§ 8.3.6 — Slopes
Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 8.3.6
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/f3e927ae-5100-4a1a-9393-3f65ceb051c4
Section 8.3.6. - Slopes.
The maximum slope for all cut or fill slopes shall be as provided in Table 8.3.1. The depth of cut referenced in the table shall be construed to be the maximum cut or fill occurring in any one section of cut or fill. The slope on cut or fill shall be uniform throughout for each section of cut or fill. When a cut is made in rock that requires blasting, slope may be changed to vertical slope upon the written approval of the Engineering Director. Table 8.3.1 Maximum Cut or Fill Slopes Depth of Cut on Fill | Cut Slopes 1 | Fill Slopes 2 feet or less | 2 to 1 | 2 to 1 2 feet to 5 feet | 2 to 1 | 2 to 1 Over 5 feet | 2 to 1 | 2 to 1 2 1 Maximum distance of run to rise 2 Guardrails required.
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.