For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 109-151 — Minimum requirements for erosion, sedimentation and pollution control using best management practices

City Code of the City of Johns Creek, Georgia (Codified through Ordinance No. 2025-06-18, adopted June 9, 2025. (Supp. No. 23, Update 1)) · Johns Creek City Code § 109-151

Corpus is an independent public-information project, not the official City of Johns Creek website. Stable reference: corpuslaw.us/code/e41f6b50-da51-4cde-813b-8c30de505e0b

Sec. 109-151. - Minimum requirements for erosion, sedimentation and pollution control using best management practices.

(a) General provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities. Therefore, plans for those land disturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of subsections (b) and (c) of this section. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion and sedimentation and pollution during all stages of any land disturbing activity in accordance with requirements of this article and the NPDES general permit. (b) Minimum requirements/BMPs. (1) Best management practices as set forth in subsections (b) and (c) of this section shall be required for all land-disturbing activities. Proper design, installation and maintenance of BMPs shall constitute a complete defense to any action by the EPD director or to any other allegation of noncompliance with subsection (2) of this section or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to O.C.G.A. § 12-5-30(f) of the "Georgia Water Quality Control Act." As used in this subsection, the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the "Manual for Erosion and Sediment Control in Georgia" specified in O.C.G.A. § 12-7-6(b). (2) A discharge of stormwater runoff from disturbed areas where BMPs have not been properly designed, installed and maintained shall constitute a separate violation of any land disturbing permit issued by Johns Creek or of any state general permit issued by the division, pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act," for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 Nephelometric turbidity units for waters supporting warm water fisheries or by more than ten Nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters shall be measured in accordance with guidelines issued by the EPD director. This paragraph shall not apply to any land disturbance associated with the construction of single family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres. (3) Failure to properly design, install or maintain BMPs shall constitute noncompliance with any land disturbing permit issued by Johns Creek or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act," for each day on which such failure occurs. When such noncompliance is identified by the director of community development, official notice will be posted on that property. (4) The director EPD may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities occur as outlined by the National Pollution Discharge Elimination System requirements. (5) The local issuing authority may set more stringent buffer requirements than stated in (c)(16) and (17), in light of O.C.G.A. § 12-7-6(c). (c) Rules and regulations governing land disturbing activities. The rules and regulations, ordinances or resolutions adopted pursuant to this article and O.C.G.A. § 12-7-1 et seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and best management practices, including sound conservation and engineering practices to prevent and/or minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the "Manual for Erosion and Sediment Control in Georgia," published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following: (1) Proper erosion and sediment control measures must be installed along site boundaries prior to stripping of vegetation, regrading, and other development activities as deemed by the director of community development to minimize erosion and prevent sediment from leaving the site. (2) Cut-fill operations must be kept to a minimum. (3) Development plans must conform to topography and soil type so as to minimum erosion potential. (4) Whenever feasible, natural vegetation shall be retained, protected and supplemented. (5) The disturbed area and duration of exposure to erosive elements shall be kept to a practicable minimum. (6) Disturbed soil shall be stabilized as quickly as practicable. (7) Temporary vegetation or mulching shall be employed to protect all exposed areas (especially steep cuts and/or banks, etc.) during development. (8) Permanent vegetation and structural erosion control measures shall be installed as soon as practicable. (9) Sediment in runoff water must be trapped by the use of debris basins, sediment basins, sediment barriers, construction exits or similar BMPs as outlined in the Manual for Erosion and Sediment Control in Georgia until the disturbed area is stabilized. As used in this subsection, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of this section, and O.C.G.A. § 12-7-1 et seq. (10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping surface of fills. (11) Cuts and fills may not endanger adjoining property; (12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners; (13) Migrated soil materials or soil materials displaced by mechanical means from land disturbing sites to adjacent water courses, such as lakes, ponds, streams and creeks, etc., must be remediated. The remedial work shall be conducted as per a remedial plan approved by Johns Creek. (14) Grading equipment must cross flowing streams by means of temporary or permanent bridges or culverts except when such methods are not feasible, provided, in any case, those such crossings are kept to a minimum. (15) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on site or preclude sedimentation of adjacent waters beyond the levels specified in subsection (b)(2) of this section. (16) Except as provided in subsection (c)(17) and (c)(18) of this section, there is an established 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the EPD director determines to allow a variance that is at least as protective of natural resources and the environment where otherwise allowed by the EPD director pursuant to O.C.G.A. § 12-2-8, or where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated is the project plans and specifications are implemented; or where bulkheads and sea walls are installed to prevent shoreline erosion on Lake Oconee and Lake Sinclair; or along any ephemeral stream. As used in this provision, the term 'ephemeral stream' means a stream: that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow, Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to article 5, chapter 5 of title 12, the "Georgia Water Quality Control Act," shall remain in force unless a variance is granted by the EPD director as provided in this subsection. The following requirements shall apply to any such buffer: a. No land-disturbance activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed, except as otherwise provided by this subsection. b. Temporary structural best management practices are required to be removed at the completion of project. Once the final stabilization of the site is achieved, a buffer way be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim underbrush in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed. c. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: 1. Stream crossings for water lines; or 2. Stream crossings for sewer lines. (17) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as "trout streams" pursuant to article 2 of chapter 5 of title 12, the "Georgia Water Quality Control Act," except where a roadway drainage structure must be constructed; provided, however, that small springs and steams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the board, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. For single-family residence construction covered by the provisions section 109-150(4), there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to article 2 of chapter 5 of the "Georgia Water Quality Control Act." In any such buffer zone, no land-disturbing activity shall be conducted between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the EPD director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of this section and the buffer zones provided by this section shall be enforced by the director of community development. The EPD director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer: a. No land-disturbance activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetation cover remains to protect water quality and aquatic habitat and natural canopy is left in sufficient quality to keep shade on the stream bed; and b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: 1. Stream crossings for water lines; or 2. Stream crossings for sewer lines. (18) There is established a 25 foot buffer along coastal marshlands, as measured horizontally from the coastal marshland-upland interface, as determined in accordance with Chapter 5 of Title 12 of this title, the "Coastal Marshlands Protection Act of 1970." And the rules and regulations promulgated thereunder, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8, where an alteration within the buffer area has been authorized pursuant to O.C.G.A. § 12-5-286, for maintenance of any currently serviceable structure, landscaping, or hardscaping, including bridges, roads, parking lots, golf courses, golf cart paths, retaining walls, bulkheads, and patios; provided, however, that if such maintenance requires any land-disturbing activity, adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented, where a drainage structure or roadway drainage structure is constructed or maintained; provided, however, that if such maintenance requires any land-disturbing activity, adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented, on the landward side of any currently serviceable shoreline stabilization structure, or for the maintenance of any manmade storm-water detention basin, golf course pond, or impoundment that is located entirely within the property of a single individual, partnership, or corporation; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented. For the purposes of this paragraph maintenance shall be defined as actions necessary or appropriate for retaining or restoring a currently serviceable improvement to the specified operable condition to achieve its maximum useful life. Maintenance includes emergency reconstruction of recently damaged parts of a currently serviceable structure so long as it occurs within a reasonable period of time after damage occurs. Maintenance does not include any modification that changes the character, scope or size of the original design and serviceable shall be defined as usable in its current state or with minor maintenance but not so degraded as to essentially require reconstruction. a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat; and b. The buffer shall not apply to crossings for utility lines that cause a width of disturbance of not more than 50 feet within the buffer, provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented. c. The buffer shall not apply to any land-disturbing activity conducted pursuant to and in compliance with a valid and effective land-disturbing permit issued subsequent to April 22, 2014, and prior to December 31, 2015; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented or any lot for which the preliminary plat has been approved prior to December 31, 2015 if roadways, bridges, or water and sewer lines have been extended to such lot prior to the effective date of this Act and if the requirement to maintain a 25 foot buffer would consume at least 18 percent of the high ground of the platted lot otherwise available for development; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented. d. Activities where the area within the buffer is not more than 500 square feet or that have a "minor buffer impact" as defined in 391-3-7-.01(r), provided that the total area of buffer impacts is less than 5,000 square feet are deemed to have an approved buffer variance by rule. Bank stabilization structures are not eligible for coverage under the variance by rule and notification shall be made to the division at least 14 days prior to the commencement of land disturbing activities. (d) Adoption of additional requirements. Nothing contained in this article and O.C.G.A. § 12-7-1 et. seq. shall prevent any local issuing authority from adopting rules and regulations, ordinances or resolutions which contain stream buffer requirements that exceed the minimum requirements in subsections (b) and (c) of this section. (e) Injury to property not evidence of standards violation. The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided in this article or terms of the permit. (f) Additional requirements. Where the director of community development finds, through inspection, that property owners have been adversely affected due to violations clearly identified by the director of community development, or that the approved current plans do not adequately address the features of the site, the director of community development can require additional BMPs, drawings and revisions to comply with the minimum requirements as outlined in this section.

(Ord. No. 2016-11-21, 11-28-2016)

Ask a question about Johns Creek law

Corpus searches the Johns Creek sections it holds and shows the ones that match, with their citations. Free, no sign-in.