§ 8.2.3 — Development Phase Inspections
Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 8.2.3
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/6e9e8805-6fd1-41af-9094-0a7ea131c3b6
Section 8.2.3. - Development Phase Inspections.
The owner or contractor shall make requests for inspections to the Engineering Department at least 24 hours prior to when the inspection is needed. Inspections shall be made and passed prior to continuation of further activity or proceeding into new phases. Inspections are required of each of the following phases, as applicable to the actual work to be performed under the development permit: A. Preclearing Inspection Required. Prior to clearing or clearing and grubbing of the property or any portion included under the development permit, inspection of erosion and sedimentation control measures and protective devices for undisturbed areas. Inspection of erosion and sedimentation control measures will be conducted on a continuing basis. B. Inspection on Completion of Street Grading. Upon completion of grading for each street section, inspection and approval shall be required prior to trenching or continuation with subgrade preparation. C. Cover Inspection. A cover inspection prior to burial of any underground drainage structure. D. Stormwater Facilities Inspection. Upon installation of storm drainage pipe, detention, or other stormwater facilities. E. Street Curbing and Gutter Inspections. Inspection shall be requested after the forms or string line have been set. Street width and vertical and horizontal alignment may be spot-checked. F. Sub-grade of Streets. After compaction, the sub-grade shall be roll tested with an 18-ton load on a tandem dump truck and shall pass to the satisfaction of the Engineering Director. G. Street Base. After receipt of compaction test reports by the Engineering Department, the base may be string-lined for depth and crown. The street base may be roll-tested with an 18-ton load on a tandem dump truck and shall pass to the satisfaction of the Engineering Director. H. Paving. An Engineering Department Inspector shall be on site during the paving process to check consistency, depth, and workmanship, as applicable. For asphalt paving, the temperature of the material will be monitored. I. Failure to Notify. If the contractor fails to make the proper notification, he shall be responsible for the expense of any operation or laboratory testing required by the Director of Engineering to ascertain compliance with the specifications.
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.