For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.4.3 — Exemptions

Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 8.4.3

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/7b86301e-4f64-4679-9014-af8a13725658

Section 8.4.3. - Exemptions.

A. Activities Exempt from Permitting Process. 1. This Article applies to any land disturbing activity undertaken by any person on any land, including land disturbing activities associated with larger common plan of development or sale with land disturbance equaling to one acre or greater, except for those activities listed in this Section. 2. Exemptions as contained in this Section do not authorize any such exempted person to violate the principal of the Soil Erosion and Sediment Act to control and minimize soil erosion and sedimentation. In any event in which significant soil erosion and sedimentation leave the boundary of any project, either by surface or by a storm water system, the issuing authority of this chapter may take such action as is authorized under Chapter 12 of this UDO. 3. Further, no provision of this Section shall authorize any person to violate Article 2 of Chapter 5 of the "Georgia Water Quality Control Act" or the rules and regulations promulgated and approved thereunder or to pollute any water of State of Georgia as defined thereby. 4. Where this Section requires compliance with the minimum requirements set forth in Section 8.4.6., the Department of Engineering shall enforce compliance with the minimum requirements as if a permit had been issued and violations shall be subject to the same penalties as violations by permit holders. B. Exempt Activities. This Article shall apply to any land-disturbing activity undertaken by any person on any land except for the activities listed below. 1. Surface Mining. Surface mining, as the same is defined in O.C.G.A. § 12-4-72, Mineral Resources and Caves Act." 2. Granite Quarrying. Granite quarrying and land clearing for such quarrying. 3. Minor Activities. Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, and other related activities, which result in minor soil erosion. 4. Single-family Dwellings. Single-family detached dwellings, as provided below: (A) Owner Constructed Single-family Residences. The construction of single-family residences, when such are constructed by or under contract with the owner for his or her own occupancy. (B) Other Single-family Residences. (1) The construction of single-family residences when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph. (2) However, that construction of any residence shall conform to the minimum requirements as set forth in Section 8.4.6.C of this Article and this paragraph. For single-family residence construction covered by the provisions of this paragraph, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of the Georgia Water Quality Control Act. In any such buffer zone, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a small buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the Director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a small buffer shall be granted. The minimum requirements of this Section of this UDO and the buffer zones provided by this Section shall be enforced by the issuing authority. 5. Agricultural Operations. Agricultural operations as defined in O.C.G.A. § 1-3-3 to include the following: (A) Raising, harvesting, or storing of products of the field or orchard; (B) Feeding, breeding, or managing livestock or poultry; (C) Producing or storing feed for use in the production of livestock, including but not limited to cattle, calves, swine, hogs, goats, sheep and rabbits or for use in the production of poultry, including but not limited to chicken, hens, and turkeys; (D) Producing plants, trees, fowl, or animals; (E) The production of aqua culture, horticultural, dairy, livestock, poultry, eggs, and apiarian products; and (F) Farm buildings and farm ponds. 6. Forestry Practices. Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land disturbing or other activities otherwise prohibited in a stream buffer, as established in the Environmental Protection Chapter of this UDO, no other land disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices. 7. Natural Resources Conservation Projects. Any project carried out under the technical supervision of the Natural Resources Conservation Service of the United States Department of Agriculture. 8. State of Georgia Road Projects. Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the Department of Transportation, the Georgia Highway Authority, or the State Tollway Authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the Department of Transportation or State Tollway Authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. § 12-7-7.1, except where the Department of Transportation, the Georgia Highway Authority, or the State Road and Tollway Authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the Columbus Consolidated Government, the Columbus Consolidated Government shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders. 9. Electrical Utilities. Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electric system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the Federal Energy Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the Columbus Consolidated Government shall enforce compliance with the minimum requirements set in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders. 10. Public Water System Reservoir. Any public water system reservoir. 11. Any project involving less than one (1) acre of disturbed area; provided, however, that this exemption shall not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one (1) acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, "State Waters" excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than one (1) acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the Columbus Consolidated Government from regulating any such project which is not specifically exempted by this section.

(Ord. No. 17-6, § 1, 1-31-17)

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.