For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.6.3 — Off-site Drainage Facilities

Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 8.6.3

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/e4469334-5899-4e51-b843-69dc3e5cdaa0

Section 8.6.3. - Off-site Drainage Facilities.

Stormwater runoff that otherwise is of unacceptable quality or which would be discharged in volumes or at rates in excess of those otherwise allowed by this Ordinance may be discharged into drainage facilities off site of the development, subject to the conditions listed below. A. On-site Management. It is not practicable to completely manage runoff on site in a manner that meets the design and performance standards found in the Georgia Stormwater Management Manual. B. Design, Construction and Maintenance. Off-site drainage facilities and channels leading to them are designed, constructed and maintained in accordance with the requirements of this Chapter. C. Cost Sharing. Adequate provision is made for sharing of construction, maintenance and operating costs of the facilities. The developer may be required to pay a portion of the cost of constructing facilities as a condition to receiving approval of the stormwater management site plan.

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.