For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 101.8 — ELECTRIC VEHICLE CHARGING INFRASTRUCTURE READINESS REQUIREMENT FOR NEW COMMERCIAL CONSTRUCTION

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code, App. B, ch. I, § 101.8

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/ae72eb9c-2d51-4f3a-be0a-f6d737393b4e

101.8. - ELECTRIC VEHICLE CHARGING INFRASTRUCTURE READINESS REQUIREMENT FOR NEW COMMERCIAL CONSTRUCTION.

(a) Definitions. (1) Accessible Electric Vehicle Charging Station ("Accessible Station") means an Electric Vehicle Charging Station where the Electric Vehicle Charging Station is located within accessible reach of a barrier-free access aisle and the Electric Vehicle to enable access and use by persons with disabilities, in accordance with the Americans with Disabilities Act of 1990 (42 U.S.C. § 12101) and the applicable regulations, as amended ("ADA"). (2) Electric Vehicle ("EV") means an automotive-type vehicle for on-road use, including but not limited to passenger automobiles, buses, trucks, vans, neighborhood Electric Vehicles, and electric motorcycles, powered by an electric motor that draws current from a rechargeable storage battery, fuel cell, photovoltaic array, or other source of electric current which is charged by being plugged into an electrical source. For the purpose of this ordinance, off-road, self-propelled Electric Vehicles, such as industrial trucks, hoists, lifts, transports, golf carts, airline ground support equipment, tractors, boats, and similar vehicles are not included in this definition. (3) EVSE Capable means a parking space that does not yet have an Electric Vehicle Charging Station installed, does have dedicated electrical panel capacity and reserved breaker or subpanel expansion, and some Electric Vehicle Supply Equipment infrastructure installed including, a dedicated branch circuit to provide enough power for future charging stations, one port per parking space with one 9600 VA circuit line provided during construction, or if a dual port is used to supply two adjoining parking spaces, two 9600 VA circuit lines. See Table 1 for a description and visual aid. (4) Electric Vehicle Charging Station (or "Charging Station") means a public or private parking space that is served by EVSE for charging and parking an Electric Vehicle. (5) EVSE Ready means an Electric Vehicle parking space that provides dedicated electrical panel capacity, conduit, and wiring installed that terminates at an outlet at the Electric Vehicle parking space but does not yet have an Electric Vehicle Charging Station installed. See Table 1 for a description and visual aid. (6) Electric Vehicle Supply Equipment ("EVSE") means the conductors, including the ungrounded, grounded, and equipment grounding conductors, and the Electric Vehicle connectors, attachment plugs, and all other fittings, devices, power outlets, or apparatus installed specifically for the purpose of transferring energy between the premises wiring and the Electric Vehicle. (7) EVSE Installed means an Electric Vehicle parking space with an Electric Vehicle Charging Station fully installed and operational, including all relevant Electric Vehicle Supply Equipment. The model and manufacturer of the charger may be chosen by the property owner. See Table 1 for a description and visual aid. (8) NEC means the current version of the National Electrical Code, as published by the National Fire Protection Association. Table 1. EVSE Capable, Ready and Installed. EVSE Capable | EVSE Ready | EVSE Installed [image omitted; see the official code] | [image omitted; see the official code] | [image omitted; see the official code] Enough electrical capacity is installed at the panel to support future EV charging spots. Additionally, there is a dedicated branch circuit to make sure enough power is available for future charging stations without overloading the system and raceway to future charging spots. Requires panel space and conduit. | A parking space is EVSE Ready when additional wiring and a junction box or an 8320 VA to 9600 VA outlet (like for a clothes dryer have been installed). This requires dedicated panel capacity, conduit, and wiring that safely terminates at the parking space. | Enables immediate EV charging to meet current and future demand. Requires installation of at least a Level 2 EV Charger. (9) Level-1 Charger means an Electric Vehicle Charging Station with a voltage range from 0 VA to 1920 VA. See Figure 1. (10) Level-2 Charger means an Electric Vehicle Charging Station with a voltage range from greater than 4800 VA to 9600 VA. See Figure 1. (11) Level-3 Charger means a Direct Current (DC) Electric Vehicle Charging Station with greater than 9600 VA. See Figure 1. Figure 1. Level 1, Level 2, and Level 3 Chargers Described [image omitted; see the official code] (12) Non-Electric Vehicle means any motor vehicle that is licensed and registered for operation on public and private highways, roads, and streets that does not meet the definition of Electric Vehicle. (13) Plug-In Hybrid Electric Vehicle ("PHEV") means an automotive-type vehicle for on-road use, including but not limited to passenger automobiles, buses, trucks, vans, neighborhood Electric Vehicles, electric motorcycles, powered by an electric motor that draws current from a rechargeable storage battery, fuel cell, photovoltaic array, or other source of electric current which is charged by being plugged into an electrical source, and having a second source of motive power such as an internal combustion engine. (b) Minimum Requirements. (1) All new occupancy classifications, including all new construction for mixed use zoning classifications and all new S-2 parking garages, including S-2 parking garages associated with other new occupancies classifications, shall meet the requirements for EVSE Capable and EVSE Installed established in this Section, to accommodate the installation of EVSE and Charging Stations. (2) EVSE shall be installed in accordance with the requirements of the current version of the International Building Code and the following ratios: (a) The off-street parking provided for all new occupancy classifications parking garages and new S- 2 parking garages associated with other new occupancies shall have EVSE installed at the parking spaces dedicated for the use of the building at the following ratio: (i) EVSE Capable parking spaces shall comprise 20% (or 1:5) of the required parking spaces. (ii) EVSE Installed parking spaces shall comprise 20% (or 1:5) of the required parking spaces in addition to EVSE Capable Spaces. (iii) EVSE Installed parking spaces shall be prioritized over EVSE Capable parking spaces in the case where fire safety requirements limit the number of EV parking spaces. (iv) EVSE Capable Spaces in new off-street parking areas constructed, owned, or operated by the City of Atlanta shall comprise 50% (or 1:2) of required parking spaces. (v) EVSE Installed Spaces in new off-street parking areas constructed, owned, or operated by the City of Atlanta shall comprise 25% (or 1:4) of required parking spaces. (3) All new off-street parking, or the expansion of the existing footprint of off-street parking for all parking lot occupancy classifications, including additional floors on existing parking decks, shall comply with the EVSE Installed and Capable requirements established in subsection (2)(b) of this section; provided, however, that parking spaces below grade or parking spaces three or more levels above the level of exit discharge shall not be required to comply with the ratio. (c) Electric Vehicle Supply Equipment Minimum Requirements. (1) EVSE Capable parking spaces shall include a raceway, which is continuous from the branch circuit or feeder panel location to the EVSE parking space. The raceway shall be sized and installed in accordance with the NEC, and shall be at least one inch (1") in size or of a size suitable for the required conductor size. The raceway shall include a pull rope or line installed for future conductor installation, and the raceway sealed and labeled for future use. (a) The electrical load capacity for the service panel shall be provided on the electrical permit documents to ensure the service panel has adequate electrical load capacity. (b) The electrical permit documents shall show a 14400 VA, 2-pole single phase, (12480 VA if 3-phase feeder supplied) branch circuit to provide for the future electrical load capacity needed for the required EVSE in accordance with the number of parking spaces established in section 101.8(1)(b). (c) All VA ratings shall apply the relevant demand factors in accordance with the NEC. (2) EVSE Installed parking spaces shall include, at the minimum a Level-2 Charger with a minimum load capacity of 9600 VA. (3) EV Charging Stations equipped with a Level-1, Level-2, or Level-3 Charger are permitted as an accessory use in all zoning districts. (4) EVSE, including Charging Stations shall be designed, located, and installed to prevent damage and minimize exposure to damage, including, but not limited to vehicle impact protection such as posts or bollards that meet the following standards: (a) Constructed of steel not less than four inches (4") in diameter and filled with concrete. (b) Spaced no more than four feet (4') on center between posts. (c) Set at least three feet (3') deep in a concrete footing not less than fifteen inches (15") in diameter. (d) The top of the post is not less than three feet (3') above grade. (e) Located not less than three feet (3') from the EVSE. (f) Bollard installations in elevated parking deck slabs shall be designed by the applicant's design professional, provided however, the Director may require modifications of the design that ensure the safety the EVSE or the Charging Station. (g) Other barriers that resist or deflect vehicular impact may be approved when they are designed to provide protection equivalent to the barriers describe in subsections (a) through (e). (5) Parking garages of all occupancy classifications and S-2 parking garages associated with other new occupancies that have an electrical equipment room must have dedicated space for the future installation of EVSE in the electrical equipment room. (a) This space shall be identified on all construction documents submitted for permitting review. (b) The dedicated space shall comply with the International Building Code requirements regulating working space clearances around equipment, and the requirements governing the entrance to and egress from electrical equipment working space. (c) During construction of the electrical equipment room, all raceways and conduit installed for the EVSE Infrastructure shall terminate at the space dedicated for the future Electric Vehicle Charging Station. (d) Prior to the final electrical inspection approval, the space dedicated within the electrical equipment room for the future EVSE Capable and EVSE Installed shall have the distribution board installed for "FUTURE ELECTRICAL VEHICLE CHARGING EQUIPMENT AND PANELS." (d) Fire Protection Standards. (1) EV parking spaces and Charging Stations shall be accessible from Fire Department standpipes to aid in suppressing fires. (2) All closed and enclosed parking structures renovated, or constructed after the effective date of this section shall provide one (1) nine meter by six meter (9x6) fire blanket in a location approved by the Fire Chief or their designee. All fire blankets shall be installed and maintained at the building owner's expense. (3) All closed and enclosed parking structures renovated or constructed after the effective date of this section, shall provide a fused, emergency disconnect for each charging unit to shut down power to the EVSE in the immediate vicinity of the unit. (a) The location of the disconnect shall be approved by Fire Chief or their designee. (b) Disconnect devices and related appurtenances shall be installed and maintained at the building owner's expense. (c) When the EVSE disconnect is installed, the disconnect shall be copper from the service panel to the disconnect. The conductors from the disconnect to the EVSE shall be copper. (4) A minimum of two (2) 2A:10B:C Fire Extinguishers shall have the minimum capacity of 10lbs and shall be installed within 75 feet of each EVSE capable and installed parking space and in each electrical room servicing EVSE equipment. All fire extinguishers shall be installed and maintained at the building owner's expense. (5) All closed and enclosed parking structures renovated or constructed after the effective date of this section, shall include an additional 30 inches of space between each EV parking space, or the width of the emergency disconnect, whichever is greater. The spaces in between these parking spaces shall be striped in red to prohibit parking in that space. (e) Compliance with the Americans with Disabilities Act. (1) All EVSE and Charging Stations shall comply with ADA regulations. (2) A minimum of one (1) EVSE Installed Accessible Station shall be located immediately adjacent to an ADA-designated space to provide access to the charging station. (3) An EV Charging station designated as dual-port may serve both an Accessible Station and a non-accessible Charging Station with ADA compliant hardware. (4) The use of a parking space for accessible parking shall be prioritized over the need to use the space as an EV Charging Station. (5) EVSE and Charging Stations shall not create a trip hazard or compromise the accessible path of travel when the cord is connected to a vehicle, in accordance with the U.S. Access Board's guidance for Floors and Ground Surfaces (https://www.access-board.gov/ada/guides/chapter-3-floor-and-ground-surfaces/). (a) Charging cords must be covered by a highly visible, stable, secure, low-angle cable ramp while charging. (b) A cover should remain highly visible at night through the use of reflective tape or colors that contrast with adjacent walking surfaces. (c) If the total height of both the cord and the ramp does not exceed one half inch (1/2"), the following requirements apply: (i) The ramp shall cover the charging cord completely across the sidewalk and be at least 4 feet in length. (ii) The ramp shall be no steeper than a 50% grade or 1:2 gradient. Figure 2. Cross-section of Ramp Requirements for Cords up to 1/2 inch. [image omitted; see the official code] (d) If the total height of both the cord and the ramp exceeds one half inch (1/2"), the following requirements apply: (i) The ramp shall be no steeper than an 8.3% grade or 1:12 gradient. (ii) A three foot by five foot (3' x 5') clear landing on the sidewalk shall be on either side of the ramp. (iii) The ramp shall cover the entire width of the sidewalk and can be no less than 4 feet wide. (iv) A five foot by four foot (5' x 4') or greater landing platform shall be at the top of the ramp. (v) The landing must be flat, with no more than a 2% slope (1:50 gradient) in any direction. (vi) The ramp cannot have a cross slope, perpendicular to the direction of travel, that exceeds a 2% grade (1:50 gradient). Figure 3. Cross-section of Ramp Requirements for Cords greater than 1 inch. [image omitted; see the official code] Figure 4. Overhead Diagram of a Ramp for Heights over 1/2 inch. [image omitted; see the official code]

(Ord. No. 2017-76(17-O-1654), § 2, 11-29-17; Ord. No. 2018-09(18-O-1143), § 1, 4-25-18; Ord. No. 2021-43(21-O-0618), § 1, 9-15-21; Ord. No. 2025-03(25-O-1011), § 1, 1-23-25)

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.