§ 3.01.06 — Provisions for Flood Hazard Reduction
Code of Ordinances of the City of Kennesaw, Georgia (Codified through Ordinance No. 2026-06, enacted March 2, 2026. (Supp. No. 37)) · Kennesaw Municipal Code, App. A, ch. 3, § 3.01.06
Corpus is an independent public-information project, not the official City of Kennesaw website. Stable reference: corpuslaw.us/code/0c7642c4-5897-45b3-b064-5145b04b2ab4
3.01.06 - Provisions for Flood Hazard Reduction
A. General Standards. In all areas of special flood hazard, the following provisions apply: 1. New construction of principal buildings (residential or non-residential), including manufactured homes, shall not be allowed within the limits of the floodplain; 2. Substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure; 3. Substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage; 4. Substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage; 5. Elevated buildings. All new construction and substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater. a. Designs for complying with this requirement must either be certified by a currently licensed professional engineer in the state of Georgia or currently licensed architect in the state of Georgia or meet the following minimum criteria: i. Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding; ii. The bottom of all openings shall be no higher than one foot above grade; and, iii. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both directions. b. So as not to violate the "lowest floor" criteria of this ordinance, the unfinished or flood resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and, c. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms. 6. All heating and air conditioning equipment and components, all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; 7. Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable State requirements for resisting wind forces; 8. All proposed development shall include adequate drainage and stormwater management facilities per the requirements of the City of Kennesaw to reduce exposure to flood hazards; 9. New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system; 10. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters; 11. On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; 12. Other public utilities such as gas and electric systems shall be located and constructed to avoid impairment to them, or public safety hazards from them, during flooding; 13. Any alteration, repair, reconstruction or improvement to a structure which is not compliant with the provisions of this ordinance, shall be undertaken only if the non-conformity is not furthered, extended or replaced; and 14. If the proposed development is located in multiple flood zones, or multiple base flood elevations cross the proposed site, the higher or more restrictive base flood elevation or future-condition elevation and development standards shall take precedence. B. Building Standards For Structures And Buildings Within The Future-Conditions Floodplain. 1. Residential buildings. a. New construction. New construction of principal residential structures shall not be allowed within the limits of the future-conditions floodplain unless all requirements of Paragraphs C, D and E of Section 3.01.05 have been met. If all of the requirements of Paragraphs C, D and E of Section 3.01.05 have been met, all new construction shall have the lowest floor, including basement, elevated no lower than three (3) feet above the base flood elevation or one (1) foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of Section 3.01.06 A.5.a. b. Substantial improvements. Substantial improvement of any principal residential structure shall have the lowest floor, including basement, elevated no lower than three (3) feet above the base flood elevation or one (1) foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of Section 3.01.06 A.5.a. 2. Non-residential buildings. a. New construction. New construction of principal non-residential structures shall not be allowed within the limits of the future-conditions floodplain unless all requirements of Paragraphs C, D and E of Section 3.01.05 have been met. If all of the requirements of Paragraphs C, D and E of Section 3.01.05 have been met, all new construction shall have the lowest floor, including basement, elevated no lower than one (1) foot above the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of Section 3.01.06 A.5.a. New construction that has met all of the requirements of Paragraphs C, D and E of Section 3.01.05 may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one (1) foot above the base flood elevation, or at least as high as the future-conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the City using the FEMA Flood-proofing Certificate along with the design and operation/maintenance plan. b. Substantial improvements. Substantial improvement of any principal non-residential structure located in A1-30, AE, or AH zones, may be authorized by the City to be elevated or floodproofed. Substantial improvements shall have the lowest floor, including basement, elevated no lower than one (1) foot above the level of the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with the standards of subsection 3.01.06 A5. Substantial improvements may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to one (1) foot above the base flood elevation, or at least as high as the future-conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the City of Kennesaw using the FEMA Flood-proofing Certificate along with the design and operation/maintenance plan. 3. Accessory structures and facilities. Accessory structures and facilities (i.e., barns, sheds, gazebos, detached garages, recreational facilities and other similar non-habitable structures and facilities) which meet the requirements of Paragraphs C, D and E of Section 3.01.05 and are permitted to be located within the limits of the future-conditions floodplain shall be constructed of flood-resistant materials and designed to provide adequate flood openings in accordance with Section 3.01.06 A.5.a. and be anchored to prevent flotation, collapse and lateral movement of the structure. 4. Standards for recreational vehicles. All recreational vehicles placed on sites must either: a. Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); b. Meet all the requirements for Residential Buildings - Substantial Improvements Section 3.01.06 B.1.a., including the anchoring and elevation requirements. c. No recreational vehicle may be used for long-term or permanent residential housing. 5. Standards for Manufactured Homes. a. New manufactured homes shall not be allowed to be placed within the limits of the future-conditions floodplain unless all requirements of Paragraphs C, D and E of Section 3.01.05 have been met. If all the requirements of Paragraphs C, D and E of Section 3.01.05 have been met, all new construction and substantial improvement shall have the lowest floor, including basement, elevated no lower than three (3) feet above the base flood elevation or one (1) foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of Section 3.01.06 A.5.a. b. Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision shall be elevated so that either: (i) The lowest floor of the manufactured home is elevated no lower than three (3) feet above the future-conditions flood elevation, whichever is higher; or (ii) The manufactured home chassis is elevated and supported by reinforced piers (or other foundational elements of at least an equivalent strength) of no less than 36 inches in height above grade. c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement in accordance with standards of Section 3.01.06 A.(7). C. Building Standards For Structures And Buildings Authorized Adjacent To The Floodplain 1. Residential buildings. For new construction and substantial improvement of any principal residential building or manufactured home, the elevation of the lowest floor, including basement and access to the building, shall be at least three (3) feet above the base floor elevation or one (1) foot above the regulatory flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with the standards of subsection 3.01.06 A5., "Elevated Buildings." 2. Non-residential buildings. For new construction or substantial improvement of any principal non-residential building, the elevation of the lowest floor, including basement and access to the building, shall be at least one (1) foot above the level of the base flood elevation or at least as high as the regulatory flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of subsection 3.01.06 A5., "Elevated Buildings." D. Building Standards for Residential Single-Lot Developments on Streams Without Established Base Flood Elevations and Floodway (A-Zones). For a residential single-lot development not part of a subdivision that has Areas of Special Flood Hazard, where streams exist but no base flood data have been provided (A-Zones), the City shall review and reasonably utilize any available scientific or historic flood elevation data, base flood elevation and floodway data, or future-conditions flood elevation data available from a Federal, State, or local or other source, in order to administer the provisions and standards of this ordinance. If data are not available from any of these sources, the following provisions shall apply: 1. No encroachments, including structures or fill material, shall be located within an area equal to twice the width of the stream or fifty (50) feet from the top of the bank of the stream, whichever is greater. 2. In special flood hazard areas without base flood or future-conditions flood elevation data, new construction and substantial improvements shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three (3) feet above the highest adjacent grade at the building site. Flood openings sufficient to facilitate automatic equalization of hydrostatic flood forces shall be provided for flood prone enclosures in accordance with Section 3.01.06 A.5.a. E. Building Standards For Streams Without Established Base Flood Elevations And/or Floodway (A-Zones). Located within the areas of special flood hazard, where streams exist but no base flood data has been provided (A-Zones) -or- where base flood data has been provided but a floodway has not been delineated, the City of Kennesaw shall review and reasonably utilize any available scientific or historic base flood elevation or regulatory flood elevation and floodway data available from a federal, state, or other source, in order to administer the provisions and standards of this section. If sufficient data is not available from these sources, then the City of Kennesaw may accept a hydrologic assessment performed and sealed by a registered professional engineer to determine the regulatory flood and floodway elevations. If further assessment is deemed necessary by the City of Kennesaw, it shall be carried out by a city approved engineer at applicant's expense. F. Building Standards For Areas Of Shallow Flooding (AO-Zones). Areas of special flood hazard may include designated "AO" shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. In these areas the following provisions apply: 1. All new construction and substantial improvements of residential and non-residential structures shall have the lowest floor, including basement, elevated to the flood depth number specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Flood openings sufficient to facilitate automatic equalization of hydrostatic flood forces shall be provided in accordance with the standards of Section 3.01.06 A.5.a.; 2. New construction and substantial improvement of a non-residential structure may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus one foot above the highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or licensed architect in the state of Georgia shall certify that the design and methods of construction are in accordance with accepted current standards of practice, and shall provide such certification to the City using the FEMA Floodproofing Certificate along with the design and operation/maintenance plan; and 3. Drainage paths shall be provided to guide floodwater around and away from any proposed structure and shall be shown on all construction documents. G. Standards for Subdivisions and other development. 1. All subdivision proposals shall identify the special flood hazard area and provide base flood and regulatory flood elevation data; 2. All subdivision plans will provide the elevation of proposed structure(s) and pad(s). If the site is filled above the base flood or regulatory flood elevation, the lowest flood and pad elevations shall be certified by a registered professional engineer or surveyor and provided to the City of Kennesaw; 3. All subdivision proposals shall be designed in such a manner as to be consistent with the need to minimize flood damage; 4. All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage; and 5. All subdivision proposals shall have adequate drainage provided to reduce exposure to flood hazards. H. Standards for Utilities 1. All new and replacement water supply and sanitary sewerage systems shall be designed to minimize or eliminate: a. Infiltration of flood waters into the systems; and b. Discharges from the systems into flood waters. 2. On-site waste disposal systems (e.g. septic systems) shall be located outside the floodplain to avoid impairment to them, or contamination from them during flooding. I. Standards For Dam Break Flood Zone. No occupied structure shall be allowed to be constructed within the dam break flood zone as identified in the inundation map of the Emergency Action Plan (EAP).
(Ord. No. 2018-20, 8-20-18; Ord. No. 2020-13, § 1(Exh. A), 11-16-20)
Ask a question about Kennesaw law
Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.
