For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5.04.05 — Development Requirements for Alternative Wireless Communications Facilities and Towers

Code of Ordinances of the City of Kennesaw, Georgia (Codified through Ordinance No. 2026-06, enacted March 2, 2026. (Supp. No. 37)) · Kennesaw Municipal Code, App. A, ch. 5, § 5.04.05

Corpus is an independent public-information project, not the official City of Kennesaw website. Stable reference: corpuslaw.us/code/426fe423-ca36-4231-852a-611e54c6ed09

5.04.05 - Development Requirements for Alternative Wireless Communications Facilities and Towers

A. Non-alternative towers shall be located only in the following zoning districts as shown in the following table subject to the restrictions and standards contained herein. Wireless transmission facilities in any other zoning districts shall be accessory uses or alternative tower structures only; provided however, non-alternative towers may be allowed on publicly owned property regardless of zoning district. TABLE 5.04.05A: LI | Light Industrial District HI | Heavy Industrial District B. Separation. Except in cases of co-location on the same tower or accessory structure, no wireless transmission facilities shall be located within 2,500 feet of any preexisting tower or preexisting antenna within the City of Kennesaw unless such facility or preexisting tower or antenna is concealed through use of alternative tower structures or otherwise camouflaged in such a way that the presence of telecommunications equipment is virtually undetectable from any adjoining property. C. All applicants seeking to erect a tower must demonstrate that no existing tower or structure can accommodate the proposed antenna(s). Evidence of an engineering nature shall be documented by the submission of a certification by an engineer licensed in the State of Georgia. Such evidence may consist of the following: 1. No existing towers or structures are located within the geographic area required to meet applicant's engineering requirements. 2. No existing structure is of sufficient height to meet the applicant's engineering requirements. 3. No existing tower or structure has sufficient structural strength to support applicant's proposed antenna(s) and related equipment. 4. Applicant's proposed antenna(s) would cause electromagnetic interference with the antenna(s) on the existing tower or structure. 5. That the cost or contractual provisions required by the tower owner to share an existing tower or structure or to adapt an existing tower or structure for sharing are unreasonable. Costs exceeding new tower development are presumed to be unreasonable. 6. Such other limiting factor(s) as may be demonstrated by the applicant. 7. All evidence submitted shall be signed and sealed by appropriate professionals or qualified industry experts licensed in the State of Georgia. Such evidence shall be subject to independent verification by an engineer of the city's choosing. The cost of such independent verification shall be the responsibility of the applicant. D. Setbacks: Setbacks for towers and above-ground transmission facilities shall be as follows: 1. All transmission facilities, except buried portions, shall be set back from all adjoining properties the distance required for the zoning district in which the wireless communications facility is located. 2. When a tower is adjacent to a residential use, the tower and entire transmission facility must be set back from the nearest residentially zoned lot line a distance equal to the twice the height of the tower. E. Unless otherwise specified by the director of community development or his/her designee, towers shall be enclosed by vinyl chain link security fencing or other approved alternative not less than six (6) feet in height and shall be equipped with an appropriate anti-climbing device. F. All new towers that do not incorporate alternative design features must be designed and built in a manner that allows other entities to co-locate on the structures. The maximum allowable height of all non-alternative towers in any zoning district shall be 125 feet. G. Co-located wireless communication facilities shall be designed to meet the following standards: 1. Use of dual band/multi band antenna (to allow sharing of antennas or antenna arrays by wireless providers using different frequency bands) or by using combiners (to allow antenna sharing by users of the same frequency band) is encouraged in order to minimize the height of support structures and the visual impact of multiple co-located antennas or antenna arrays. 2. Antenna associated with a co-located wireless communication facility shall be mounted so as to present the smallest possible silhouette, profile, or cross section. Preferred antenna mounting scenarios are, in order of descending preference: a. Compact dual polarized antennas in a cylindrical unicell arrangement extending less than two (2) feet from the structure, and mounted atop the tower; b. Panel antennas flush mounted against the tower; and c. Antennas mounted at the end of a straight or curved davit arms or brackets extending from the sides of the tower. 3. No co-located wireless communication facility located on a non-alternative tower shall have constructed thereon, or attached thereto in any way, any platform, catwalk, crow's nest, triangular framework, or like structures or equipment, except during periods of construction or repair. Curved or straight davit arms or brackets used for antenna mounting shall be connected to the tower at the base of the arms or brackets only and such arms and brackets (and any antennas or hardware mounted thereon) shall not be physically interconnected with any similar arm or bracket. 4. Where economically and technically feasible and viable, Chapter 5.04.05 shall also be construed to regulate co-locations that may occur on preexisting non-alternative wireless communication facilities and towers. H. All towers and their related facilities shall maximize the use of building materials, colors, textures, screening and landscaping that effectively blend the tower and accessory facilities within the surrounding natural setting and built environment and to provide a visual barrier between the accessory equipment and adjacent properties. Where appropriate, towers shall be painted so as to reduce their visual obtrusiveness, subject to any applicable standards of the Federal Aviation Administration (FAA). I. If upon receipt of an application for the erection of any tower or alternative tower structure governed by this ordinance, the director of community development or his/her designee deems that the proposed structure may interfere with the use of the airways of the City of Kennesaw by the public or interfere with the operation of existing or proposed airport facilities, a copy of the application shall be submitted by the community development department to the aviation division of the Cobb County Department of Transportation for review and recommendation. J. Any parcel of property proposed to be the location of a new non-alternative tower that directly abuts a residentially zoned property shall have a minimum 100 ft. landscaped buffer with a solid fence or wall no less than six (6) feet in height. K. A registered landscape architect licensed in the State of Georgia shall prepare all landscaping plans. The property shall be landscaped in accordance with city standards. L. All non-alternative towers shall be monopole in design except those located in heavy industrial zoning districts that are greater than 150 feet in height. M. All towers shall meet or exceed current standards and regulations of the Federal Communications Commission (FCC) and the Federal Aviation Administration (FAA).

Ask a question about Kennesaw law

Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.