§ 8-14.5 — Inspections
Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 8-14.5
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/b9f478fe-52d8-467b-9216-87da663ac1b2
Sec. 8-14.5. - Inspections.
(a) Existing building inspections. Before issuing a permit, the building official may examine or cause to be examined any building, electrical, gas, mechanical, or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. He shall inspect all buildings, structures, electrical, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of the technical codes. (b) Manufacturers and fabricators. When deemed necessary by the building official, he shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of all violations of the technical codes. (c) Inspection service. The building official may make, or cause to be made, the inspections required by this section. He may accept reports of inspectors of recognized inspection services, provided that after investigation he is satisfied as to their qualifications and reliability. A certificate called for by any provision of the technical codes shall not be based on such reports unless the same are in writing and certified by a responsible officer of such service. (d) Inspections prior to issuance of certificate of occupancy or completion. The building official shall inspect, or cause to be inspected, at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building, structure, electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion. (e) Posting of permit. Work requiring a permit shall not commence until the permit holder or his agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position as to permit the building official or representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the building official. (f) Required inspections. The building official, upon notification from the permit holder or his agent, shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with this code: (1) Building. a. Foundation inspection. To be made after trenches are excavated and forms erected. b. Frame inspection. To be made after the roof, all framing, fireblocking and bracing is in place, all concealing wiring, all pipes, chimneys, ducts and vents are complete. c. Final inspection. To be made after the building is completed and ready for occupancy. (2) Gas. a. Rough piping inspection: To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. b. Final piping inspection: To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test. c. Final inspection: To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes, to insure compliance with all the requirements of this code and to insure that the installation and construction of the gas system is in accordance with reviewed plans. (3) Electrical. a. The building official, or his duly authorized representative, shall inspect or cause to be inspected at various intervals all electrical work or installations for which an electrical permit is required, and upon completion of all work or installation, notice shall be given the building inspection department and a final inspection made. b. Before any electrical work or installation is concealed, the building official, or his duly authorized representative, shall be notified. It shall then be his duty to inspect such work or installations, and, providing all the requirements of this code have been complied with, issue an approval to conceal the work or installation. It shall be unlawful for any individual, firm or corporation, their agents or employees, to cover or conceal any electrical installation before such inspection has been made. c. The utility company shall not provide electrical service to any installations until the work to which service is to be provided has been approved by the building inspection department and the utility company so notified. (4) Plumbing. a. Underground inspection. To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. b. Rough-in inspection. To be made after the roof, framing, fireblocking and bracing is in place, and all soil waste and vent piping is complete, and prior to the installation of wall or ceiling membranes. c. Final inspection. To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. NOTE: See the applicable section of the International Plumbing Code for required tests. (5) Mechanical. a. Underground inspection. To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place. b. Rough-in inspection. To be made after the roof, framing, fireblocking and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of wall or ceiling membranes. c. Final inspection. To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy. (g) Reinforcing steel and structural frames. Reinforcing steel or structural frame work of any part of any building or structure shall not be covered or concealed without first obtaining a release from the building official. (h) Plaster fire protection. In all buildings where plaster is used for fire protection purposes, the permit holder or his agent shall notify the building official after all lathing and backing is in place. Plaster shall not be applied until the release from the building official or his designee has been received.
(Ord. No. 17-19, § 2, 5-9-17)
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.
