§ 12.5.1 — Violation a Misdemeanor
Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 12.5.1
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/06d3b0ed-c7e7-4e44-8e2d-a3d4ec7deea0
Section 12.5.1. - Violation a Misdemeanor.
If any person commences any land disturbing activity requiring a land disturbing permit as prescribed in this UDO without first obtaining said permit, the person shall be subject to revocation of his business license, work permit and other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of Columbus-Muscogee County. A. Stop-Work Orders. 1. First and Second Violations. For the first and second violation of the provisions of a development permit, the Engineering Director shall issue a written warning to the violator. (A) Correction of Violation. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the Engineering Director or the local issuing authority shall issue a stop work order. (B) Contents of Order. The order shall require that land disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land disturbing activities are conducted without obtaining a development permit, the Engineering Director or the local issuing authority shall issue an immediate stop work order in lieu of a warning. 2. Third and Subsequent Violations. For a third and each subsequent violation, the Engineering Director or the local issuing authority shall issue an immediate stop work order. 3. Effective Date of Stop Work Order. All stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. 4. Issuance of Stop Work Order. When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or signification amounts of sediment, as determined by the local issuing authority or by the EPD Director or his or her designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop work order shall be issued by the local issuing authority or by the EPD Director or his or her designee. All such stop work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls. B. Bond Forfeiture. If, through inspection, it is determined that a person engaged in land-disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this ordinance and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of the Required Performance Surety Section of Chapter 10 of this UDO. The Issuing Authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. C. Administrative Remedies. The suspension, revocation, modification or grant with condition of a permit by the Issuing Authority upon finding that the holder is: 1. Not in compliance with the approved erosion and sediment control plan; 2. Is in violation of permit conditions; or 3. Is in violation of any ordinance, resolution, rule or regulations adopted or promulgated pursuant to this chapter; shall entitle the person submitting the plan or holding the permit to a hearing before the Board of Zoning Appeals within 30 days after receipt by the Department of Engineering of written notice of intent to appeal. Such appeal, however, shall not relieve that person from the obligation to provide all necessary measures to prevent soil erosion and other damage during the interval for the appeal. D. Judicial Review. Any person, aggrieved by a decision or order of the Department of Engineering, after exhausting his administrative remedies, shall have the right to appeal de novo to the Superior Court of Muscogee County.
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.