For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16-36.004 — Procedures

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code § 16-36.004

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/aec91b80-d387-4bf0-87d4-b72af4ff8994

Sec. 16-36.004. - Procedures.

1. Rezoning—Pre-application: In addition to the current rezoning procedures, any applications for rezoning within the BeltLine Overlay District subject area will begin with a pre-application consultation between the applicant and the bureau of planning as set by the bureau of planning. 2. Special administrative permit requirement and procedures: A special administrative permit (SAP) application and a specified number of copies of each site plan, landscape plan and elevation drawings of each exterior façade shall be submitted, as applicable, and approved by the director of the bureau of planning, under the requirements specified in section 16-25.004, prior to the issuance of a building permit. In addition to SAP submittal as specified above, the applicant shall also provide to the director of the bureau of planning a United States Postal Service certificate of mailing (first-class) of one copy of the full SAP application to the appropriate Neighborhood Planning Unit (NPU) chair or their designee for the purpose of notification and comment, and also a signed affidavit of said NPU notification. Said appropriate NPU shall have a period of 21 days from the date of the said certificate of mailing to provide one set of written comments to the bureau of planning prior to any SAP approval. All exterior demolition, new construction (including additions to existing buildings), expansions of outdoor dining or any construction which results in increased lot coverage, modification of the building footprint, or modification of building façades that alters the configuration of openings, shall be subject to said site plan and building elevation approval as part of the SAP. Any subdivisions, consolidations and replats shall conform to any proposed City of Atlanta future street plans in addition to the requirement of Part 15 of the City Code. When a conflict arises between Part 15 and this chapter, the requirements of this chapter shall apply. Where the proposed development may require one or more special administrative permits, processing by the director of the bureau of planning shall include consideration of such special administrative permits. Where underlying regulations require variance, special exception or special use permit action, the special administrative permit shall not be issued until the necessary approval has been obtained. 3. Exemptions from the special administrative permit requirement: Existing lots of record that have an underlying zoning designation of R-1 through R-5 or Special Public Interest (SPI) and not located immediately adjacent to the BeltLine Corridor shall be used and constructed as is otherwise permitted pursuant to the provisions of Part 16 and shall not require the obtaining of a special administrative permit (SAP) except as required by the underlying zoning district. Any interior renovations or exterior repairs not explicitly set forth shall not require SAP approval. Said classes of special administrative permit applications may be exempted from detailed review requirements upon written findings that generally within these districts, the actions proposed are of such a character or of such a scale as to make detailed reviews and approval by the planning director unnecessary. Where applications for special administrative permits are determined by reference to such findings to be thus exempted, the permit shall be issued if otherwise lawful.

(Ord. No. 2007-09, § 1(Att. A), 2-28-07)

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.