§ 9.01 — Stream buffer protection
Code of Ordinances of the City of Douglasville, Georgia (Codified through Ordinance No. O-2026-38, enacted July 20, 2026. (Supp. No. 118)) · Douglasville Code of Ordinances § 9.01
Corpus is an independent public-information project, not the official City of Douglasville website. Stable reference: corpuslaw.us/code/ae3f0e0b-ae66-4165-9b7c-0c3667ab644f
Sec. 9.01. - Stream buffer protection.
A. Findings. Whereas, the City of Douglasville finds that buffers adjacent to streams provide numerous benefits including: 1. Protecting, restoring and maintaining the chemical, physical and biological integrity of streams and their water resources; 2. Removing pollutants delivered in urban stormwater; 3. Reducing erosion and controlling sedimentation; 4. Protecting and stabilizing stream banks; 5. Providing for infiltration of stormwater runoff; 6. Maintaining base flow of streams; 7. Contributing organic matter that is a source of food and energy for the aquatic ecosystem; 8. Providing tree canopy to shade streams and promote desirable aquatic habitat; 9. Providing riparian wildlife habitat; 10. Furnishing scenic value and recreational opportunity; and 11. Providing opportunities for the protection and restoration of greenspace. B. Purposes. The purpose of this section is to protect the public health, safety, environment and general welfare; to minimize public and private losses due to erosion, siltation and water pollution; and to maintain stream water quality by provisions designed to: 1. Create buffer zones along the streams of the city for the protection of water resources; and 2. Minimize land development within such buffers by establishing buffer zone requirements and by requiring authorization for any such activities. C. Applicability; compatibility with other buffer regulations. This section shall apply to all land development activity on property containing a stream protection area as defined in this UDO. These requirements are in addition to, and do not replace or supersede, any other applicable buffer requirements established under state law or as may be prescribed under this UDO, and approval or exemption from these requirements do not constitute approval or exemption from buffer requirements established under state law or from other applicable local, state or federal regulations. This section is not intended to interfere with, abrogate or annul any other ordinance, rule or regulation, statute or other provision of law. The requirements of this section should be considered minimum requirements, and where any provision of this UDO imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provisions are more restrictive or impose higher protective standards for human health or the environment shall be considered to take precedence. D. Exemptions. The following specific activities are exempt from section 9.01, stream buffer protection. Exemption of these activities does not constitute an exemption for any other activity proposed on a property. 1. Activities for building one of the following: a. A stream crossing by a driveway, transportation route or utility line; b. Public water supply intake or public wastewater outfall structures; c. Intrusions necessary to provide access to a property; d. Public access facilities that must be on the water including boat ramps, docks, foot trails leading directly to the river, fishing platforms and overlooks; e. Unpaved foot trails and paths; f. Activities to restore and enhance stream bank stability, vegetation, water quality and/or aquatic habitat, so long as native vegetation and bioengineering techniques are used. 2. Public sewer line easements paralleling the creek, except that all easements (permanent and construction) and land disturbance should be at least 25 feet from the top of the bank. This includes such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures. This exemption shall not be construed as allowing the construction of roads, bike paths or other transportation routes in such easements, regardless of paving material, except for access for the uses specifically cited in subsection D.1. 3. Land development activities within a right-of-way existing on April 1, 2008 or approved under the terms of this division or by variance. 4. Within an easement of any utility existing at the time this UDO takes effect or approved under the terms of this UDO, land disturbance activities and such impervious cover as is necessary for the operation and maintenance of the utility, including but not limited to manholes, vents and valve structures. 5. Emergency work necessary to preserve life or property. However, when emergency work is performed under this section, the person performing it shall report such work to the zoning official on the next business day after commencement of the work. Within ten days thereafter, the person shall apply for a permit and perform such work within such time period as may be determined by the zoning official to be reasonably necessary to correct any impairment such emergency work may have caused to the water conveyance capacity, stability or water quality of the protection area. 6. Forestry and silviculture activities on land that is zoned for forestry, silvicultural or agricultural uses and are not incidental to other land development activity. If such activity results in land disturbance in the buffer that would otherwise be prohibited, then no other land disturbing activity other than normal forest management practices will be allowed on the entire property for three years after the end of the activities that intruded on the buffer. E. Buffer and setback requirements. All land development activity subject to this UDO shall meet the following requirements: 1. An undisturbed natural vegetative stream buffer shall be maintained for 50 feet, measured horizontally, on both banks (as applicable) of the stream as measured from the top of the stream bank. 2. An additional stream setback shall be maintained for 25 feet, measured horizontally, beyond the undisturbed 50 foot natural vegetative buffer, in which all impervious cover shall be prohibited along the banks of all perennial and intermittent State waters. Grading, filling and earthmoving shall be minimized within the setback. 3. No septic tanks or septic tank drain fields shall be permitted within the stream buffer or the stream setback.
(Ord. No. O-2022-8, §§ 24, 25, 3-7-22)
Ask a question about Douglasville law
Corpus searches the Douglasville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
Use the Douglasville code through the API
This call searches the Douglasville code. Change jurisdiction to the state's code to search its statutes and its cities, or to US for federal law. A free key gives 1,000 searches a month, and the MCP server works with no key.
curl -H "Authorization: Bearer $CORPUS_API_KEY" \
"https://corpuslaw.us/api/v1/search?q=Stream+buffer+protection&jurisdiction=GA-DOUGLASVILLE"Law search API · Docs · Get a free key · Connect the MCP server
