§ 55 — Failure to comply

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code, App. E, art. V, § 55

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/2477c428-1692-44c0-8d21-b9cc31f7a6fa

Sec. 55. - Failure to comply.

(a) If the owner fails to comply with an order to repair or demolish the dwelling, building, or structure within the time specified in the order, the director may cause such dwelling, building, or structure to be repaired, altered, or improved or to be vacated and closed or demolished. Such abatement action shall commence within 270 days after the expiration of time specified in the order for abatement by the owner. Any time during which such action is prohibited by a court order issued pursuant to O.C.G.A. § 41-2-13 or any other equitable relief granted by a court of competent jurisdiction shall not be counted toward the 270 days in which such abatement action must commence. (b) The director shall cause to be posted on the main entrance of the building, dwelling, or structure a placard with the following words: "This building is unfit for human habitation or commercial, industrial, or business use and does not comply with the applicable codes or has been ordered secured to prevent its use in connection with drug crimes or constitutes an endangerment to public health or safety as a result of unsanitary or unsafe conditions. The use or occupation of this building is prohibited and unlawful." (c) If the director has the structure demolished, reasonable effort shall be made to salvage reusable materials for credit against the cost of demolition. The proceeds of any moneys received from the sale of salvaged materials shall be used or applied against the cost of the demolition and removal of the structure, and proper records shall be kept showing application of sales proceeds. Any such sale of salvaged materials may be made without the necessity of public advertisement and bid. The director and governing authority are relieved of any and all liability resulting from or occasioned by the sale of any such salvaged materials, including, without limitation, defects in such salvaged materials.

(Ord. No. 2008-65(08-O-1285), § 1, 7-28-08)