water and aquatic resources. Additionally, the city is required to comply with several State and Federal laws, regulations, and permits and the requirements of the Metropolitan North Georgia Water Planning District's regional water plan related to managing the water quantity, velocity, and quality of post- construction stormwater runoff. B. Definitions. For this Article, the terms below shall have the following meanings: Administrator. The person appointed to administer and implement this Section on Post-Construction Stormwater Management for New Development and Redevelopment in accordance with Section 3.3.1. Agricultural use. The establishment, cultivation, or harvesting of products of the field or orchard; the preparation and planting of pasture land farm ponds; and the construction of farm buildings. Applicant. A person submitting a land development application for approval. ASPH. The latest edition of the Alpharetta Stormwater Policy Handbook and all its appendices. BMP or best management practice. Both structural devices to store or treat stormwater runoff and non-structural programs or practices which are designed to prevent or reduce the pollution of the waters of the State of Georgia. BMP landscaping plan. A design for vegetation and landscaping that is critical to the performance and function of the BMP including how the BMP will be stabilized and established with vegetation. It shall include a layout of plants and plant names (local and scientific). Channel. A natural or artificial watercourse with a definite bed and banks that conveys continuously or periodically flowing water. Conservation Easement. An agreement between a land owner and the City of Alpharetta or other government agency or land trust that permanently protects open space or greenspace on the owner's land by limiting the amount and type of development that can take place but continues to leave the remainder of the fee interest in private ownership. Detention. The temporary storage of stormwater runoff in a stormwater detention facility for the purpose of controlling the peak discharge. Detention Facility. A structure designed for the storage and gradual release of stormwater runoff at controlled rates. Developer. A person who undertakes land development activities. Development. New development or redevelopment. Drainage Easement. An easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement. Extended Detention. The storage of stormwater runoff for an extended period of time. Extreme Flood Protection. Measures taken to prevent adverse impacts from large low-frequency storm events with a return frequency of 100 years or more. Flooding. A volume of surface water that exceeds the banks or walls of a BMP or channel and overflows onto adjacent lands. GSMM. The latest edition of the Georgia Stormwater Management Manual, Volume 2: Technical Handbook, and its Appendices. Hotspot. A land use or activity on a site that has the potential to produce higher than normally found levels of pollutants in stormwater runoff. As defined by the administrator, hotspot land use may include gasoline stations, vehicle service and maintenance areas, industrial facilities (both permitted under the Industrial Stormwater General Permit and others), material storage sites, garbage transfer facilities, and commercial parking lots with high-intensity use. Hydrologic Soils Group (HSG). A Natural Resource Conservation Service classification system in which soils are categorized into four runoff potential groups. The groups range from group A soils, with high permeability and little runoff produced, to group D soils, which have low permeability rates and produce more runoff. Impervious Surface. A surface composed of any material that significantly impedes or prevents the natural infiltration of water into the soil. Pervious paving and green roof are not considered impervious only if they have a stormwater design and inspection and maintenance plan. Industrial Stormwater General Permit. The National Pollutant Discharge Elimination System (NPDES) permit issued by Georgia Environmental Protection Division to an industry for stormwater discharges associated with industrial activity. The permit regulates pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies based on Standard Industrial Classification (SIC) Code. Infiltration. The process of percolating stormwater runoff into the subsoil. Inspection and Maintenance Agreement. A written agreement providing for the long-term inspection, operation, and maintenance of the stormwater management system and its components on a site. Jurisdictional Wetlands. Areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Land Development. Any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other installation of impervious cover. Land Development Activities. Those actions or activities which comprise, facilitate or result in land disturbance. Land Development Application. The application for a land development permit on a form provided by the city along with the supporting documentation required in Section 3.3.1J. Land Development Permit. The authorization necessary to begin construction-related, land-disturbing activity. Land Disturbing Activity. Any activity which may result in soil erosion from water or wind and the movement of sediments into state water or onto lands within the state, including but not limited to clearing, dredging, grading, excavating, and filling of land. Land disturbing activity does not include agricultural practices as described O.C.G.A. 12-7-17(5) or silvicultural land management activities as described O.C.G.A. 12-7-17(6) within areas zoned for these activities. Linear Feasibility Program. A feasibility program developed by the city and submitted to the Georgia Environmental Protection Division, which sets reasonable criteria for determining when implementation of stormwater management standards for linear transportation projects being constructed by the city is infeasible. Linear Transportation Projects. Construction projects on traveled ways including but not limited to roads, sidewalks, multi-use paths and trails, and airport runways and taxiways. Maintenance. Any action necessary to preserve stormwater management facilities or structures and pipes or ditches in proper working condition, in order to serve the intended purpose, set forth in this Ordinance and to prevent structural failure of such facilities. MS4 Permit. The NPDES permit issued by Georgia Environmental Protection Division for discharges from the city's municipal separate storm sewer system. New Development. Land disturbing activities, structural development (construction, installation, or expansion of a building or other structure), and/or creation of impervious surfaces on a previously undeveloped site. Nonpoint Source Pollution. A form of water pollution that does not originate from a discrete point such as a wastewater treatment facility or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water or groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources. Non-Structural Stormwater Management Practice. Any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels. Off-Site Facility. A stormwater management facility located outside the boundaries of the site. On-Site Facility. A stormwater management facility located within the boundaries of the site. Overbank Flood Protection. Measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain). Owner. The legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm, or corporation in control of the site. Person. Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the State, any interstate body or any other legal entity. Post-construction Stormwater Management. Stormwater best management practices that are used on a permanent basis to control and treat runoff once construction has been completed in accordance with a stormwater management plan. Post-development. The conditions anticipated to exist on site immediately after completion of the proposed development. Practicability Policy. The policy outlined in the Alpharetta Stormwater Policy Handbook. Pre-development. The conditions that exist on a site immediately before the implementation of the proposed development. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time before the first item being approved or permitted shall establish pre-development conditions. Pre-development Hydrology. Is (a) for new development, the runoff curve number determined using natural conditions hydrologic analysis based on the natural, undisturbed condition of the site immediately before implementation of the proposed development; and (b) for redevelopment, the existing conditions hydrograph may take into account the existing development when defining the runoff curve number and calculating existing runoff, unless the existing development causes a negative impact on downstream property as defined by the city. Previously Developed Site. A site that has been altered by paving, construction, and/or land disturbing activity. Private. Property or facilities owned by individuals, corporations, and other organizations and not by the city, state, or federal government. Project. A land development project. Redevelopment. Structural development (construction, installation, or expansion of a building or other structure), creation or. addition of impervious surfaces, replacement of impervious surfaces not as part of routine maintenance, and land disturbing activities associated with structural or impervious development on a previously developed site. Redevelopment does not include such activities as exterior remodeling where footprint is unaltered. Regional Stormwater Management Facility. Stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for on-site controls is either eliminated or reduced. Routine Maintenance. Activities to keep an impervious surface as near as possible to its constructed condition. This includes ordinary maintenance activities, resurfacing paved areas, and exterior building changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution. Runoff. Stormwater runoff. Runoff Reduction Measures. Preservation of an area's landscape features (vegetation, soils, and natural processes) that help manage and reduce stormwater runoff from a development or redevelopment site. Runoff reduction measures also include structurally engineered practices (such as bioretention areas, bioswales, pervious paving, greenroofs, greenwalls, stormwater street trees, and cisterns) that mimic natural processes to manage stormwater as close to its source as possible and reduce stormwater runoff from the site. In addition to stormwater management, runoff reduction measures can enhance site aesthetics, improve water quality, reduce urban heat island impacts, provide shading, create wildlife habitat, reduce energy consumption, reduce infrastructure costs, and increase property values. Above ground cisterns require architectural and/or landscape screening that compliments the architecture of the building and is of like or similar materials used in the building's construction. Location of cisterns and other vertical runoff reduction measures and their screening shall require approval by the Community Development Department. Site. An area of land where development is planned, which may include all or portions of one or more parcels of land. For subdivisions and other common plans of development, the site includes all areas of land covered under an applicable land development permit. Stormwater Better Site Design. Nonstructural site design approaches and techniques that can reduce a site's impact on the watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious cover and using natural features for stormwater management. Stormwater Concept Plan. An initial plan for post-construction stormwater management at the site that provides the groundwork for the stormwater management plan including the natural resources inventory, site layout concept, initial runoff characterization, and first round stormwater management system design. Stormwater Management Plan. A plan for post-construction stormwater management at the site that meets the requirements of Section 3.3.1H and is included as part of the land development application. Stormwater Management Standards. Those standards set forth in Section 3.3.1G. Stormwater Management System. The entire set of non-structural site design features and structural BMPs for collection, conveyance, storage, infiltration, treatment, and disposal of stormwater runoff in a manner designed to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare. Stormwater Retrofit. A stormwater management practice designed for a currently developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the current stormwater management requirements of the site. Stormwater Runoff. Flow on the surface of the ground, resulting from precipitation. Subdivision. The division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway. Other terms used but not defined in this Article shall be interpreted based on how such terms are defined and used in the GSMM, the ASPH, and the city's MS4 permit. C. Adoption and Implementation of the GSMM; Conflicts and Inconsistencies. (a) In implementing this Article, Alpharetta shall use and require compliance with all relevant design standards, calculations, formulas, methods, and standards from the latest edition of the GSMM (including all related appendices) and the Alpharetta Stormwater Policy Handbook (ASPH). The ASPH provides specific design requirements of the city and clarifies guidance language provided in the GSMM. This policy handbook may be updated and expanded periodically, based on improvements in science, engineering, monitoring, and local maintenance experience. However, failure to update the policy handbook shall not relieve any applicant from the obligation to comply with the requirements of this ordinance and shall not prevent the city from imposing the most current and effective practices. The policy handbook may establish design standards for new development and redevelopment that includes the creation of less than 5,000 square feet of impervious cover or involves land development activity of less than one (1) acre. (b) This Article or Section is not intended to modify or repeal any other Article, Section, ordinance, rule, regulation or other provision of law, including but not limited to any applicable stream buffers under state and local laws, and the Georgia Safe Dams Act and Rules for Dam Safety. In the event of any conflict or inconsistency between any provision in the city's MS4 permit and this Article, the provision from the MS4 permit shall control. In the event of any conflict or inconsistency between any provision of this Article and the GSMM, the provision from this Article shall control. In the event of any other conflict or inconsistency between any provision of this Article or Section and any other ordinance, rule, regulation or other provision of law, the provision that is more restrictive or imposes higher protective standards for human health or the environment shall control. (c) If any provision of this Article or Section is invalidated by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of this Article or Section. D. Designation of Administrator. The Mayor may from time to time appoint someone to administer and implement this Section. Directors of Community Development and Public Works and their designees are appointed to administer and implement the provisions of this ordinance. E. Applicability Criteria for Stormwater Management Standards. This Section applies to the following activities: (a) New development that creates or adds 1,000 square feet or greater of new impervious surface area or that involves land disturbing activity of 1 acre of land or more; (b) Redevelopment (excluding routine maintenance and exterior remodeling) that creates or adds 1,000 square feet or greater; or redevelopment (excluding routine maintenance and exterior remodeling) that replaces 5,000 square feet or greater of new impervious surface area; or redevelopment that involves land disturbing activity of 1 acre or more; (c) New development and redevelopment if: (i) such new development or redevelopment is part of a subdivision or other common plan of development, and (ii) the sum of all associated impervious surface area or land disturbing activities that are being developed as part of such subdivision or other common plan of development meets or exceeds the threshold in (a) and (b) above; (d) Any commercial or industrial new development or redevelopment, regardless of size, that is a hotspot land use as defined in this Article; and (e) Linear transportation projects that exceed the threshold in (a) or (b) above. F. Exemptions from Stormwater Management Standards of Section 3.3.1. This Section does not apply to the following activities: (a) Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs; (b) Land disturbing activity that consists solely of cutting a trench for utility work and related pavement replacement (this exemption does not negate the requirement to obtain utility encroachments permits from the city nor does it negate the requirement to get utility locates); (c) Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or environmental restoration; (d) Repairs to any stormwater management system deemed necessary by the administrator; (e) Agricultural practices as described O.C.G.A. 12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in 3.3.1E a and b; (f) Silvicultural land management activities as described O.C.G.A. 12-7-17(6) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in 3.3.1E a and b; (g) Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including but not limited to elevator shafts, handicapped access ramps and parking, and enlarged entrances or exits; and (h) Linear transportation projects being constructed by the city to the extent the administrator determines that the stormwater management standards may be infeasible to apply, all or in part, for any portion of the linear transportation project. For this exemption to apply, an infeasibility report that is compliant with the city linear feasibility program shall first be submitted to the administrator that contains adequate documentation to support the evaluation for the applicable portion(s) and any resulting infeasibility determination, if any, by the administrator. G. Stormwater Management Standards. Subject to the applicability criteria in 3.3.1 E and exemptions in 3.3.1 F, the following stormwater management standards apply. Additional details for each standard can be found in the GSMM Section 2.2.2.2: (a) Design of Stormwater Management System: The design of the stormwater management system shall be in accordance with the applicable sections of the GSMM and ASPH as directed by the administrator. Any design which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable. (b) Natural Resources Inventory: Site reconnaissance and surveying techniques shall be used to complete a thorough assessment of existing natural resources, both terrestrial and aquatic, found on the site. Resources to be identified, mapped, and shown on the Stormwater Management Plan, shall include, at a minimum (as applicable): (i) Topography (minimum of 2-foot contours) and Steep Slopes (i.e., Areas with Slopes Greater Than 15%), (ii) Natural Drainage Divides and Patterns, (iii) Natural Drainage Features (e.g., swales, basins, depressional areas), (iv) Natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers, drinking water wellhead protection areas and river corridors, (v) Predominant soils (including erodible soils and karst areas), and (vi) Existing predominant vegetation including trees, high quality habitat and other existing vegetation. (c) Better Site Design Practices for Stormwater Management: Stormwater management plans shall preserve the natural drainage and natural treatment systems and reduce the generation of additional stormwater runoff and pollutants to the maximum extent practicable. Additional details can be found in the GSMM Section 2.3. (d) Stormwater Runoff Quality/Reduction: Stormwater Runoff Quality/Reduction shall be provided by using the following: (i) For development with a stormwater management plan submitted before February 2, 2017, the applicant may choose either (A) Runoff Reduction or (B) Water Quality. (ii) For development with a stormwater management plan submitted on or after February 2, 2017, the applicant shall choose (A) Runoff Reduction and additional water quality shall not be required. To the extent (A) Runoff Reduction has been determined to be infeasible for all or a portion of the site using the Practicability Policy, then (B) Water Quality shall apply for the remaining runoff from a 1.2-inch rainfall event and must be treated to remove at least 80% of the calculated average annual post-development total suspended solids (TSS) load or equivalent as defined in the GSMM. (A) Runoff Reduction - The stormwater management system shall be designed to retain the first 1.0-inch of rainfall on the site using runoff reduction methods, to the maximum extent practicable. (B) Water Quality - The stormwater management system shall be designed to remove at least 80% of the calculated average annual post-development total suspended solids (TSS) load or equivalent as defined in the GSMM for runoff from a 1.2-inch rainfall event. (iii) If a site is determined to be a hotspot as detailed in 3.3.1 E, the city may require the use of specific or additional components for the stormwater management system to address pollutants of concern generated by that site. (e) Stream Channel Protection: Stream channel protection shall be provided by using all of the following three approaches: (i) 24-hour extended detention storage of the 1-year, 24-hour return frequency storm event; (ii) Erosion prevention measures, such as energy dissipation and velocity control; and (iii) Preservation of any applicable stream buffer. (iv) Channel Protection may be adjusted or waived by the city for sites that discharge directly into larger streams, rivers, wetlands, or lakes, or to a man-made channel or conveyance system where the reduction in these flows will not have impact on upstream or downstream streambank or channel integrity. (f) Overbank Flood Protection: Downstream overbank flood protection shall be provided by controlling the post-development peak discharge rate to the pre-development rate for the 2, 10, and 25-year, 24-hour storm events. Overbank Flood Protection may be adjusted or waived by the city for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions. (g) Extreme Flood Protection: Extreme flood protection shall be provided by controlling and safely conveying the 100-year, 24-hour storm event such that flooding is not exacerbated. Extreme Flooding Protection may be adjusted or waived by the city for sites where the post development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions. (h) Downstream Analysis: Due to peak flow timing and runoff volume effects, some structural components of the stormwater management system fail to reduce discharge peaks to pre-development levels downstream from the site. A downstream peak flow analysis shall be provided to the point in the watershed downstream of the site or the stormwater management system where the area of the site comprises 10% of the total drainage area in accordance with Section 3.1.9 of the GSMM. This is to help ensure that there are minimal downstream impacts from development on the site. The downstream analysis may result in the need to resize structural components of the stormwater management system. Analysis should include evaluation of 2, 25, and 100-year, 24-hour storm events at each possible "choke point" between the site and the 10% point. This should include, but is not limited to culverts, pipes, and stream confluences. Post-development flow rates should not increase from pre-development rates except in those situations where the city has approved waivers of Overbank or Extreme Flood Protection in order to protect downstream peak flows. (i) Stormwater Management System Inspection and Maintenance: The components of the stormwater management system that will not be dedicated to and accepted by the city, including all drainage facilities, best management practices, credited conservation spaces, and conveyance systems, shall have an inspection and maintenance agreement to ensure that they continue to function as designed. All new development and redevelopment sites are to prepare a comprehensive inspection and maintenance agreement for the on-site stormwater management system. This plan shall be written in accordance with the requirements in Section 3.3.1 P, S, and T. (j) Structural Stormwater Controls: All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the GSMM and the additional requirements of the Alpharetta Stormwater Policy Handbook. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the GSMM, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from the city before being included in the design of a stormwater management system. In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, the city may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question. Applicants shall consult the GSMM for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control. (k) Stormwater Credits for Nonstructural Measures: The use of one or more site design measures by the applicant may allow for a reduction in the runoff reduction volume or water quality treatment volume required under Section 3.3.1G d. The applicant may, if approved by the city, take credit for the use of stormwater better site design practices and reduce the water quality volume requirement. For each potential credit, there is a minimum set of criteria and requirements which identify the conditions or circumstances under which the credit may be applied. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the GSMM. To receive credit a conservation easement may be required by the city. (l) Drainage System Guidelines: Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutters, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-of-way and private properties adjoining project sites and/or public rights-of-way. Stormwater conveyance facilities that are designed to carry runoff from more than one parcel, existing or proposed, shall meet the following requirements: 1. Methods to calculate stormwater flows shall be in accordance with the GSMM and the ASPH. 2. All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the GSMM and the ASPH. 3. Design and construction of stormwater conveyance systems shall be in accordance with the criteria and specifications found in the GSMM, the ASPH, and Alpharetta's standard details. (m) Dam Design Guidelines: Any land-disturbing activity that involves a site which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable and requirements outlined in the ASPH. H. Pre-Submittal Meeting, Stormwater Concept Plan, and Stormwater Management Plan Requirements. (a) Before a land development permit application is submitted, an applicant shall request a pre-submittal meeting with the city. The pre-submittal meeting is required prior to submittal for a Land Disturbance Permit. The purpose of the pre-submittal meeting is to discuss opportunities, constraints, and ideas for the stormwater management system before formal site design engineering. To the extent applicable, local and regional watershed plans, greenspace plans, trails and greenway plans, and other resource protection plans should be consulted in the pre-submittal meeting. Applicants must request a pre-submittal meeting with the city when applying for a Determination of Infeasibility through the Practicability Policy. (b) The stormwater concept plan shall be prepared using the minimum following steps: (i) Develop the site layout using better site design techniques, as applicable (GSMM Section 2.3). (ii) Calculate preliminary estimates of the unified stormwater sizing criteria requirements for stormwater runoff quality/reduction, channel protection, overbank flooding protection and extreme flood protection (GSMM Section 2.2). (iii) Perform screening and preliminary selection of appropriate best management practices and identification of potential siting locations (GSMM Section 4.1). (c) The stormwater concept plan shall contain: (i) Common address and legal description of the site, (ii) Vicinity map, and (iii) Existing conditions and proposed site layout mapping and plans (recommended scale of 1" = 50'), which illustrate at a minimum: (A) Existing and proposed topography (minimum of 2-foot contours), (B) Perennial and intermittent streams, (C) Mapping of predominant soils from USDA soil surveys, (D) Boundaries of existing predominant vegetation and proposed limits of clearing and grading, (E) Location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers, specimen trees, and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.), (F) Location of existing and proposed roads, buildings, parking areas and other impervious surfaces, (G) Existing and proposed utilities (e.g., water, sewer, gas, electric) and easements, (H) Preliminary estimates of unified stormwater sizing criteria requirements, (I) Preliminary selection and location, size, and limits of disturbance of proposed BMPs, (J) Location of existing and proposed conveyance systems such as grass channels, swales, and storm drains, (K) Flow paths, (L) Location of the boundaries of the base flood floodplain, future-conditions floodplain, and the floodway (as applicable) and relationship of site to upstream and downstream properties and drainage, and (M) Preliminary location and dimensions of proposed channel modifications, such as bridge or culvert crossings. (N) Documentation if requesting determination of infeasibility for runoff reduction. (d) The stormwater management plan shall contain the items listed in this part and be prepared under the direct supervisory control of either a registered Professional Engineer or a registered Landscape Architect licensed in the state of Georgia. Items (iii), (iv), (v), and (vi) shall be sealed and signed by a registered Professional Engineer licensed in the state of Georgia. The overall site plan must be stamped by a design professional licensed in the State of Georgia for such purpose. (GSMM Section 2.4.2.7) The stormwater management plan must ensure that the requirements and criteria in this ordinance are being complied with and that opportunities are being taken to minimize adverse post-development stormwater runoff impacts from the development. The plan shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include the information required in the Stormwater Management Site Plan checklist found in the ASPH. The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility. A stormwater management plan must be submitted to the city which shows the adequacy of the off-site or regional facility. To be eligible for modification, the applicant must demonstrate to the satisfaction of the city that the use of the off-site or regional facility will not result in the following impacts to upstream or downstream areas: a. increased threat of flood damage to public health, life, and property; b. deterioration of existing culverts, bridges, dams, and other structures; c. accelerated streambank or streambed erosion or siltation; d. degradation of in-stream biological functions or habitat; or e. water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations. (i) Natural Resources Inventory (ii) Stormwater Concept Plan (iii) Existing Conditions Hydrologic Analysis (iv) Post-Development Hydrologic Analysis (v) Stormwater Management System (vi) Downstream Analysis (vii) Erosion and Sedimentation Control Plan (viii) BMP Landscaping Plan (ix) Inspection and Maintenance Agreement (x) Evidence of Acquisition of Applicable Local and Non-Local Permits (xi) Determination of Infeasibility (if applicable) (xii) Operations and Maintenance Plan (xiii) Maintenance Access Easements (e) For redevelopment and to the extent existing stormwater management structures are being used to meet stormwater management standards the following must also be included in the stormwater management plan for existing stormwater management structures, (i) As-built Drawings (ii) Hydrology Reports (iii) Current inspection of existing stormwater management structures with deficiencies noted (iv) BMP Landscaping Plans (f) Deed Recordation and Indications on Plat. The approval of the permit shall require an enforceable restriction on property usage that runs with the land, such as plat, easements, recorded deed restrictions or protective covenants, to ensure that future development and redevelopment maintains the site consistent with the approved project plans. The location of all designated natural area or Conservation Easements for a site shall be recorded at the County Register of Deeds Office as "undisturbed natural area". Designated protected stream buffer boundaries must be specified on all surveys and recorded plats. The applicable maintenance agreement pertaining to every structural BMP shall be referenced on the final plat and shall be recorded with the County Register of Deeds Office upon final plat approval and shall be provided to the city within 14 days following receipt of the recorded document. (g) Fee-In-Lieu. The purpose of the fee-in-lieu program is to allow parcels being redeveloped to reduce on-site stormwater management requirements by paying a fee to the City. For re-development projects, the owner or designee of the proposed development site shall have the option of paying an in-lieu fee to the City which will be used by the City to construct stormwater improvement measures off-site. All the required detention (including channel protection) must be met onsite. A minimum of 75% of the runoff reduction/water quality treatment must be provided on-site. The remainder of the runoff reduction/water quality treatment may be met by a fee-in-lieu payment. The owner must demonstrate no increased downstream negative impacts where there are incised streambank conditions. Fee-in-Lieu funds will be applied to the construction of stormwater improvement projects in the same HUC-12 watershed. Program qualifications and details are provided in the ASPH. I. Application Fee. The fee for review of any land development application shall be based on the fee structure established by the city, and payment shall be made before the issuance of any land disturbance permit or building permit for the development. J. Application Procedures. Land development applications are handled as part of the process to obtain the land disturbance permit pursuant to the Alpharetta Unified Development Code, as applicable. Before any person begins development on a site, the owner of the site shall first obtain approval in accordance with the following procedure: (a) File a land development application with the city on the city's form of application along the following supporting materials: (i) the stormwater management plan and report prepared in accordance with 3.3.1 H, (ii) a certification that the development will be performed in accordance with the stormwater management plan once approved, (iii) annotated checklists, (iv) proof of pre-submittal meeting including a copy of the stormwater concept plan, (v) documentation of preliminary determination of infeasibility of runoff reduction, as applicable, prepared in accordance with the practicability policy, and (vi) an acknowledgement that applicant has reviewed the city's form of inspection and maintenance agreement and that applicant agrees to sign and record such inspection and maintenance agreement before the final CO inspection. A copy of the proposed inspection and maintenance agreement must be included in the stormwater management plan or report. (b) The administrator shall inform the applicant whether the application and supporting materials are approved or disapproved. (c) If the application or supporting materials are disapproved, the administrator shall notify the applicant of such fact in writing. The applicant may then revise any item not meeting the requirements hereof and resubmit the same for the administrator to again consider and either approve or disapprove. (d) If the application and supporting materials are approved, the city may issue the associated land disturbance permit or building permit, provided all other legal requirements for the issuance of such permits have been met. The stormwater management plan included in such applications becomes the approved stormwater management plan. (e) Performance and Maintenance Bonds. The city may require performance and/or maintenance bonds for stormwater management facilities or practices and define the bond amounts. Bonds may be collected prior to issuance of a land disturbance permit, prior to approval of a final plat, prior to approval of CO, and/or prior to final closeout of the construction site. K. Compliance with the Approved Stormwater Management Plan. All development shall be: (a) Consistent with the approved stormwater management plan and all applicable land disturbance and building permits, and (b) Conducted only within the area specified in the approved stormwater management plan. (c) The city should be allowed to conduct periodic inspections of the project. (d) Upon completion of the project, the applicant or other responsible person shall submit the engineer's report and certificate and as-built plans required by Section 3.3.1 M. No changes may be made to an approved stormwater management plan without review and advanced written approval by the administrator. L. Inspections to Ensure Plan Compliance During Construction. Periodic inspections of the stormwater management system during construction shall be conducted by the staff of the city or conducted and certified by a professional engineer who has been approved by the city. Inspections shall use the approved stormwater management plan for establishing compliance. All inspections shall be documented with written or electronic reports that contain the following information: (a) The date and location of the inspection; (b) Whether the stormwater management system is in compliance with the approved stormwater management plan; (c) Variations from the approved stormwater management plan; and (d) Any other variations or violations of the conditions of the approved stormwater management plan. M. Final Inspection; As-Built Drawings; Delivery of Inspection and Maintenance Agreement. Upon completion of the development, the applicant is responsible for: (a) Certifying that the stormwater management system is functioning properly and was constructed in conformance with the approved stormwater management plan and associated hydrologic analysis, (b) Submitting as-built drawings showing the final design specifications for all components of the stormwater management system as certified by a professional engineer, (c) Certifying that the landscaping is established and installed in conformance with the BMP landscaping plan, and (d) Delivering to the city a signed inspection and maintenance agreement that has been recorded by the owner in the property record for all parcel(s) that make up the site. The required certification under part (a) shall include a certification of volume, or other performance test applicable to the type of stormwater management system component, to ensure each component is functioning as designed and built according to the design specifications in the approved stormwater management plan. This certification and the required performance tests shall be performed by a qualified person and submitted to the city with the request for a final inspection. The city shall perform a final inspection with applicant to confirm applicant has fulfilled these responsibilities. A bond inspection by the City is required before the release of any performance securities or bonds can occur. N. Violations and Enforcement. Any violation of the approved stormwater management plan during construction, failure to submit as-built drawings, failure to submit a final BMP landscaping plan, failure to follow the approved plans, failure to submit plans or changes for approval, or failure of the final inspection shall constitute and be addressed as violations of, or failures to comply with, the underlying land disturbance permit pursuant to Section 3.3.9 of this ordinance. To address a violation of this Article or Section, the city shall have all the powers and remedies that are available to it for other violations of building and land disturbance permits, including without limitation the right to issue notices and orders to ensure compliance, stop work orders, and penalties as set forth in the applicable ordinances for such permits. O. Maintenance by Owner of Stormwater Management Systems Predating Current GSMM. For any stormwater management systems approved and built based on requirements predating the current GSMM and that is not otherwise subject to an inspection and maintenance agreement, such stormwater management systems shall be maintained by the owner so that the stormwater management systems perform as they were originally designed. P. Inspection and Maintenance Agreements. (a) The owner shall execute an inspection and maintenance agreement with the city obligating the owner to inspect, clean, maintain, and repair the stormwater management system; including vegetation in the final BMP landscaping plan. The form of the inspection and maintenance agreement shall be the form provided by the city or a city approved alternate. After the inspection and maintenance agreement has been signed by the owner and the city, the owner shall promptly record such agreement at the owner's cost in the property record for all parcel(s) that make up the site. (b) The inspection and maintenance agreement shall identify by name or official title the person(s) serving as the point of contact for carrying out the owner's obligations under the inspection and maintenance agreement. The owner shall update the point of contact from time to time as needed and upon request by the city. Upon any sale or transfer of the site, the new owner shall notify the city in writing within 30 days of the name or official title of new person(s) serving as the point of contact for the new owner. Any failure of an owner to keep the point of contact up to date shall, following 30 days' notice, constitute a failure to maintain the stormwater management system. (c) The inspection and maintenance agreement shall run with the land and bind all future successors-in-title of the site. If there is a future sale or transfer of only a portion of the site, then: (i) The parties to such sale or transfer may enter into and record an assignment agreement designating the owner responsible for each portion of the site and associated obligations under the inspection and maintenance agreement. The parties shall record and provide written notice and a copy of such assignment agreement to the city. (ii) In the absence of a recorded assignment agreement, all owners of the site shall be jointly and severally liable for all obligations under the inspection and maintenance agreement regardless of what portion of the site they own. (d) The City may refuse to accept dedication of any existing or future stormwater management facility if the Director of Public Works or his/her designee determines that accepting the facility is not in the best interest of the City due to maintenance cost or other factors. Q. Right of Entry for Maintenance Inspections. The terms of the inspection and maintenance agreement shall provide for the city's and representatives of the city's right of entry for maintenance inspections and other specified purposes. If a site was developed before the requirement to have an inspection and maintenance agreement or an inspection and maintenance agreement was for any reason not entered into, recorded, or has otherwise been invalidated or deemed insufficient, then the city shall have the right to enter and make inspections pursuant to the city general provisions for property maintenance inspections pursuant to the Alpharetta Unified Development Code, the Alpharetta Property Maintenance Code, and the ASPH. This includes the right to enter a property when it has a reasonable basis to believe that a violation of this ordinance is occurring or has occurred and to enter when necessary for abatement of a public nuisance or correction of a violation of this ordinance. R. Owner's Failure to Maintain the Stormwater Management System. The terms of the inspection and maintenance agreement shall provide for what constitutes a failure to maintain a stormwater management system and the enforcement options available to the city. If a site was developed before the requirement to have an inspection and maintenance agreement or an inspection and maintenance agreement was for any reason not entered into, recorded, or has otherwise been invalidated or deemed insufficient, then: (a) An owner's failure to maintain the stormwater management system so that it performs as it was originally designed shall constitute and be addressed as a violation of, or failure to comply with, owner's property maintenance obligations pursuant to the Alpharetta Unified Development Code, the Alpharetta Property Maintenance Code, and the ASPH; and (b) To address such a failure to maintain the stormwater management system, the city shall have all the powers and remedies that are available to it for other violations of an owner's property maintenance obligations, including without limitation prosecution, penalties, abatement, and emergency measures. S. Maintenance Responsibilities. For all existing and new developments, the following responsibilities should apply unless the existing maintenance agreement specifically defines responsibilities. (a) Any stormwater management facility which services individual subdivisions shall be privately owned with routine maintenance provided for by the owner(s). In subdivisions with an established homeowners' association, the homeowners' association shall be assumed to be responsible for routine maintenance unless the HOA has established covenants, deeds, or restrictions placing responsibility back on specific property owners. The owner shall maintain a perpetual, non-exclusive easement which allows for access for inspection and other maintenance. Determination of whether the HOA or private property owners are responsible will be done by the legal system between the private entities, not the city. (b) Any stormwater management facility which services an individual subdivision in which the facility is within designated open areas or an amenity with an established homeowners' association shall be privately owned and maintained by the property owner. The owner shall maintain a perpetual, non-exclusive easement which allows for access for inspection and emergency maintenance. (c) Any stormwater management facility which services commercial and industrial development shall be privately owned and maintained. The City shall reserve the right, but not the duty to enter the premises for emergency repairs. (d) All other stormwater management facilities, including regional stormwater detention, shall be publicly owned and/or maintained only if accepted for maintenance by the City. (e) Drainage easements where a subdivision is traversed by a water course, drainage way, natural stream or channel off the street right-of-way shall be clearly defined on the plat and deed of the individual property for the purpose of maintaining the free flow of water. The owner shall be required to keep the easement free of obstructions and will maintain same in such a way as to assure free and maximum flow at all times. Should a drainage easement only serve one property (no off-site drainage flows through the easement, whether in a conveyance or overland), the property owner may be allowed by the city to install structures such as fences, decks, patios, and wall footings within the easement or may be allowed to alter the layout of the easement at the city's discretion. (f) Records of Maintenance Activities. Parties responsible for the operation and maintenance of a stormwater management facility shall provide records of all maintenance and repairs to city upon request. (g) A stormwater management facility or practice shall be inspected on a periodic basis by the responsible person in accordance with the approved inspection and maintenance agreement. In the event that the stormwater management facility has not been maintained and/or becomes a danger to public safety or public health and the city becomes aware of such condition, the city shall notify the person responsible for carrying out the maintenance plan by registered or certified mail to the person specified in the inspection and maintenance agreement. The notice shall specify the measures needed to comply with the agreement and the plan and shall specify the time within which such measures shall be completed. If the responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, the city may correct the violation as provided in 3.3.1 R. (h) Inspection programs by the city may be established on any reasonable basis, including but not limited to routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include but are not limited to reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in stormwater management facilities; and evaluating the condition of stormwater management facilities and practices. T. Special Operations and Maintenance Agreement for Homeowners' Associations or Other Associations. For all stormwater management practices required pursuant to this ordinance that are to be are owned and maintained by a homeowners' association, property association, or similar entity, the required operations and maintenance agreement shall include all of the following provisions: (a) Acknowledgement that operations and maintenance agreements run with the land and impose pro rata liability upon individual lot owners. The developer and association agree that the operations and maintenance agreement run with the land and shall be binding upon themselves, their respective successors and assigns, including individual lot owners within the Subdivision. Any liability imposed against an individual landowner shall be pro-rated in a per lot basis as determined by the fraction of lot(s) owned by the individual lot owner. (b) The Developer, Association, their respective successors and assigns, including individual lot owners within the subdivision agree to regularly and routinely inspect, clean, and maintain the Low Impact Development (LID) BMP, and otherwise keep in good repair, at their own cost and expense. (c) The Developer, Association, their respective successors and assigns, including individual lot owners within the subdivision agree that they will reimburse the city for its cost and expenses incurred in the process of cleaning, maintaining, and/or repairing the BMPs pursuant to this agreement in the event the BMPs are failing and the city chooses to intervene. (d) The Covenant of the Subdivision establishing the Association establishes that the Association is obligated to inspect, clean, maintain, and repair the BMPs; the Association has adopted the Operation and Maintenance Agreement as an obligation of the Association; and that a funding mechanism, such as an escrow account, is in place whereby individual lot owners within the subdivision pay a regular fee to the Association for the inspection, cleaning, maintenance, and repair of the stormwater management practice(s). (e) Upon the initial sale of any lot within the Subdivision and prior to closing on such sale, the Developer shall give a copy of the Operation and Maintenance agreement to the potential buyer. (f) The developer shall consider setting aside funds in a separate account for future HOA stormwater management system maintenance. The amount should be based on offsetting anticipated future maintenance costs. 3.3.2 Stream buffer protection. A. Findings and Purposes. 1. Findings. Whereas, the Public Works Department of City of Alpharetta finds that buffers adjacent to streams provide numerous benefits including: a. Protecting, restoring and maintaining the chemical, physical and biological integrity of streams and their water resources. b. Removing pollutants delivered in urban stormwater. c. Reducing erosion and controlling sedimentation. d. Protecting and stabilizing stream banks. e. Providing for infiltration of stormwater runoff. f. Maintaining base flow of streams. g. Contributing organic matter that is a source of food and energy for the aquatic ecosystem. h. Providing tree canopy to shade streams and promote desirable aquatic habitat. i. Providing riparian wildlife habitat. j. Furnishing scenic value and recreational opportunity. k. Providing opportunities for the protection and restoration of greenspace. 2. Purposes. The purpose of this Ordinance is to protect the public health, safety, environment and general welfare; to minimize public and private losses due to erosion, siltation and water pollution; and to maintain stream water quality by provisions designed to: a. Create buffer zones along the streams of the City for the protection of water resources; and, b. Minimize land development within such buffers by establishing buffer zone requirements and by requiring authorization for any such activities. B. Definitions. Buffer means, with respect to a stream, a natural or enhanced vegetated area (established by Section 3.3.2D), lying adjacent to the stream. The area of land adjacent to the banks of State Waters in its natural state of vegetation, which facilities, when properly vegetated, the protection of water quality and aquatic habitat (O.C.G.A. 12-7-6(b)(15)). Floodplain means any land area susceptible to flooding, which would have at least a one percent probability of flooding occurrence in any calendar year based on the basin being fully developed as shown on the current land use plan; i.e. the regulatory flood. Impervious Cover means any manmade paved, hardened or structural surface regardless of material. Impervious cover includes but is not limited to rooftops, buildings, streets, roads, decks, swimming pools, and any concrete, asphalt, or compacted gravel. Land Development means any land change, including but not limited to clearing, grubbing, stripping, removal or vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving and any other installation of impervious cover. Land Development Activity means those actions or activities which comprise, facilitate or result in land development. Land Disturbance means any land or vegetation change, including, but not limited to, clearing, grubbing, stripping, removal or vegetation, dredging, grading, excavating, transporting and filling of land, that do not involve construction, paving or other installation of impervious cover. Land Disturbance Activity means those actions or activities which comprise, facilitate or result in land disturbance. Parcel means any plot, lot or acreage shown as a unit on the latest county tax assessment records. Permit means the permit issued by the city required for undertaking any land development activity. Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the State, any interstate body or any other legal entity. Protection Area or Stream Protection Area means, with respect to a stream, the combined areas of all required buffers and setbacks applicable to such stream. Riparian means belonging or related to the bank of a river, stream, lake, pond, or impoundment. Setback means, with respect to a stream, the area established by Section 3.3.2D extending beyond any buffer applicable to the stream. Stream means any stream, beginning at: 1. The location of a spring, seep, or groundwater outflow that sustains streamflow; or 2. A point in the stream channel with a drainage area of 25 acres or more; or 3. Where evidence indicates the presence of a stream in a drainage area of other than 25 acres, the city may require field studies to verify the existence of a stream. Stream Bank means the confining cut of a stream channel and is usually identified as the point where the normal stream flow has wrested the vegetation. Stream Channel means the portion of a watercourse that contains the base blow of the stream. Watershed means the area that drains into a particular stream. C. Applicability. This ordinance shall apply to all land development activity on property containing a stream protection area. These requirements are in addition to, and do not replace or supersede, any other applicable buffer requirements established under state law and approval or exemption from these requirements do not constitute approval or exemption from buffer requirements established under state law or from other applicable local, state or federal regulations. 1. Grandfather Provisions. This ordinance shall not apply to the following activities: a. Work consisting of the repair or maintenance of any lawful use of land that is zoned and approved for such use on or before the effective date of this ordinance. b. Existing development and on-going land disturbance activities including but not limited to existing agriculture, silviculture, landscaping, gardening and lawn maintenance, except that new development or land disturbance activities on such properties will be subject to all applicable buffer requirements. c. Any land development activity that is under construction, fully approved for development, scheduled for permit approval or has been submitted for approval as of the effective date of this ordinance. d. Land development activity that has not been submitted for approval, but that is part of a larger master development plan, such as for an office park or other phased development that has been previously approved within two years of the effective date of this ordinance. e. Grandfathering provisions only apply to Section 3.3.2 Stream Buffer Protection. 2. Exemptions. The following specific activities are exempt from this ordinance. After the effective date of this ordinance, it shall apply to new subdividing and platting activities. Any land development activity within a buffer established hereunder or any impervious cover within a setback established hereunder is prohibited unless a variance is granted pursuant to Section C below. Exemption of these activities does not constitute an exemption for any other activity proposed on a property. a. Activities for the purpose of building one of the following: (1) A stream crossing by a driveway, transportation route or utility line; (2) Public water supply intake or public wastewater outfall structures; (3) Intrusions necessary to provide access to a property; (4) Public access facilities that must be on the water including boat ramps, docks, foot trails leading directly to the river, fishing platforms and overlooks; (5) Unpaved foot trails and paths; (6) Activities to restore and enhance stream bank stability, vegetation, water quality and/or aquatic habitat, so long as native vegetation and bioengineering techniques are used; (7) The City of Alpharetta Greenway system (exemption applies to city buffers only). b. Public sewer line easements paralleling the creek, except that all easements (permanent and construction) and land disturbance should be at least 25 feet from the top of the bank. This includes such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures. This exemption shall not be construed as allowing the construction of roads, bike paths or other transportation routes in such easements, regardless of paving material, except for access for the uses specifically cited in Item a., above. c. Land development activities within a right-of-way existing at the time this ordinance takes effect or approved under the terms of this ordinance. d. Within an easement of any utility existing at the time this ordinance takes effect or approved under the terms of this ordinance, land disturbance activities and such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures. e. Emergency work necessary to preserve life or property. However, when emergency work is performed under this Section, the person performing it shall report such work to the Public Works Department on the next business day after commencement of the work. Within ten (10) days thereafter, the person shall apply for a permit and perform such work within such time period as may be determined by the City to be reasonably necessary to correct any impairment such emergency work may have caused to the water conveyance capacity, stability or water quality of the protection area. f. Forestry and silviculture activities on land that is zoned for forestry, silvicultural or agricultural uses and are not incidental to other land development activity. If such activity results in land disturbance in the buffer that would otherwise be prohibited, then no other land-disturbing activity other than normal forest management practices will be allowed on the entire property for three years after the end of the activities that intruded on the buffer. D. Land Development Requirements. 1. Buffer and Setback Requirements. All land development activity subject to this ordinance shall meet the following requirements: a. An undisturbed natural vegetative buffer shall be maintained for 50 feet, measured horizontally, on both banks (as applicable) of a non-perennial stream as measured from the top of the stream bank. An additional setback shall be maintained for 25 feet, measured horizontally, beyond the undisturbed natural vegetative buffer, in which all impervious cover shall be prohibited. Grading, filling and earthmoving shall be minimized within the setback. b. An undisturbed natural vegetative buffer shall be maintained for 100 feet, measured horizontally, on both banks (as applicable) of a perennial stream as measured from the top of the stream bank. An additional setback shall be maintained for 50 feet, measured horizontally, beyond the undisturbed natural vegetative buffer, in which all impervious cover shall be prohibited. Grading, filling and earthmoving shall be minimized within the setback. If approved by the City, the buffer requirement may be achieved by maintaining an average of width of 100 feet and a minimum distance of 50 feet from each side of the stream as measured horizontally from the top of the stream bank. If approved by the City, the setback may be achieved by restricting the construction of any impervious surface within an average setback of 150 feet on each side of the stream and a minimum distance of 75 feet as measured horizontally from the top of the stream bank. No averaging shall be allowed on the following: (1) Big Creek. (2) Foe Killer Creek. (3) Any perennial stream within a seven (7) mile radius upstream of the Roswell water supply intake protected pursuant to Section 3.3.12. c. No septic tanks or septic tank drain fields shall be permitted within the buffer or the setback. d. No solid fences greater than four (4) feet in height are permitted within the buffer. Fences that are not private in nature (such as split rail) may be allowed for the delineation of property or other purposes not intended to disturb the buffer area. 2. Variance Procedures. Variances from the above buffer and setback requirements may be granted in accordance with the following provisions: a. Where a parcel was platted prior to the effective date of this ordinance, and its shape, topography or other existing physical condition prevents land development consistent with this ordinance, and the City of Alpharetta finds and determines that the requirements of this ordinance prohibit the otherwise lawful use of the property by the owner, the City may grant a variance from the buffer and setback requirements hereunder, provided such variance require mitigation measures to offset the effects of any proposed land development on the parcel. b. Requests for variances shall follow the procedures described in Section 4.5 and Section 5.2. Variances will be considered only in the following cases: (1) When a property's shape, topography or other physical conditions existing at the time of the adoption of this ordinance prevents land development unless a buffer variance is granted. (2) Unusual circumstances when strict adherence to the minimal buffer requirements in the ordinance would create an extreme hardship. Variances will not be considered when, following adoption of this ordinance, actions of any property owner of a given property have created conditions of a hardship on that property. c. At a minimum, a variance request shall include the following information: (1) A site map that includes locations of all streams, wetlands, floodplain boundaries and other natural features, as determined by field survey; (2) A description of the shape, size, topography, slope, soils, vegetation and other physical characteristics of the property; (3) A detailed site plan that shows the locations of all existing and proposed structures and other impervious cover, the limits of all existing and proposed land disturbance, both inside and outside the buffer and setback. The exact area of the buffer to be affected shall be accurately and clearly indicated; (4) Documentation of unusual hardship should the buffer be maintained; (5) At least one alternative plan, which does not include a buffer or setback intrusion, or an explanation of why such a site plan is not possible; (6) A calculation of the total area and length of the proposed intrusion; (7) A stormwater management site plan, if applicable; and, (8) Proposed mitigation, if any, for the intrusion. If no mitigation is proposed, the request must include an explanation of why none is being proposed. d. The following factors will be considered in determining whether to issue a variance: (1) The shape, size, topography, slope, soils, vegetation and other physical characteristics of the property; (2) The locations of all streams on the property, including along property boundaries; (3) The location and extent of the proposed buffer or setback intrusion; and, (4) Whether alternative designs are possible which require less intrusion or no intrusion; (5) The long-term and construction water-quality impacts of the proposed variance; (6) Whether issuance of the variance is at least as protective of natural resources and the environment. E. Additional Information Requirements for Development on Buffer Zone Properties. All buffer and setback areas must be recorded on the final plat of the property following plan approval. Any permit applications for property requiring buffers and setbacks hereunder must include the following: 1. A site plan showing: a. The location of all streams on the property; b. Limits of required stream buffers and setbacks on the property; c. Buffer zone topography with contour lines at no greater than (2) two-foot contour intervals; d. Delineation of forested and open areas in the buffer zone; e. Detailed plans of all proposed land development in the buffer and of all proposed impervious cover within the setback; and f. Location of the floodplain; 2. A description of all proposed land development within the buffer and setback; and, 3. Any other documentation that the City of Alpharetta may reasonably deem necessary for review of the application and to ensure that the buffer zone ordinance is addressed in the approval process. F. Responsibility. Neither the issuance of a development permit nor compliance with the conditions thereof, nor with the provisions of this ordinance shall relieve any person from any responsibility otherwise imposed by law for damage to persons or property; nor shall the issuance of any permit hereunder serve to impose any liability upon the City of Alpharetta, its officers or employees, for injury or damage to persons or property. G. Inspection. The City may cause inspections of the work in the buffer or setback to be made periodically during the course thereof and shall make a final inspection following completion of the work. The permittee shall assist the City in making such inspections. The City shall have the authority to conduct such investigations as it may reasonably deem necessary to carry out its duties as prescribed in this ordinance, and for this purpose to enter at reasonable time upon any property, public or private, for the purpose of investigating and inspecting the sites of any land development activities within the protection area. No person shall refuse entry or access to any authorized representative or agent who requests entry for purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out official duties. 3.3.3 Wetlands. A. Definitions. Wetlands. Areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Generalized Wetlands Map. The current U.S. fish and Wildlife Service National Wetlands Inventory maps for the City of Alpharetta, Georgia. Jurisdictional Wetlands. An area that meets the definitional requirements for wetlands as determined by the U.S. Army Corps of Engineers. Jurisdictional Wetland Determination. A delineation of jurisdictional wetland boundaries by the U.S. Army Corps of Engineers, as required by Section 404 of the Clean Water Act, 33 U.S.C. § 1344, as amended. Regulated Activity. Any activity that will, or which may reasonably be expected to, result in the discharge of dredged or fill material into waters of the U.S. excepting those activities exempted in Section 404 of the Federal Clean Water Act. B. Establishment of the Wetlands Protection District. The Wetlands Protection District is hereby established which shall correspond to all lands within the jurisdiction of the City of Alpharetta Georgia that are mapped as wetland areas by the U.S. Fish and Wildlife Service National Wetlands Inventory Maps. This map shall be referred to as the Wetlands Map and is hereby adopted by reference and declared to be a part of this ordinance, together with all explanatory matter thereon and attached thereto. The Wetlands Map does not represent the boundaries of jurisdictional wetlands and cannot serve as a substitute for a delineation of wetland boundaries by the U.S. Army Corps of Engineers, as required by Section 404 of the Clean Water Act, as amended. Any local government action under this ordinance does not relieve the landowner from federal or state permitting requirements. C. Protection Criteria. No regulated activity will be permitted within the Wetlands Protection District without a permit from the City of Alpharetta. If the area proposed for development is located within 50 feet of a Wetlands Protection District boundary, as determined by the Director using the Generalized Wetlands Map, a U.S. Army Corps of Engineers determination shall be required. If the Corps determines that wetlands are present on the proposed development site, the local permit or permission will not be granted until a Section 404 Permit or Letter of Permission is issued. The filling in of established lakes, ponds and wetlands is discouraged. D. Permitted Uses. The following uses shall be allowed as of right within the Wetlands Protection District to the extent that they are not prohibited by any other ordinance or law, including laws of trespass, and provided they do not require structures, grading, fill, draining, or dredging except as provided herein. 1. Conservation or preservation of soil, water, vegetation, fish and other wildlife, provided it does not affect waters of Georgia or of the United States in such a way that would require an individual 404 Permit. 2. Outdoor passive recreational activities, including fishing, bird watching, hiking, boating, horseback riding, and canoeing. 3. Forestry practices applied in accordance with best management practices approved by the Georgia Forestry Commission and as specified in Section 404 of the Clean Water Act. 4. The cultivation of agricultural crops. Agricultural activities shall be subject to best management practices approved by the Georgia Department of Agriculture. 5. The pasturing of livestock, provided that riparian wetlands are protected, that soil profiles are not disturbed and that approved agricultural Best Management Practices are followed. 6. Education, scientific research, and nature trails. E. Prohibited Uses. The following uses are not permitted within the Wetlands Protection District. 1. Receiving areas for toxic or hazardous waste or other contaminants; 2. Hazardous or sanitary waste landfills; F. Administration, plan review, and permitting procedures are provided for in Section 4. 4 of this code. 3.3.4 Illicit Discharge and Illegal Connection. A. Findings. It is hereby determined that: Discharges to the City of Alpharetta's separate storm sewer system that are not composed entirely of stormwater runoff contribute to increased nonpoint source pollution and degradation of receiving waters; These non-stormwater discharges occur due to spills, dumping and improper connections to the City's separate storm sewer system from residential, industrial, commercial or institutional establishments. These non-stormwater discharges not only impact waterways individually, but geographically dispersed, small volume non-stormwater discharges can have cumulative impacts on receiving waters. The impacts of these discharges adversely affect public health and safety, drinking water supplies, recreation, fish and other aquatic life, property values and other uses of lands and waters; These impacts can be minimized through the regulation of spills, dumping and discharges into the City's separate storm sewer system; Localities in the State of Georgia are required to comply with a number of State and Federal laws, regulations and permits which require a locality to address the impacts of stormwater runoff quality and nonpoint source pollution due to improper non-stormwater discharges to the City's separate storm sewer system; Therefore, the City of Alpharetta adopts this ordinance to prohibit such non-stormwater discharges to the City's separate storm sewer system. It is determined that the regulation of spills, improper dumping and discharges to the City's separate storm sewer system is in the public interest and will prevent threats to public health and safety, and the environment. B. Purpose and Intent. The purpose of this ordinance is to protect the public health, safety, environment and general welfare through the regulation of non-stormwater discharges to the City's separate storm sewer system to the maximum extent practicable as required by Federal law. This ordinance establishes methods for controlling the introduction of pollutants into the City's separate storm sewer system in order to comply with requirements of the National Pollutant Discharge Elimination System (NPDES) permit process. The objectives of this ordinance are to: 1. Regulate the contribution of pollutants to the City's separate storm sewer system by any person; 2. Prohibit illicit discharges and illegal connections to the City's separate storm sewer system; 3. Prevent non-stormwater discharges, generated as a result of spills, inappropriate dumping or disposal, to the City's separate storm sewer system; and, 4. To establish legal authority to carry out all inspection, surveillance, monitoring and enforcement procedures necessary to ensure compliance with this ordinance; 5. No variances shall be granted to illicit discharge or illegal connection. C. Applicability, Compatibility with Other Regulations, Severability, and Responsibility for Administration. 1. The provisions of this ordinance shall apply throughout the incorporated area of Alpharetta. 2. This ordinance is not intended to modify or repeal any other ordinance, rule, regulation, or other provision of law. The requirements of this ordinance are in addition to the requirements of any other ordinance, rule, regulation, or other provision of law, and where any provision of this ordinance imposes restrictions different from those imposed by any other ordinance, rule, regulation, or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control. 3. If the provisions of any section, subsection, paragraph, subdivision or clause of this ordinance shall be adjudged invalid by a court of competent jurisdiction, such judgement shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this ordinance. 4. The City shall administer, implement, and enforce the provisions of this ordinance. D. Definitions. Accidental Discharge means a discharge prohibited by this ordinance which occurs by chance and without planning or thought prior to occurrence. City Separate Storm Sewer System means any facility designed or used for collecting and/or conveying stormwater, including but not limited to any roads with drainage systems, highways, city streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, ditches, swales, natural and manmade or altered drainage channels, reservoirs, and other drainage structures, and which is: a. Owned or maintained by the city; b. Not a combined sewer; and c. Not part of a publicly owned treatment works. Clean Water Act means the Federal Water Pollution Control Act (33 USC § 1251 et seq.), and any subsequent amendments thereto. Construction Activity means activities subject to the Georgia Erosion and Sedimentation Control Act or NPDES General Construction Permits. These include construction projects resulting in land disturbance. Such activities include but are not limited to clearing and grubbing, grading, excavating, and demolition. Illicit Discharge means any direct or indirect non-stormwater discharge to the city separate storm sewer system, except as exempted in 3.3.4 D. Illegal Connection means either of the following: a. Any pipe, open channel, drain or conveyance, whether on the surface or subsurface, which allows an illicit discharge to enter the storm drain system including but not limited to any conveyances which allow any non-stormwater discharge including sewage, process wastewater, and wash water to enter the storm drain system, regardless of whether such pipe, open channel, drain or conveyance has been previously allowed, permitted, or approved by an authorized enforcement agency; or b. Any pipe, open channel, drain, or conveyance connected to the city separate storm sewer system which has not been documented in plans, maps, or equivalent records and approved by an authorized enforcement agency. Industrial Activity means activities subject to NPDES Industrial Permits as defined in 40 CFR, Section 122.26(b)(14). National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit means a permit issued by the Georgia EPD under authority delegated pursuant to 33 USC §1342(b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis. Non-Stormwater Discharge means any discharge to the storm drain system that is not composed entirely of stormwater. Person means, except to the extent exempted from this ordinance, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city county or other political subdivision of the State, any interstate body or any other legal entity. Pollutant means anything which causes or contributions to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; petroleum hydrocarbons; automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals; non-hazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that some may cause or contribute to pollution; floatables; pesticides, herbicides, and fertilizers; liquid and solid wastes; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from construction or building or structure; concrete and cement; and noxious or offensive matter of any kind. Pollution means the contamination or other alteration of any water's physical, chemical or biological properties by the addition of any constituent and includes but is not limited to, a change in temperature, taste, color, turbidity, or odor of such waters, or the discharge of any liquid, gas, solid, radioactive, or other substance into any such waters as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety, welfare, or environment, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish, or other aquatic life. Premises mean any building, lot, parcel of land, or portion of land whether improved or unimproved including adjacent sidewalks and parking strips. State Waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface and subsurface water, natural, or artificial, lying within or forming a part of the boundaries of the State of Georgia which are not entirely confined and retained completely upon the property of a single person. Stormwater Runoff or Stormwater means any surface flow, runoff, and drainage consisting entirely of water from any form of natural precipitation and resulting from such precipitation. Structural Stormwater Control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow. E. Prohibition of Illicit Discharges. No person shall throw, drain, run, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise discharge into any component of the City of Alpharetta separate storm sewer system, or to cause permit or suffer to be thrown, drained, run, or allow to seep or otherwise discharge, into such system, any pollutants or waters containing any pollutants, other than stormwater. 1. The following discharges are exempt from the prohibition provision above: a. Water line flushing performed by a government agency, other potable water sources, landscape irrigation or lawn watering, diverted stream flows, rising ground water, ground water infiltration to storm drains, uncontaminated pumped ground water, foundation or footing drains (not including active groundwater dewatering systems), crawl space pumps, air conditioning condensation, springs, natural riparian habitat or wetland flows, and any other water source not containing pollutants; b. Discharges or flows from firefighting, and other discharges specified in writing by the City of Alpharetta as being necessary to protect public health and safety; c. The prohibition provision above shall not apply to any non-stormwater discharge permitted under an NPDES permit or order issued to the discharger and administered under the authority of the State and the Federal Environmental Protection Agency, provided that the discharger is in full compliance with all requirements of the permit, waiver, or order and other applicable laws and regulations, and provided that written approval from the City has been granted for any discharge to the City's separate storm sewer system. F. Prohibition of Illegal Connections. The construction, connection, use, maintenance or continued existence of any illegal connection to the City's separate storm sewer system is prohibited. 1. This prohibition expressly includes, without limitation, illegal connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of connection. 2. A person violates this ordinance if the person connects a line conveying sewage to the City's separate storm sewer system, or allows such a connection to continue. 3. The person responsible for any connection in violation of this Ordinance shall immediately cause the illegal connection to be disconnected and redirected, if necessary to Fulton County's sanitary sewer system upon approval by the Director of Fulton County' sanitary sewer department or an approved onsite wastewater management system. Such person shall provide the City with written confirmation that the connection has been disconnected, and, if necessary, redirected to Fulton County sanitary sewer. 4. Any drain or conveyance that has not been documented in plans, maps or equivalent, and which may be connected to the storm sewer system, shall be located by the owner or occupant of that property upon receipt of written notice of violation from the City requiring that such locating be completed. Such notice will specify a reasonable time period within which the location of the drain or conveyance is to be completed, that the drain or conveyance be identified as storm sewer, sanitary sewer or other, and that the outfall location or point of connection to the storm sewer system, sanitary sewer system or other discharge point be identified. Results of these investigations are to be documented and provided to the City. G. Industrial or Construction Activity Discharges. Any person subject to an industrial or construction activity NPDES stormwater discharge permit shall comply with all provisions of such permit. Proof of compliance with said permit may be required in a form acceptable to the City prior to allowing discharges to the City's separate storm sewer system. H. Access and Inspection of Properties and Facilities. Representatives of the City shall be permitted to enter and inspect properties and facilities at reasonable times as often as may be necessary to determine compliance with this ordinance. 1. If a property or facility has security measures in force which require proper identification and clearance before entry into its premises, the owner or operator shall make the necessary arrangements to allow access to representatives of the City. 2. The owner or operator shall allow representatives of the City ready access to all parts of the premises for the purposes of inspection, sampling, photography, videotaping, examination and copying of any records that are required under the conditions of an NPDES permit to discharge stormwater. 3. The City shall have the right to set up on any property or facility such devices as are necessary in the opinion of representatives of the City to conduct monitoring and/or sampling of flow discharges. 4. The City may require the owner or operator to install monitoring equipment and perform monitoring as necessary and make the monitoring data available to the Public Works Department. This sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the owner or operator at his/her own expense. All devices used to measure flow and quality shall be calibrated to ensure their accuracy. 5. Any temporary or permanent obstruction to safe and easy access to the property or facility to be inspected and/or sampled shall be promptly removed by the owner or operator at the written or oral request of the City and shall not be replaced. The costs of clearing such access shall be borne by the owner or operator. 6. Unreasonable delays in allowing representatives of the City access to a facility is a violation of this ordinance. 7. If a representative of the City has been refused access to any part of the premises from which stormwater is discharged, and the representative of the City is able to demonstrate probable cause to believe that there may be a violation of this ordinance, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this ordinance or any order issued hereunder, or to protect the overall public health, safety, environment and welfare of the community, then the representative of the City may seek issuance of a search warrant from any court of competent jurisdiction. I. Notification of Accidental Discharges and Spills. Notwithstanding other requirements of law, as soon as any person responsible for a facility, activity or operation, or responsible for emergency response for a facility, activity or operation has information of any known or suspected release of pollutants or non-stormwater discharges from that facility or operation which are resulting or may result in illicit discharges or pollutants discharging into stormwater, the City's separate storm sewer system, State Waters, or Waters of the U.S., said person shall take all necessary steps to ensure the discovery, containment, and cleanup of such release so as to minimize the effects of the discharge. Said person shall notify the Public Works Department by phone, facsimile, or in person within 24 hours of the nature, quantity and time of occurrence of the discharge. Notifications in person or by phone shall be confirmed by written notice addressed and mailed to the Public Works Department within three business days of the phone or in person notice. If the discharge of prohibited materials emanates from a commercial or industrial establishment, the owner or operator of such establishment shall also retain an on-site written record of the discharge and the actions taken to prevent its recurrence. Such records shall be retained for at least three years. Said person shall also take immediate steps to ensure no recurrence of the discharge or spill. In the event of such a release of hazardous materials, emergency response agencies and/or other appropriate agencies shall be immediately notified. Failure to provide notification of a release as provided above is a violation of this ordinance. 3.3.5 Conservation subdivision. A. Purposes. 1. To provide for the preservation of greenspace as a nonstructural stormwater runoff and watershed protection measure. 2. To provide a residential zoning district that permits flexibility of design in order to promote environmentally sensitive and efficient uses of the land. 3. To preserve in perpetuity unique or sensitive natural resources such as groundwater, floodplains, wetlands, streams, steep slopes, woodlands and wildlife habitat. 4. To permit clustering of houses and structures on less environmentally sensitive soils which will reduce the amount of infrastructure, including paved surfaces and utility easements, necessary for residential development. 5. To reduce erosion and sedimentation by minimizing land disturbance and removal of vegetation in residential development. 6. To promote interconnected greenways and corridors throughout the community. 7. To promote contiguous greenspace with adjacent jurisdictions. 8. To encourage interaction in the community by clustering houses and orienting them closer to the street, providing public gathering places and encouraging use of parks and community facilities as focal points in the neighborhood. 9. To encourage street designs that reduce traffic speeds and reliance on main arteries. 10. To promote construction of convenient landscaped walking trails and bike paths both within the subdivision and connected to neighboring communities, businesses, and facilities to reduce reliance on automobiles. 11. To conserve scenic views and reduce perceived density by maximizing the number of houses with direct access to and views of open space. 12. To preserve important historic and archaeological sites. 13. No variances shall be granted to conservation subdivisions. B. General Regulations. 1. Applicability of Regulations. This Conservation Subdivision option is available in the Residential Estate (RE) zoning district as a use by right. Applicant shall comply with all other provisions of the zoning code and all other applicable laws, except those that are incompatible with the provisions contained herein. 2. Ownership of Development Site. The tract of land to be subdivided may be held in single and separate ownership or in multiple ownership. If held in multiple ownership, however, the site shall be developed according to a single plan with common authority and common responsibility. 3. Housing Density Determination. The maximum number of lots in the Conservation Subdivision shall be determined by either of the following two methods, at the discretion of the City: a. Calculation: The maximum number of lots is determined by dividing the area of the tract of land by the minimum lot size specified in the underlying zoning. In making this calculation, the following shall not be included in the total area of the parcel: (1) Slopes over 25 percent of at least 5,000 square feet contiguous area; (2) The 100-year floodplain; (3) Bodies of open water over 5,000 square feet contiguous area; (4) Wetlands that meet the definition of the Army Corps of Engineers pursuant to the Clean Water Act; (5) Anticipated right-of-way needs for roads and utilities; or, (6) Required stream buffers. b. Yield Plan: The maximum number of lots is based on a conventional subdivision design plan prepared by the applicant, in which the tract of land is subdivided in a manner intended to yield the highest number of lots possible. The plan does not have to meet formal requirements for a site design plan, but the design must be capable of being constructed given site features and all applicable regulations. C. Application Requirements. 1. Site Analysis Map Required. Concurrent with the submission of a preliminary plat, Applicant shall prepare and submit a site analysis map. The purpose of the site analysis map is to ensure that the important site features have been adequately identified prior to the creation of the site design, and that the proposed Open Space will meet the requirements of this article. The preliminary plat shall include the following features, in addition to the other requirements of this document. a. Property boundaries; b. All streams, rivers, lakes, wetlands and other hydrologic features; c. Topographic contours of no less than 10-foot intervals; d. All Primary and Secondary Conservation Areas labeled by type, as described in Section 4 of this Article; e. General vegetation characteristics; f. General soil types; g. The planned location of protected Open Space; h. Existing roads and structures; and, i. Potential connections with existing greenspace and trails. 2. Open Space Management Plan Required. An open space management plan, as described in Section 4, shall be prepared and submitted prior to the approval of the preliminary plat. 3. Instrument of Permanent Protection Required. An instrument of permanent protection, such as a conservation easement or permanent restrictive covenant and as described in Subsection D below, shall be placed on the Open Space concurrent with the issuance of a land disturbance permit. 4. Other Requirements. The Applicant shall adhere to all other applicable requirements of the underlying zoning and the Unified Development Code. D. Open Space. 1. Definition. Open Space is the portion of the conservation subdivision that has been set aside for permanent protection. Activities within the Open Space are restricted in perpetuity through the use of an approved legal instrument. 2. Standards to Determine Open Space. a. The minimum restricted Open Space shall comprise at least 40% of the gross tract area. b. The following are considered Primary Conservation Areas and are required to be included within the Open Space, unless the Applicant demonstrates that this provision would constitute an unusual hardship and be counter to the purposes of this article: (1) The regulatory 100-year floodplain; (2) Buffer zones of at least 75 ft. width along all perennial and intermittent streams; (3) Slopes above 25 percent of at least 5,000 square feet contiguous area; (4) Wetlands that meet the definition used by the Army Corps of Engineers pursuant to the Clean Water Act; (5) Populations of endangered or threatened species, or habitat for such species; and, (6) Archaeological sites, cemeteries and burial grounds. c. The following are considered Secondary Conservation Areas and should be included within the Open Space to the maximum extent feasible: (1) Important historic sites; (2) Existing healthy, native forests of at least one acre contiguous area; (3) Individual existing healthy trees greater than 8 inches caliper, as measured from their outermost drip line; (4) Other significant natural features and scenic viewsheds such as ridge lines, peaks and rock outcroppings, particularly those that can be seen from public roads; (5) Prime agricultural lands of at least five acres contiguous area; and, (6) Existing trails that connect the tract to neighboring areas. d. Above-ground utility rights-of-way and small areas of impervious surface may be included within the protected Open Space but cannot be counted towards the 40 percent minimum area requirement (exception: historic structures and existing trails may be counted). Large areas of impervious surface shall be excluded from the Open Space. e. At least 75 percent of the Open Space shall be in a contiguous tract. The Open Space should adjoin any neighboring areas of Open Space, other protected areas, and non-protected natural areas that would be candidates for inclusion as part of a future area of protected Open Space. f. The Open Space shall be directly accessible to the largest practicable number of lots within the subdivision. Non-adjoining lots shall be provided with safe, convenient access to the Open Space. 3. Permitted Uses of Open Space. Uses of Open Space may include the following: a. Conservation of natural, archeological or historical resources; b. Meadows, woodlands, wetlands, wildlife corridors, game preserves, or similar conservation-oriented areas; c. Walking or bicycle trails, provided they are constructed of porous paving materials; d. Passive recreation areas; e. Active recreation areas, provided that they are limited to no more than 10 percent of the total Open Space, are not located within Primary Conservation Areas, and do not require significant tree removal. Active recreation areas may include impervious surfaces. Active recreation areas in excess of this limit must be located outside of the protected Open Space; f. Agriculture, horticulture, silviculture or pasture uses, provided that all applicable best management practices are used to minimize environmental impacts, such activities are not conducted within Primary Conservation Areas, and such activities are in compliance with this ordinance; g. Nonstructural stormwater management practices, provided that they are limited to no more than 10 percent of the total Open Space, are not located within Primary Conservation Areas, and do not require significant tree removal; h. Easements for drainage, access, and underground utility lines, provided that they are limited to no more than 10 percent of the total Open Space, are not located within Primary Conservation Areas, and do not require significant tree removal; or i. Other conservation-oriented uses compatible with the purposes of this ordinance. 4. Prohibited uses of Open Space. a. Golf courses; b. Roads, parking lots and impervious surfaces, except as specifically authorized in the previous sections; c. Agricultural and forestry activities not conducted according to accepted Best Management Practices; and, d. Other activities as determined by the Applicant and recorded on the legal instrument providing for permanent protection. 5. Ownership and Management of Open Space. a. Ownership of Open Space. The applicant must identify the owner of the Open Space who is responsible for maintaining the Open Space and facilities located thereon. If a Homeowners Association is the owner, membership in the association shall be mandatory and automatic for all homeowners of the subdivision and their successors. If a Homeowners Association is the owner, the Homeowners' Association shall have lien authority to ensure the collection of dues from all members. The responsibility for maintaining the Open Space and any facilities located thereon shall be borne by the owner. b. Management Plan. Applicant shall submit a Plan for Management of Open Space and Common Facilities ("Plan") that: (1) Allocates responsibility and guidelines for the maintenance and operation of the Open Space and any facilities located thereon, including provisions for ongoing maintenance and for long-term capital improvements; (2) Estimates the costs and staffing requirements needed for maintenance and operation of, and insurance for, the Open Space and outlines the means by which such funding will be obtained or provided; (3) Provides that any changes to the Plan be approved by the Board of Commissioners; and, (4) Provides for enforcement of the Plan. c. In the event the party responsible for maintenance of the Open Space fails to maintain all or any portion in reasonable order and condition, the City may assume responsibility for its maintenance and may enter the premises and take corrective action, including the provision of extended maintenance. The costs of such maintenance may be charged to the owner, Homeowner's Association, or to the individual property owners that make up the Homeowner's Association, and may include administrative costs and penalties. Such costs shall become a lien on all subdivision properties. 6. Legal Instrument for Permanent Protection. a. The Open Space shall be protected in perpetuity by a binding legal instrument that is recorded with the deed. The instrument shall be one of the following: (1) A permanent conservation easement in favor of either: (i) A land trust or similar conservation-oriented non-profit organization with legal authority to accept such easements. The organization shall be bona fide and in perpetual existence and the conveyance instruments shall contain an appropriate provision for retransfer in the event the organization becomes unable to carry out its functions; or (ii) A governmental entity with an interest in pursuing goals compatible with the purposes of this ordinance. If the entity accepting the easement is not the City, then a third right of enforcement favoring the City shall be included in the easement; (2) A permanent restrictive covenant for conservation purposes in favor of a governmental entity; or, (3) An equivalent legal tool that provides permanent protection, if approved by the City. b. The instrument for permanent protection shall include clear restrictions on the use of the Open Space. These restrictions shall include all restrictions contained in this article, as well as any further restrictions the Applicant chooses to place on the use of the Open Space. 3.3.6 Water supply watershed protection. A. Definitions. Buffer. A natural or enhanced vegetated area with no or limited minor land disturbances, such as trails and picnic areas, located adjacent to reservoirs or perennial streams within a water supply watershed. Corridor. All land within the buffer areas established adjacent to reservoirs or perennial streams within a water supply watershed and within other setback areas specified in Section IV of this ordinance. Impervious Surface. A man-made structure or surface that prevents the infiltration of storm water into the ground below the structure or surface. Examples are buildings, roads, driveways, parking lots, decks, swimming pools, or patios. Perennial Stream. A stream that has normal stream flow consisting of base flow (discharge that enters the stream channel mainly from groundwater) or both base flow and direct runoff during any period of the year. Small Water Supply Watershed. A watershed that contains less than 100 square miles of land within the drainage basin upstream of a governmentally owned public drinking water supply intake. Utility. Public or private water or sewer piping systems, water or sewer pumping stations, electric power lines, fuel pipelines, telephone lines, roads, driveways, bridges, river/lake access facilities, stormwater systems and railroads or other utilities identified by a local government. Water Supply Watershed. The area of land upstream of a governmentally owned public drinking water intake. B. Establishment of a Water Supply Watershed District. The Roswell Water Supply Watershed District is hereby designated and shall comprise the land that drains to City of Roswell water intake at Big Creek. The boundary of this overlay is defined by the ridgeline of the watershed and the boundary of a radius of seven (7) miles upstream of the Roswell Water Supply Intake. This overlay is delineated and defined on the Water Supply Watershed Protection District Map of The City of Alpharetta, hereafter referred to as The Map. The Map is hereby incorporated into and made a part of this ordinance by reference. The Roswell Intake is within a small water supply watershed. An intake for the City of Roswell Georgia is located on Big Creek. This Water Supply Watershed does not contain a reservoir. C. Protection Criteria. The following regulations shall apply to the Roswell Water Supply Watershed within the City of Alpharetta as identified on the Map. Stream buffer requirements are also established as part of the City of Alpharetta Soil Erosion and Sedimentation Control Ordinance and the Stormwater Owner Ordinance. In areas of conflict, the stricter Ordinance will prevail. 1. The corridors of all perennial streams within a seven mile radius upstream of the Roswell water supply intake must be protected by the following criteria: a. A buffer shall be maintained for a distance of 100-feet on both sides of the stream as measured from the stream banks. b. No impervious surface shall be constructed within a 150-foot setback area on both sides of the stream as measured from the stream banks. Septic tanks and septic tank drain fields are prohibited in the 150-foot setback area. 2. The corridors of all perennial streams outside a seven-mile radius upstream of the Roswell water supply intake must be protected by the following criteria: a. A buffer shall be maintained for a distance of 50-feet on both sides of the stream as measured from the stream banks. b. No impervious surface shall be constructed within a 75-foot setback area on both sides of the stream as measured from the stream banks. Septic tanks and septic tank drain fields are prohibited in the 75-foot setback area. 3. The impervious surface area of facilities, including all public and private structures and utilities, within the water supply watershed shall be limited to 25% of the total area within the development, or the existing use, whichever is greater. The total amount of impervious area may exceed the 25% impervious limit if the following conditions are met and approved by the City. a. The impervious surface area of facilities, including all public and private structures and utilities, within the water supply watershed shall be limited to 25% of the total area within the development, or the existing use, whichever is greater. All impervious surfaces must be included in the determination of the total impervious surface density of the City. b. If the pending Big Creek Watershed Study recommendations are formally adopted by all of the local governments within the watershed, then the following approach may be considered: the total amount of impervious area may exceed the 25% impervious limit if the following conditions are met and approved by the City. The total directly connected impervious surface area within the development shall not exceed 25%. Impervious can be considered disconnected from the drainage system if the runoff from the impervious surface flows over a minimum of 25 feet of pervious surface or if the runoff from 1.2 inches of rainfall is treated by the following water quality best management practices: (1) Wet ponds (extended detention for less than 20 acres)—ED-micro pool. (2) Wetlands—constructed. (3) Infiltration Trenches. (4) Dry Swales. (5) Sand Filters. (6) Bio-retention. (7) Vegetated filtration Systems. (8) Any other best management practice approved by the city. 4. a. New facilities which handle hazardous materials of the types listed in Section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and amounts of 10,000 pounds or more on any one day, shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements or the requirements of the Standard Fire Prevention Code. b. New sanitary landfills are allowed only if they have synthetic liners and leachate collection systems. c. New hazardous waste treatment or disposal facilities are prohibited. D. Exemptions. The following uses shall be exempted: 1. Land uses existing prior to the adoption of this ordinance. 2. Mining activities permitted by the Department of Natural Resources under the Surface Mining Act. 3. Utilities from the stream corridor buffer and setback area provisions in accordance with the following conditions if the utilities to be located in the buffer or setback areas cannot feasibly be located outside these areas: a. The utilities shall be located as far from the stream bank as reasonably possible. b. The installation and maintenance of the utilities shall be such to protect the integrity of the buffer and setback areas as best as reasonably possible. c. The utilities shall not impair the quality of the drinking water stream. 4. Specific forestry and agricultural activities in the stream corridor buffer and setback areas in accordance with the following conditions: a. The activity shall be consistent with best management practices established by the Georgia Forestry Commission or the Georgia Department of Agriculture. b. The activity shall not impair the quality of the drinking water stream. E. Administration. Administration, enforcement, review and permitting shall be as per Section 4.4 of this Code. All development activities or site work conducted after approval of the site plan shall conform to the specifications of said site plan. Changes to the approved plans must be approved by the Director. The following activities and developments are exempt from the requirement for detailed site plans: 1. Detached 'For-Sale' dwellings constructed within a subdivision of fewer than five parcels. 2. Repairs to a facility that is part of a previously approved and permitted development. 3. Construction of minor structures, such as sheds or additions to residences. 4. Commercial development of under 800 square feet within the Central Business District. F. Suspension, Revocation. The Director may suspend or revoke a permit if she finds that the applicant has not complied with the conditions or limitations set forth in the permit or has exceeded the scope of the work set forth in the permit. 3.3.7 Groundwater recharge areas. A. Definitions. Aquifer. Any stratum or zone of rock beneath the surface of the earth capable of containing or producing water from a well. Drastic. The standardized system for evaluating groundwater pollution potential using the hydro geologic settings described in U.S. Environmental Protection Agency document EPA-600-2-87-035. Pollution Susceptibility. The relative vulnerability of an aquifer to being polluted from spills, discharges, leaks, impoundments, application of chemicals and other human activities in the recharge area. Pollution Susceptibility Map. The relative vulnerability to pollution prepared by the Department of Natural Resources, using the DRASTIC methodology. (Georgia Department of Natural Resources Hydrologic Atlas 20: Groundwater Pollution Susceptibility Map of Georgia) Recharge Area. Any portion of the earth's surface, where water infiltrates into the ground to replenish an aquifer. Significant Recharge Areas. Those areas mapped by the Georgia Department of Natural Resources in Hydrologic Atlas 18 (1989 edition). Establishment of the Groundwater Recharge Area Protection District. The Groundwater Recharge Area District is hereby established which shall correspond to all lands within the jurisdiction of the City of Alpharetta, Georgia that are mapped as significant recharge areas by the Georgia Department of Natural Resources in Hydrologic Atlas 18, 1989 edition. Said map is hereby adopted and made a part of this ordinance. Determination of Pollution Susceptibility. Each recharge area shall be determined to have a pollution susceptibility of high, medium, or low based on the Georgia Pollution Susceptibility Map, Hydrologic Atlas 20, 1992 edition. Said map is hereby adopted and made a part of this ordinance. B. Protection Criteria. 1. No construction may proceed on a building to be served by a septic tank unless the Fulton County Health Department approves the proposed septic tank installations as meeting the requirements of the Georgia Department of Human Resource for On-Site Sewage Management (hereinafter DHR Manual), and Sections B. and C. below. 2. New homes served by a septic tank/drain field system shall be on lots having minimum size limitations as follows, based on application of Table MT-1 of the DHR Manual (hereinafter DHR Table MT-1). The minimums set forth in Table MT-1 may be increased further based on consideration of other factors (set forth in Sections A—F) of the DHR Manual. a. 150% of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a high pollution susceptibility area; b. 125% of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a medium pollution susceptibility area; c. 110% of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if they are within a low pollution susceptibility area. 3. New agricultural waste impoundment sites shall be lined if they are within a high pollution susceptibility area; a medium pollution susceptibility area and exceed 15 acres; or a low pollution susceptibility area and exceed 50 acres. As a minimum, the liner shall be constructed of compacted clay having a thickness of one-foot and a vertical hydraulic conductivity of less than 5 x 10 -7 cm/sec or other criteria established by the Natural Resource and Conservation Service. 4. New above-ground chemical or petroleum storage tanks, having a minimum volume of 660 gallons, shall have secondary containment for 110% of the volume of such tanks or 110% of the volume of the largest tank in a cluster of tanks. Such tanks used for agricultural purposes are exempt, provided they comply with all federal requirements. 5. New facilities that handle hazardous materials of the types listed in section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and in amounts of 10,000 pounds or more on any one day shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements and local fire code requirements. 6. Permanent storm water infiltration basins shall not be constructed in areas having high pollution susceptibility. C. Exemptions. 1. Any lot of record approved prior to the adoption of this ordinance is exempt from the minimum lot size requirements contained in [Article IV] Sections IV.B. and C. of this ordinance. D. Administration, plan review and permitting procedures are provided for in Section 4.4 of this Code. 1. The following activities and developments are exempt from the requirement for detailed site plans: a. Detached 'For-Sale' dwellings constructed within a subdivision of fewer than five parcels. b. Repairs to a facility that is part of a previously approved and permitted development. c. Construction of minor structures, such as sheds or additions to residences. 3.3.8 Variances from requirements applicable to sections 3.3.2, 3.3.3, 3.3.4, 3.3.6, and 3.3.7. A. The City may grant a variance in accordance with Section 5.2 if exceptional circumstances applicable to a site exist such that strict adherence to the provisions of this Ordinance will result in unnecessary hardship and will not fulfill the intent of the Ordinance. B. In order to have a variance considered, the applicant shall submit a written request to the City identifying the specific variance sought and the reasons that the variance should be granted. The written request shall include supporting data and all other information necessary to evaluate the proposed variance. C. The City will conduct a review of the request for a variance within fifteen (15) working days of receiving the request. 3.3.9 Violations, enforcement and penalties. Any action or inaction which violates the provisions of Section 3.3 of this ordinance or the requirements of an approved site plan, stormwater management plan, report, or permit, may be subject to the enforcement actions outlined in this Section. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements of this Ordinance. Any person who has violated or continues to violate the provisions of this ordinance, may be subject to the enforcement actions outlined in this Section or may be restrained by injunction or otherwise abated in a manner provided by law. The imposition of any of the penalties described below shall not prevent such equitable relief. In the event the violation constitutes an immediate danger to public health or public safety, representatives of the City are authorized to enter upon the subject private property, without giving prior notice, to take any and all measures necessary to abate the violation and/or restore the property. The City is authorized to seek costs of the abatement as outlined in this Section. A. Notice of Violation. If the City determines that an applicant or other responsible person has failed to comply with the terms and conditions of a permit, an approved stormwater management plan or the provisions of this ordinance, it shall issue a written notice of violation to such applicant or other responsible person. Where a person is engaged in activity covered by this ordinance without having first secured a permit therefor, the notice of violation shall be served on the owner or the responsible person in charge of the activity being conducted on the site. 1. The notice of violation shall contain: a. The name and address of the owner or the applicant or the responsible person; b. The address or other description of the site upon which the violation is occurring; c. A statement specifying the nature of the violation; d. A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the stormwater management plan or this ordinance and the date for the completion of such remedial action [the City shall provide a reasonable opportunity, of not less than ten days (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient) to cure the violation]; e. A statement of the penalty or penalties that may be assessed against the person to whom the notice of violation is directed and the City's intended action; and f. A statement that the determination of violation may be appealed to the City of Alpharetta by filing a written notice of appeal within thirty (30) days after the notice of violation (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours' notice shall be sufficient). 2. Such notice may require without limitation: a. The performance of monitoring, analyses, and reporting; b. The elimination of illicit discharges and illegal connections; c. That violating discharges, practices, or operations shall cease and desist; d. The abatement or remediation of stormwater pollution or contamination hazards and the restoration of any affected property; e. Payment of costs to cover administrative and abatement costs; and, f. The implementation of pollution prevention practices. B. Appeal of Notice of Violation. Any person receiving a Notice of Violation may appeal the determination of the City in accordance with Section 4.5 Appeals. The notice of appeal must be received within thirty (30) days from the date of the Notice of Violation. Hearing on the appeal before the Zoning Board of Appeals of their designee shall take place within 15 days from the date of receipt of the notice of appeal. The decision of the appropriate authority or their designee shall be final. C. Enforcement Measures After Appeal. If the violation has not been corrected pursuant to the requirements set forth in the Notice of Violation, or, in the event of an appeal, within ten (10) days of the decision of the appropriate authority upholding the decision of the City, then representatives of the City may enter upon the subject private property and are authorized to take any and all measures necessary to abate the violation and/or restore the property. It shall be unlawful for any person, owner, agent or person in possession of any premises to refuse to allow the government agency or designated contractor to enter upon the premises for the purposes set forth above. D. Costs of Abatement of the Violation. Within thirty (30) days after abatement of the violation, the owner of the property will be notified of the cost of abatement, including administrative costs. The property owner may file a written protest objecting to the assessment or to the amount of the assessment within fifteen (15) days of such notice. If the amount due is not paid within thirty (30) days after receipt of the notice, or if an appeal is taken, within thirty (30) days after a decision on said appeal, the charges shall become a special assessment against the property and shall constitute a lien on the property for the amount of the assessment. Any person violating any of the provisions of this article shall become liable to the City by reason of such violation. E. Penalties. In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, the City shall first notify the applicant or other responsible person in writing of its intended action, and shall provide a reasonable opportunity, of not less than ten (10) days (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24-hour notice shall be sufficient) to cure such violation. In the event the applicant or other responsible person fails to cure such violation after such notice and cure period, the City may take any one or more of the following actions or impose any one or more of the following penalties. 1. Stop Work Order—The City may issue a stop work order which shall be served on the applicant or other responsible person. The stop work order shall remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take the necessary remedial measures to cure such violation or violations. 2. Withhold Certificate of Occupancy—The City may refuse to approve a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein. 3. Suspension, Revocation or Modification of Permit—The City may suspend, revoke or modify the permit authorizing the land development project. A suspended, revoked or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided such permit may be reinstated [upon such conditions as the City may deem necessary] to enable the applicant or other responsible person to take the necessary remedial measures to cure such violations. 4. Penalties. a. In the event the applicant or other responsible person fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten (10) days, or such greater period as the City shall deem appropriate (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24-hour notice shall be sufficient), after the City has taken one or more of the actions described above, the City may impose a penalty not to exceed $2,000 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation. b. For intentional and flagrant violations of this ordinance, the City may issue a citation to the applicant or other responsible person, requiring such person to appear in any court of competent jurisdiction to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $2,000 or imprisonment for 30 days or both. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense. c. Each violation of this Ordinance is subject to a penalty not to exceed two thousand dollars ($2,000.00) or thirty (30) days in the City's jail. (1) The City may institute appropriate actions or proceedings at law or equity for the enforcement of this Ordinance; (2) Any court of competent jurisdiction shall have the right to issue restraining orders, temporary or permanent injunctions, or other appropriate forms of remedy or relief; (3) Each day of noncompliance is considered a separate offense; and (4) Nothing herein contained shall prevent the City from taking such other lawful action as is necessary to prevent or remedy any violation, including application for injunctive relief. d. Any person who undertakes any development activity requiring a stormwater management plan hereunder without first submitting the plan for review and approval shall pay to the City, in addition to any permit or inspection fee, an administrative fee of five thousand dollars ($5,000.00). e. The determination by the City that a violation of this Ordinance has occurred shall be conclusive and final unless the accursed violator submits a written request for a hearing within seven (7) days of the violation notice being served. F. Violations Deemed a Public Nuisance. In addition to the enforcement processes and penalties provided, any condition caused or permitted to exist in violation of any of the provisions of this ordinance is a threat to public health, safety, welfare, and environment and is declared and deemed a nuisance, and may be abated by injunctive or other equitable relief as provided by law. G. Remedies Not Exclusive. The remedies listed in this ordinance are not exclusive of any other remedies available under any applicable Federal, State or local law and the City of Alpharetta may seek cumulative remedies. The City may recover attorney's fees, court costs, and other expenses associated with enforcement of this ordinance, including sampling and monitoring expenses.
(Ord. No. 818, §§ 1—27(Exh. A), 12-14-2020) (Ord. No. 818, §§ 1—27(Exh. A), 12-14-2020) (Ord. No. 818, §§ 1—27(Exh. A), 12-14-2020) (Ord. No. 818, §§ 1—27(Exh. A), 12-14-2020) (Ord. No. 818, §§ 1—27(Exh. A), 12-14-2020) (Ord. No. 818, §§ 1—27(Exh. A), 12-14-2020) (Ord. No. 818, §§ 1—27(Exh. A), 12-14-2020) (Ord. No. 818, §§ 1—27(Exh. A), 12-14-2020) (Ord. No. 818, §§ 1—27(Exh. A), 12-14-2020)
Ask a question about Alpharetta law
Corpus searches the Alpharetta sections it holds and shows the ones that match, with their citations. Free, no sign-in.