§ 138-69 — Rehabilitation and restoration of the pavement

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 138-69

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/d4f87fe6-dffc-4c82-a400-a3cfc7cd24ae

Sec. 138-69. - Rehabilitation and restoration of the pavement.

Whenever any person or contractor desires to cut or make an opening in any street or any sidewalk area, such person shall repair and restore the area, including milling and resurfacing, to the following specifications of the department of transportation: (a) Roadway rehabilitation and restoration: 1. If the existing pavement is up to four years old, mill and/or overlay 100 feet each side of the trench for the full width of the lane, lanes or street. 2. If the existing pavement is four years up to seven years old, mill and/or overlay 50 feet each side of the trench for the full width of the lane, lanes or street. 3. If the existing pavement is over seven years old, pavement repair shall be replaced in kind using construction procedures in accordance with the city standard details for the full width of the lane, lanes or street. 4. If in any one block or 500 linear feet, the cumulative damage to the pavement exceeds 200 square feet, the affected lane must be resurfaced for the length of damage. 5. If pavement is damaged in more than one lane, the city may require that the street be repaved across its full width. 6. If field conditions warrant, milling may be required prior to repaving. In the event of a requirement of milling, terms and conditions shall be specified in the permit. (b) Sidewalk rehabilitation and restoration: 1. Sidewalk pavers shall be replaced wholly in-kind and according to City of Atlanta code requirements and standards, including any special surfaces, at the sole cost of the permittee. 2. Any adjoining pavers broken or damaged as a result of work performed by a permittee, must be repaired or replaced within 30 days of work performed or upon receiving notification from the city. 3. Asphalt is not permitted to be used for permanent patching or filling of concrete. 4. Any temporary asphalt, or other filling material, used within the sidewalk area must be fully replaced and restored to concrete within 30 days. 5. Pavement made of special materials shall be restored in-kind and the permittee will be required to ensure pavers are affixed in a way that creates a smooth walking surface. If pavers made of special materials are damaged during excavation and are deemed not to be salvageable, it shall be the permittee's responsibility to identify similar materials and submit the specifications to the Department of Public Works for approval, prior to installing. 6. A permittee will be held responsible for removing any tripping hazards caused by work performed under its permit. 7. Any curb ramps or detectable warning surfaces damaged as a part of the permitted excavation or associated equipment, shall be inspected by the Department of Public Works to determine appropriate corrective course of action, including up to full reconstruction of the damaged curb ramp. 8. Any improvements shall be ADA compliant. (c) Striping restoration: Traffic control device striping and markings, including but not limited to colored lane applications, stop bars, and crosswalks, shall be restored in kind upon completion of paving restoration.

(Ord. No. 2001-22, § 1, 3-14-01; Ord. No. 2020-32(20-O-1379), § 30, 6-23-20)