§ 109-119 — Compatibility with other buffer regulations and requirements
City Code of the City of Johns Creek, Georgia (Codified through Ordinance No. 2025-06-18, adopted June 9, 2025. (Supp. No. 23, Update 1)) · Johns Creek City Code § 109-119
Corpus is an independent public-information project, not the official City of Johns Creek website. Stable reference: corpuslaw.us/code/70503401-2767-4e84-803c-9c0e490277ae
Sec. 109-119. - Compatibility with other buffer regulations and requirements.
(a) This article is not intended to interfere with, abrogate or annul any other ordinance, rule or regulation, statute or other provision of law. The requirements of this article should be considered minimum requirements, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provisions are more restrictive or impose higher protective standards for human health or the environment shall be considered to take precedence. Additional standards which apply and will be enforced by Johns Creek are: (1) Metropolitan River Protection Act and Chattahoochee Corridor Plan: Requires a 50-foot undisturbed vegetative buffer and 150-foot impervious surface setback on the Chattahoochee and its impoundments and a 35-foot undisturbed vegetative buffer (all measured from the edge of the water) on perennial tributary streams in a Corridor extending 2,000 feet from either bank of the river and its impoundments. The corridor extends from Buford Dam to the downstream limits of the Atlanta region (Douglas and Fulton Counties). Streams in the basin of the corridor are required to be protected by buffers, but no required width is specified. (O.C.G.A. § 12-5-440 et seq.) (2) DNR Part 5 Criteria for Small (under 100 square miles) Water Supply Watersheds Authorized under Part V of the Georgia Planning Act of 1989, these criteria require 100-foot undisturbed buffers and 150-foot setbacks on all perennial streams within seven miles upstream of a public water supply reservoir or public water supply intake. Beyond seven miles, the required buffer is 50 feet and the required setback is 75 feet. Equivalent protection measures can be adopted with approval from Georgia DCA and DNR. (3) DNR Part 5 Criteria for River Protection Authorized under the 1991 Mountains and River Corridors Protection Act of 1991, these criteria require a 100-foot buffer along rivers with average annual flows of greater than 400 cfs (excepting the portion of the Chattahoochee referenced above). The buffer is measured from the top of the stream bank. (4) Other such state and federal regulations as may be adopted from time to time. (b) While the requirements of this article are intended to apply to all streams in the City of Johns Creek, special conditions may exist that require greater protection. Nothing in this article should be construed as preventing the establishment of wider and/or more restrictive buffers and setbacks as required under any other existing or future legislation. In addition, nothing in this article should be construed as preventing the establishment of wider buffers for purposes of protecting greenspace, preserving habitat or other goals that may not be specifically mandated by legislation. (c) Variance. (1) Variances consideration. Variances will be considered only in the following cases: a. When a property's shape, topography or other physical conditions existing in December 1990 prevent land development unless a buffer variance is granted. b. Unusual circumstances when strict adherence to the minimal buffer requirements would create an extreme hardship. Hardships shall be evaluated in accordance with the following: 1. If the applicant complies with the buffer widths and required practices, he or she cannot make reasonable use of his or her property. Merely proving that the variance would permit a greater profit from the property shall not be considered adequate justification for a variance; 2. The variance is the minimum possible deviation from the buffer widths that shall make reasonable use of the property possible; 3. The hardship is due to the physical nature of the applicant's property, such as its size, shape, or topography, and the applicant did not cause the hardship; 4. The variance is in harmony with the general purpose and intent of the DNR water supply watersheds; 5. In granting the variance, the public safety and welfare have been assured, and the quality of downstream water, including but not limited to water used to supply public drinking water, has been maintained or improved; and 6. The applicant certifies that the applicant has not and does not intend to apply for a variance from the minimum buffer requirements contained in the Georgia Erosion and Sedimentation Control Act for the same stream(s) for which a variance is sought pursuant to this section. (2) Variance procedure. At a minimum, variance applications shall include all the information required in section 109-118(b)(3)a. Variances shall be submitted and processed in accordance with section 22.13 of the zoning ordinance. (3) Mitigation. Mitigation measures are required to offset the effects of any proposed encroachment on the parcel. (4) Septic tanks. No septic tanks or septic tank drain fields shall be permitted within the buffer or the setback.
(Ord. No. O2006-12-27, ch. 14, art. 6, § 6, 12-19-2006; Ord. No. 2022-09-24, 9-26-2022)
Ask a question about Johns Creek law
Corpus searches the Johns Creek sections it holds and shows the ones that match, with their citations. Free, no sign-in.
