Sec. 8-2229. - Retro-commissioning optional.
(a) This section is currently optional. Owners electing to comply with this section should adhere to the following requirements. Retro-commissioning, proven to be a key component of a comprehensive energy policy, may be revisited at a future date. The owner of a covered property shall ensure that retro-commissioning is performed on the base building systems of such property prior to filing a summary retro-commissioning report. Retro-commissioning shall be performed by or under the supervision of a retro-commissioning professional in accordance with the rules in this section. Such rules, at a minimum, shall ensure that sufficient analysis, corrections and testing have been done so that the base building systems achieve optimal performance. Exceptions: (1) Retro-commissioning is not required if the owner demonstrates that a property qualifies for one or more exceptions under section 8-2222(b). (2) Retro-commissioning is not required if the covered property has received an EPA Energy Star certification from the EPA for at least two of the three years preceding the due date of the property's summary retro-commissioning report. (3) Retro-commissioning is not required if there is no EPA Energy Star rating for the building type and a registered design professional submits documentation, as specified in rules promulgated by the department, that the property's energy performance is 25 or more percentage points better than the performance of an average building of its type over a two-year period within the three-year period prior to the due date for the property's summary retro-commissioning report consistent with the methodology of the most recent Leadership in Energy and Environmental Design (LEED) for Existing Buildings: Operation and Maintenance rating system published by the United States Green Building Council (USGBC) or other rating system or methodology for existing buildings, as determined by the department. (4) Retro-commissioning is not required if the covered property has received certification under the most recent Leadership in Energy and Environmental Design (LEED) for Existing Buildings: Operation and Maintenance rating system published by the USGBC or other rating system for existing buildings, as determined by the department, within two years prior to the filing of the property's summary retro-commissioning report and earned the LEED point for Existing Building Commissioning investigation and analysis and the LEED point for Existing Building Commissioning implementation. (5) Retro-commissioning is not required if the covered property is subject to ongoing commissioning, provided the property owner attests to compliance with all criteria set forth in the rules promulgated by the department. Ongoing commissioning may be performed by qualified on-site staff so long as other compliance criteria are met. (6) Retro-commissioning is not required for properties with less than 50 percent of the rentable floor area leased or occupied. (7) A retro-commissioning measure is not required if such retro-commissioning measure would necessitate a building permit other than an electrical permit. (8) A retro-commissioning measure is not required if such retro-commissioning measure would result in a simple payback of more than two years. For properties qualifying for exceptions in section 8-2229(a)(1) through (a)(6), the owner shall file documentation, in such form and with such certifications as required by the department, with the department in the year prior to the due date for the summary retro-commissioning report, establishing that the property qualifies for such an exemption. (b) The retro-commissioning rules ensure that the base building systems have undergone sufficient analysis, corrections and testing to meet the following criteria demonstrating efficient operation. (1) Operating protocols, calibration, and sequencing: a. HVAC temperature and humidity set points and setbacks are appropriate and operating schedules reflect major space occupancy patterns and the current facility requirements. b. HVAC sensors are properly calibrated for current facility requirements. c. HVAC controls are functioning and control sequences are appropriate for current facility requirements. d. Loads are distributed equally across equipment when appropriate (i.e., fans, boilers, pumps, etc., that run in parallel). e. Minimum ventilation rates are appropriate for current facility requirements. f. System automatic reset functions are functioning appropriately, if applicable. g. Static pressure controls are appropriate set, if applicable. h. System pressure controls are appropriately optimized, if applicable. i. Adjustments have been made to compensate for oversized or undersized equipment so that said equipment is functioning as efficiently as possible, ensuring that overheating or overcooling does not occur and that minimum variable air volume positions are appropriately set, if applicable. j. HVAC system economizer controls are properly functioning, if applicable. k. HVAC distribution systems, both air and water, are verified as appropriately balanced, with the exception of tenant-owned systems. l. Exhaust ventilation systems do not have leakage gaps at the connection to the intake registers or at the connections to the roof exhaust vents. m. Lighting sensors and controls are functioning properly according to occupancy, schedule, and/or available daylight, where applicable. n. Domestic hot water systems have been checked to ensure proper temperature settings. o. Domestic water pumps are functioning as designed. p. System and fixture water leaks have been identified and repaired. (2) Maintenance: a. Review and comment on routine maintenance practices. (3) Training and documentation: a. Critical operations and maintenance staff receive or confirm appropriate training during the commissioning effort on all major equipment and systems and general energy and water conservation techniques. b. Operational and maintenance record keeping procedures (log books, computer maintenance records, facility manuals, etc.) have been implemented. c. The following documentation is on-site and accessible to the operators: the operations and maintenance manuals, if such manuals are still available from the manufacturer; the maintenance contracts, and; the most recent retro-commissioning report.
(Ord. No. 2015-16(15-O-1101), § 2, 4-21-15)
Ask a question about Atlanta law
Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.