§ 16-18I.012 — Development controls
Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code § 16-18I.012
Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/a281c3b6-fa48-48c1-9f82-59610dfda81e
Sec. 16-18I.012. - Development controls.
See SPI-9 Buckhead Village: Development Controls Table for Bulk Limitations, Yard Requirements, Open Space Requirements and other requirements subject to the sections 1 through 7 below: SPI-9 Buckhead Village: Development Controls Table Maximum Setback from back of required Sidewalk 1 | Type 1 Street | 25 feet Type 2 Street | 25 feet Type 3 Street | 20 feet Type 4 Street | 10 feet Subarea 1 | Subarea 2 | Subarea 3 | Subarea 4 Bulk Limitations 2 | Max. FAR without Bonuses | According to Map Attachment A Max. FAR with Bonuses | 8.2 | 5.0 for mixed use buildings 3.0 for single-use buildings | 5.0 for mixed use buildings 3.0 for single-use buildings | 5.0 Transfer of Development Rights | Properties designated as sending areas as shown on Map Attachment C with excess allowable floor area available may transfer floor area to properties designated as receiving areas as shown on Map Attachment C pursuant to section 16-18I.009. | Not permitted Residential Useable Open Space Requirements (USOR), including mixed-use developments with a residential component (See also section 16-18I.012.1). Note: Useable open space may be relocated per Section 1618I.012.5. | 20 percent of Net Lot Area or Gross Lot Area, as applicable, is required for any parcel over 1 acre. Otherwise, no useable open space requirements. | 25 percent of Net Lot Area or Gross Lot Area, as applicable, is required for any parcel over 1 acre. Otherwise, no useable open space requirements. | 20 percent of Net Lot Area or Gross Lot Area, as applicable, is required for any parcel over 1 acre. Otherwise, no useable open space requirements. Useable Open Space Requirements (USOR) for developments with no residential uses (See also section 16-18I.012.1). Note: useable open space may be relocated per section 16-18I.012.5. | 10 percent of Net Lot Area for any parcel over 1 acre. Otherwise, no useable open space requirements. Maximum Height with bonus(es) or transfer of development rights 3 | 225 feet | 150 feet | 150 feet | 225 feet Footnotes to Table above 1 A minimum of 60 percent of each property shall be fronted by buildings located no greater than the maximum distance listed by street type classification from the back of the required walk zone (see section 16-18I.012). See also supplemental zone requirements at section 16-18I.016. 2 Maximum FAR for development projects not seeking bonus density or bonus GFA as provided for in this chapter shall be as shown in Map Attachment A. Increased FAR and/or GFA may be allowed per section 16-18I.013. 3 Maximum height of any development that utilizes density bonuses (section 16-18I.013) or transfer of development rights. Developments are limited to transitional height restrictions where applicable and a maximum height as specified, except by special exception. 1. Useable open space requirement (UOSR): a. For all non-residential uses, mixed-use buildings and proposed developments utilizing bonuses as provided in section 18-18I.013 or transfer of development rights, UOSR shall be calculated utilizing net lot area (NLA). b. For residential uses not utilizing bonuses as provided in section 1618I.013 or a transfer of development rights, UOSR shall be calculated utilizing gross lot area (GLA). c. For all uses, a minimum of 50 percent of the useable open space requirement (UOSR) shall be public space as defined in section 1618I.006 with such public space having two or more points of entry from adjacent sidewalks and surrounding buildings. Also, see Figure 4 of the SPI-9 Graphic Appendix and Standards for public space character examples. 2. New streets incentive: New public streets and private streets that function as public streets (See section 16.18I.014) may be counted towards UOSR and public space requirements provided they conform to the Connect Atlanta Plan and all of the following criteria are met: a. Right-of-way and design of the new street shall meet applicable requirements of provided in sections 16-18I.014 and 16-18I.015 as shown in the SPI-9 Graphic Appendix and Standards; and b. No gates or other physical obstructions shall be permitted preventing access to such streets. 3. On-street parking incentive: New on-street parking may be counted towards UOSR and public space requirements provided all of the following criteria are met: a. No on-street parking currently exists in the public right-of-way adjacent to the project area for which credit is sought; b. New on-street parking is located where there is no existing street lane; c. New on-street parking occupies more than 60 percent of an entire block face or a minimum distance of 200 feet for parcels that occupy more than 300 feet of street frontage; d. Sidewalk bulb outs are provided at street intersections; and e. All other sidewalk requirements of this chapter are met. 4. Additional open space incentive: Useable open space, meeting the definition of public space as provided in section 16-18I.006 in excess of the required UOSR may be eligible for a density bonus as provided in section 16-18I.013. 5. Relocation of open space: Up to 50 percent of useable open space required (UOSR) for residential uses and up to 80 percent of useable open space (UOSR) required for non-residential uses may be relocated to an offsite parcel as follows: a. UOSR within Subarea 1 shall only be transferred to another parcel within Subarea 1 or Subarea 3. b. Within Subareas 2, 3, and 4, UOSR may be transferred to a parcel within Subarea 3. c. For all UOSR transfers all of the following criteria shall be met: i. The receiving parcel must contain the amount of open space required for any development of the receiving parcel in addition to the transferred amount of useable open space (UOSR), not including areas that reduce its utility for public access, recreation, and enjoyment such as excessive slopes over 15 percent; ii. The receiving parcel is owned and maintained either by a public agency, private property owner, or by a private property owners association and a copy of a valid maintenance agreement submitted to the director indicating the property owner and responsible party for the continuous maintenance of the open space; iii. The open space in the receiving parcel: 1. Shall be accessible to the public during normal city park hours; 2. Shall be no greater than 24 inches above or below the adjacent public sidewalk for a minimum distance of 15 feet from the adjacent sidewalk; 3. Shall be located, visible from and accessible (having no walls, fences, or other vertical obstructions) along a minimum of 60 percent of any adjacent sidewalk; and 4. Shall permit and encourage pedestrian access on a minimum of 60 percent of the surface of the open space including landscaped areas, fountains, pedestrian furniture, public art, and similar elements which are specifically listed in the application. 6. Area-wide stormwater management facility incentive: The owner of property upon which an area-wide stormwater management facility is constructed may be eligible for GFA bonus credit, as provided in section 16-18I.13 provided that: a. Said facility is located, designed and maintained in accordance with the requirements of the City of Atlanta Department of Watershed Management and the Georgia Environmental Protection Division and part of a stormwater management plan approved by the department of watershed management that includes each land development project being served by such facility; b. Said facility serves as the stormwater detention/retention area for at least two acres in the same drainage basin and is designed to provide a level of stormwater quantity and quality control that is equal to or greater than the stormwater quantity and quality control that would be afforded by separate on-site facilities; c. The developer of said facility provides the director with written agreements that any property which could reasonably be served by the facility will be allowed access; and d. Said facility either landscaped and integrated with adjacent useable open space that provide public amenities as approved by the director or not visible from any public right-of-way. 7. LEED Certification (or similar) incentive. To receive a density bonus for LEED Certification or similar, as provided in section 16-18I.013 the applicant shall submit for approval appropriate documentation prepared by a certified professional that the project, if constructed as proposed, achieves a minimum level of LEED Silver or equivalent standard as adopted by the City of Atlanta.
(Ord. No. 2010-54(10-O-1339), § 1(Att. A), 10-13-10)
Ask a question about Atlanta law
Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.
