Sec. 16-18I.005. - Application procedures and permits.

1. Special administrative permit (SAP) application: a. An SAP application and a specified number of copies each of a site plan, landscape plan, and elevation drawings of each exterior façade shall be submitted, as applicable, and approved by the director of the office of planning prior to an applicant filing for a building permit. All exterior demolition, new construction (including additions to existing buildings), modifications of outdoor dining, or any construction which results in increased lot coverage, modification of the building footprint, or modification of building façades that alters the configuration of openings at sidewalk-level, shall be subject to said SAP approval. b. An applicant shall arrange a conference to discuss the application and the requirements of this chapter with the director or their designee either prior or subsequent to SAP submittal provided that such meeting shall be held within 14 days of the date of the request by the applicant, unless a longer period is mutually agreed upon. All SAP applications shall be processed in accordance with the standards and procedures applicable to SAP applications contained in section 16-25 except as otherwise modified by this Chapter 18I. c. Where regulations require the approval of an SAP for purposes other than those so specified, processing by the director of the office of planning or the director's designee shall include consideration of other special administrative permits, without additional application. Where regulations require variance, special exception, rezoning, or special use permit action, the SAP for building permit purposes shall not be issued until the necessary approval has been obtained for such action. 2. Reserved. 3. Administrative variations: As part of general action when plans require approval of an SAP, the director of the office of planning or the director's designee may authorize variations from regulations generally applying based on written findings, to be filed as a public record, that either: a. A plan proposed by an applicant, while not strictly in accordance with regulations applying generally within the district, satisfies the public purposes and intent of such regulations, and provides public protection to an equivalent or greater degree than strict enforcement of such regulations would provide; or b. In the particular circumstances of the case, strict application of a particular regulation or regulations is not necessary for the accomplishment of public purposes or the provision of public protection, at that time or in the future. 4. Variances and special exceptions: Administrative variations shall not be authorized to be granted for any of the following requirements, whereas instead, such relief shall only be authorized by action of the board of zoning adjustment (BZA): a. A reduction of required transitional height planes or transitional yards where the boundaries of SPI-9 adjoin any residential district outside of SPI-9 without an intervening street; b. A reduction of open space requirements as specified in these SPI-9 regulations; c. A reduction of public access or public spaces as specified in these SPI-9 regulations; and d. An increase of the maximum height as specified in these SPI-9 regulations. 5. Floor area ratio and the application of bonuses. The FAR for each parcel within SPI-9 shall be as depicted on Map Attachment A except where modified by any zoning or special use permit condition. Where the Official Zoning Map would allow FAR different than the FAR shown on Map Attachment A, the FAR shown on Map Attachment A shall control provided, however, that Map Attachment A shall not control any zoning or special use permit condition. The FAR allowed in SPI-9 may be increased by the application of bonuses as set forth in these regulations provided, however, that amendments to the Official Zoning Map allowing a parcel additional FAR above the existing FAR for that parcel by the application of such bonuses shall be made in as set forth in section 16-27.001 et seq. for a change in condition of zoning with the following modifications: a. The application shall include calculations showing the current permitted FAR and the proposed FAR and the type of bonus which is to be applied to increase the FAR to the proposed level; b. The impact analysis for the proposed increase in FAR by this change of condition with respect to each of the matters enumerated in section 1627.004 shall discuss the effect of the increased FAR rather than the impact which would be associated with proposed change in a zoning classification; and c. The public notice issued pursuant to 16-27.007 shall include existing FAR, proposed FAR, the proposed maximum allowable FAR and the type of bonus which is to be applied to allow the increase of FAR to the proposed level.

(Ord. No. 2010-54(10-O-1339), § 1(Att. A), 10-13-10; Ord. No. 2018-11(18-O-1023), § 9.C, 5-16-18)

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.