For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

III — CONSTRUCTION OR EXCAVATION IN THE RIGHT-OF-WAY

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026), Atlanta, GA · 11 sections. Independent public-information project, not the official City of Atlanta website.

  1. § 138-65 — Permits for construction or excavation
  2. § 138-66 — Neighborhood identification signs
  3. § 138-67 — Pedestrian access
  4. § 138-68 — Scheduling and coordination of excavation
  5. § 138-69 — Rehabilitation and restoration of the pavement
  6. § 138-70 — Work done by public utilities
  7. § 138-71 — Availability of material and equipment before starting work
  8. § 138-72 — Building adjoining viaduct, bridge or tunnel
  9. § 138-73 — Protection for gas lines
  10. § 138-74 — Emergency excavations
  11. § 138-75 — Fees charged for permits which allow blocking or closing sidewalks or streets; etc