§ 4.03.03 — Application Requirements

Code of Ordinances of the City of Kennesaw, Georgia (Codified through Ordinance No. 2026-06, enacted March 2, 2026. (Supp. No. 37)) · Kennesaw Municipal Code, App. A, ch. 4, § 4.03.03

Corpus is an independent public-information project, not the official City of Kennesaw website. Stable reference: corpuslaw.us/code/63261976-8dce-4df6-8604-6b9472dd5634

4.03.03 - Application Requirements

A. Site Plan Required. The applicant must submit a site plan that is sealed by a registered engineer, landscape architect, or land surveyor which contains, at a minimum, the following features: 1. Property boundaries; 2. All streams, rivers, lakes, wetlands, 100-year floodplains and other hydrologic features; 3. Topographic contours of no less than five-foot intervals; 4. All primary and secondary conservation areas labeled by type, as described in this ordinance; 5. General vegetation characteristics including tree lines, woodlands, open fields, and meadows; 6. General soil types; 7. The planned location of protected open space; 8. Existing roads, easements and structures; 9. Potential connections with existing greenspace and trails or proposed trails or greenways identified on the Kennesaw Trail Network Plan, when adopted; 10. A complete tree survey and inventory as described in the UDC, Chapter 3 tree preservation standards; 11. Identify steep slope areas greater than twenty-five (25) percent; 12. Provide distance/directional chart to open spaces in adjacent developments; 13. Provide certification statement of any existing archaeological sites and cemeteries. B. Open space management plan required. An open space management plan, as described in Section 4.03.05, shall be prepared and submitted prior to the issuance of a land disturbance permit. C. Instrument of permanent protection required. An instrument of permanent protection, as described in Section 4.03.05, shall be prepared and submitted prior to the issuance of a land disturbance permit.

Ask a question about Kennesaw law

Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.