For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.9.4 — Commercial/Industrial Subdivision Entrances

Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 7.9.4

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/aca4e1d5-680c-48b8-8920-c8685ad7c713

Section 7.9.4. - Commercial/Industrial Subdivision Entrances.

A. Deceleration Lanes Required. A deceleration lanes shall be installed at all entrance roads into a commercial or industrial subdivision. B. Traffic Impact Study. 1. Study May be Required. The Director of Engineering may require a traffic study to determine if the project's size warrants a center turn lane, longer deceleration lane, an acceleration lane or other improvements. 2. Required Improvements. If the traffic study determines that further steps or improvements should be taken to protect the traveling public, the Director of Engineering will impose the additional requirements.

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.