Sec. 6-16-40. - Cable system construction plan, map and schedule.
(a) Map and detailed plan to be provided. A grantee shall submit a construction or reconstruction plan not less than 90 days prior to the date grantee intends to commence construction, and that plan shall be incorporated by reference and made a part of a franchise agreement. The plan shall include cable system design details, equipment specifications, and design performance criteria. The plan shall also include a map of the entire franchise area and shall clearly delineate the following: (1) Areas within the franchise area where the cable system will be available to subscribers, including a time schedule of construction or reconstruction for each year that construction or reconstruction is proposed; and (2) Areas within the franchise area where extension of the cable system cannot reasonably be done due to lack of present or planned development or other similar reasons, with the areas and the reasons for not serving them clearly identified on the map. (b) Delay in system construction or reconstruction requires consent by commission. Any delay in the cable system construction or reconstruction beyond the times specified in the plan time table shall require application to and consent by the commission. Any delay beyond the terms of the construction timetable, unless approved by the commission, will be considered a violation of the franchise for which the provisions of sections 6-16-94 through 6-16-97 shall apply. However, nothing in this section shall prevent a grantee from constructing or reconstructing the cable system earlier than planned. (c) Failure to proceed with construction and/or reconstruction expeditiously is grounds for revocation and/or liquidated damages. Construction or reconstruction in accordance with the plan submitted by a grantee shall occur according to the time schedule and shall commence as soon after the effective date of the franchise as is reasonably possible. Failure to proceed expeditiously shall be grounds for revocation of the franchise and/or liquidated damages. (d) Line extension policy. Extension of a cable system into any area not specifically treated in the plan shall nonetheless be required if the terms of any of the following conditions are met: (1) Mandatory extension rule. The grantee shall be required to extend energized cable from any existing activated lines of the cable system to any area immediately adjacent and not currently served by existing cable service, including residential, commercial, and industrial property having a density of at least 20 potential subscriber units per mile as measured in linear trench or aerial strand footage from the nearest technically feasible point on the system. The extension shall be at grantee's cost. The mandatory extension rule shall not apply to the Downtown Business Area as defined in a franchise agreement unless the government has provided notice to the grantee and the government has made available to the grantee open trenches. Upon the request of a potential subscriber, a grantee shall be required to extend energized cable from any existing activated lines of the grantee's cable system to serve the person requesting service; provided, that the location at which service has been requested, including residential, commercial and industrial property, is (i) within the grantee's service area; (ii) has a density of at least 20 potential subscriber units per mile as measured in linear trench or aerial strand from the nearest technically feasible point on the system, and (iii) is not passed by another cable operator's feeder cable. If a grantee has been requested to extend its system to serve an area that meets the foregoing standard for extension with respect to more than one grantee, and the grantee has refused to extend its system, the government's manager, after consultation with each affected grantee, shall determine which grantee shall be required to serve the area in question. Any extension under this section shall be at the grantee's expense. (2) Early extension. In areas not meeting the requirements for mandatory extension of cable service, a grantee shall provide, upon the request of one or more potential subscribers desiring cable service, an estimate of the costs for time and material required to extend cable service to said subscribers. A grantee shall then extend cable service upon request of said potential subscribers upon payment of cost for time and materials. A grantee may require advance payment or assurance of payment satisfactory to grantee. The amount paid by subscribers for early extension shall be nonrefundable, and in the event the area subsequently reaches the density required for mandatory extension, such payment shall be treated as consideration for early extension. (3) Nothing in this section shall be construed to prevent grantee from serving areas not covered under this section upon agreement with developers, property owners or residents. Grantee shall furnish and maintain services to each person within the franchise area who makes a bona fide request to receive any service that is based upon the requirements of this chapter. Nothing in a franchise agreement shall limit the right of the grantee to deny service to any household or individual which has a negative credit or service history with the grantee, which may include nonpayment of bills or theft or damage to the grantee's equipment, or who has threatened or assaulted employees of the grantee in the course of their employment. In the event service is denied, the grantee will give written notice within 10 days to the subscriber of his right to notify to the government the grantee's decision to deny service. (e) Service drops: (1) Grantee shall make service available to any subscriber within Athens-Clarke County upon a request and at the standard connection charge if the connection requires no more than a 125-foot aerial or underground drop measured from the nearest point of a subscribers home or place of business to the nearest active tap on the cable system whether or not street cutting or boring is required and shall include one outlet, and standard materials, and shall not involve a wall fish installation. (2) If making street cuts or borings will be necessary to provide service to a commercial subscriber and/or requires more than a standard drop (such as a wall fish installation), grantee may charge the subscriber (i) the standard connection charge and (ii) an amount equal to the reasonable actual labor and material costs incurred by grantee for the additional facilities and work. (3) Absent a showing by grantee to the manager of unusual circumstances (such as but not limited to street crossings), any standard drop shall be accomplished within seven working days of subscriber's request, a non standard drop shall be accomplished within 15 working days of a subscriber's request. (f) Aerial and underground drops in excess of 125 feet are not to exceed actual installation costs. With respect to requests for connection requiring an aerial or underground drop line in excess of 125 feet, a grantee must extend and make available cable service to such subscribers at a connection fee not to exceed the actual installation costs incurred by the grantee for the distance exceeding 125 feet. (g) Underground installation not to exceed standard installation if subscriber provided trenching and conduit. In the event that a subscriber independently provides for his or her own trenching and conduit (including any necessary boring, backfilling, replacing and/or replanting), the installation charge shall be the same as for a standard installation. Provided, however, that the subscriber agrees, in writing and in a form acceptable to the grantee and the government, to hold the grantee and the government harmless for any injury, loss or damage caused by or related to the work so undertaken by the subscriber, and that the grantee shall not be responsible for any service problems caused as a result of the work performed by the subscriber. In such case the installation by the grantee will consist of a standard service drop.
(Ord. of 12-5-95, § 1; Ord. of 10-4-2005, § 2)