For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.11.4 — Special Exception Variances

Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 10.11.4

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/6b252d43-81ea-4bad-9db7-86ab51f02c53

Section 10.11.4. - Special Exception Variances.

A special exception variance may be granted subject to the requirements of this Section. A. General Limitations on Relief. Special exception variances shall be limited to relief from the following requirements of this UDO: 1. Minimum building setbacks; 2. Maximum building height; 3. Minimum lot width; 4. Public street frontage; 5. Buffers and screening; 6. Signage, in accordance with a uniform sign plan; 7. Parking requirements; 8. Roadway widths; 9. Stormwater management requirements; and 10. Soil erosion and sedimentation requirements B. Standards for Approval. A special exception variance may be granted upon a finding that the relief, if granted, would not cause substantial detriment to the public good or be injurious to the use and enjoyment of the environment or of other property in the immediate vicinity nor diminish and impair property values within the surrounding neighborhood or impair the purpose and intent of the UDO. C. Administrative Approval. Special exception variances shall be considered by the Board of Zoning Appeals unless the variance is approved administratively. Only those variances listed below, and within the parameters stated, may be considered for administrative approval. 1. Director of Inspections and Code. The Director of Inspections and Code, upon a finding that a special exception variance complies the standards for approval contained in this Section, may administratively approve such special exception variance within and not exceeding the parameters listed below. (A) Minimum Setbacks. Minimum building setbacks, not to exceed a reduction in the minimum setback required by 25%. (B) Maximum Building Height. Maximum building height, not to exceed an additional four feet above the maximum allowed. 2. Director of Engineering. The Director of Engineering, upon a finding that a special exception variance meets the standards for approval contained in this Section, may administratively approve such special exception variance within and not exceeding the following parameters: (A) Stormwater Management. Variances to stormwater management requirements listed below: (1) Waivers. The Engineering Department may grant a waiver from the provisions of the Georgia Stormwater Management Manual when a requirement is shown to be impractical or having no benefit on adequate stormwater management of the site, or for an alternative approach that will have greater benefit and practicality than that otherwise required. Such determination shall be made at the sole discretion of the City Engineer based on credible evidence and good engineering practices. (2) Alternative Stormwater Management Plan. (a) If exceptional circumstances applicable to the site exist such that strict adherence to ordinary provisions will result in unnecessary hardship and will not fulfill the intent of this UDO, an alternative stormwater management plan may be approved, following sound engineering practices. (b) The Engineering Department may not grant a variance if the proposed development will change the rate or volume of runoff significantly, have a significant, negative impact on any wetland, watercourse or waterbody, or contribute to degradation of water quality. (B) Soil Erosion and Sedimentation Control. Variances to soil erosion and sedimentation requirements listed below. (1) The Engineering Department may allow a reduction of larger buffers down to the established 25-foot buffer along the banks of any state waters that is at least as protective of natural resources and the environment as determined by the Director of Engineering or where a drainage structure or roadway drainage structure must be constructed. (2) Adequate erosion control measures are to be incorporated in the project plans and specification and implemented. (C) Parking. Parking requirements, not to exceed a reduction from the minimum required by 10%, nor an increase in the maximum allowed by 10%. D. Effect of Denial. If denied, an application for a special exception variance affecting the same property shall not be reconsidered for a period of 12 months from the date of denial. However, the Board of Zoning Appeals may reduce the waiting period under extenuating circumstances or on its own motion. E. Prohibited Special Exception Variances. In no case shall a special exception variance be granted from the conditions of approval imposed on a property through a zoning change granted by the City Council.

(Ord. No. 05-32, § 1, 4-5-05; Ord. No. 09-16, § 1, 4-3-09; Ord. No. 11-55, § 1, 11-8-11)

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.