104.3. - PERMITS REQUIRED UNDER THIS CODE AND FEE SCHEDULES.
The following equipment or systems are required to be permitted in accordance with this Code, and Table I Fee Schedules. (a) Any person obtaining a permit shall pay to the City of Atlanta fees in accordance with Table I, City of Atlanta Plumbing Division/Schedule of Permit Fees. (b) Table I. City of Atlanta Plumbing Division. Schedule of Permit Fees No plumbing permit shall be valid until the fees prescribed in this section have been paid to the City of Atlanta. Schedule of permit fees is as follows: Permit Inspection Fees Minimum Permit Fee .....$50.00 Each Plumbing fixture .....10.00 Each Plugged or Future Opening .....10.00 Residential House Sewer - New or Replaced .....10.00 Roof Drain or Area Drain .....10.00 Water Heater .....20.00 Any Repairs, Alterations or Replacement of Fixture .....20.00 Residential Disposal Unit .....10.00 Commercial Disposal Unit (not to exceed 1½ H.P.) .....20.00 Commercial, Industrial and Multi-family Sewers, per foot .....0.50 Commercial Industrial and Multi-family Water Service Mains, per foot .....0.50 Residential Water Service Lines .....10.00 Mobile Homes—Each unit (Same rate per fixture as residential) Lawn Sprinkler System—Each .....30.00 Autopsy Table with Drain .....15.00 Repair or Alteration of Drainage or Vent Piping .....10.00 Vacuum Breakers or Backflow Preventers or Protection Devices .....10.00 Fire Protection Sprinkler Systems—Per Head .....0.40 Oil or Grease Interceptors .....10.00 Manhole under Jurisdiction of Plumbing Division .....10.00 Inspection of Sewer Plug, Standpipes, per Outlet .....10.00 Public Utility Inspections .....50.00 Change of Contractor/Company .....50.00 Miscellaneous Plumbing Fixture .....10.00 Where additional trips are required to inspect inferior work or installations which have been rejected by the plumbing division, a reinspection fee of $50.00 shall be imposed for each reinspection after the initial inspection when a written notice has been issued requiring the correction of inferior work. (c) At the discretion of the director, a fee of double the usual permit shall be charged for any installation to which work has begun without a permit in lieu of serving citations to Municipal Court. Such permit fee penalty shall not exceed $1,000.00.
(Ord. No. 1998-9, § 3, 2-16-98; Ord. No. 2002-11, § 3, 3-5-02; Ord. No. 2002-35, § 3, 5-28-02)