§ 6.02.23 — Street Names and Addresses
Code of Ordinances of the City of Kennesaw, Georgia (Codified through Ordinance No. 2026-06, enacted March 2, 2026. (Supp. No. 37)) · Kennesaw Municipal Code, App. A, ch. 6, § 6.02.23
Corpus is an independent public-information project, not the official City of Kennesaw website. Stable reference: corpuslaw.us/code/acf7841a-0e7a-488e-aef6-8668b8c2a6c7
6.02.23 - Street Names and Addresses
A. Street Names. The Community Development Department has the responsibility of maintaining the street addressing system throughout the city, and coordinates with the following: Atlanta Gas Light Co., Atlanta Regional Commission, AT&T Broadband, BellSouth, Cobb EMC, Cobb County Fire Department, Cobb County Schools, Cobb County Tax Assessor's Department, Cobb County Water Department, Cobb County Voters registration, Georgia Power Co., U.S. Post Office, City of Kennesaw 911 Emergency, Kennesaw Planning and Zoning Department, Kennesaw Public Works Department, Kennesaw Utility Billing Department, Kennesaw Parks and Recreation Department, and Kennesaw Business License Department. The goal is to ensure that addresses are assigned and properly maintained in a logical, sequential order for the purposes of locating property anywhere in the county. An accurate addressing system facilitates quicker response times for emergency services, and provides efficient mail delivery. Correct property identification is also necessary for locating utilities. B. Street numbers and addresses shall be assigned, changed and/or corrected where deemed necessary to assure the health, safety, and welfare of all City residents and property owners. Street numbers shall be posted and maintained in a prominent place on the property (i.e. Building façade, mail box, signage, etc.), which is visible from the street providing public access. The numbers shall be posted in the following manner: 1. For residential properties, in figures at least one inch (1") high with a contrasting background; and 2. For commercial properties, in figures at least two inches (2") high with a contrasting background. C. Cobb County and the City of Kennesaw utilizes a grid system for assigning street names and numbers. The reference point (or zero point) of the grid is located at the Marietta Square in the county seat of Marietta, Georgia. The base line between north and south part of the county is at Whitlock Avenue. The base line between the east and west part of the County is at Church Street. Directional base lines are extended to the county's boundaries thus creating four quadrants designed N.E., N.W., S.E., and S.W. Street numbers increase as one moves away from the base lines. D. Street Numbering Procedures. All property address numbers are assigned by the Community Development Department. Typically, a property located on the right side of a street is given an even number as numbers increase. Numbers are always referenced from the address grid base lines. Generally, address numbers will increase sequentially as they move away from the zero point and the base lines and will decrease as they move toward the zero point and the base lines. E. Street Naming and Selection Procedures 1. All street names are subject to the approval of the Mayor and City Council. The following guidelines are used when assigning street names: a. Proposed streets that are obviously in alignment with other existing, named streets shall bear the names of such existing streets. Once a name is assigned to any alignment, it may not change anywhere along the extension of that alignment. b. Except within the same project, no proposed street name shall duplicate an existing street name within Cobb County regardless of the use of any suffix such as "street," "avenue," "boulevard," "drive," "place," "way," "court," or other designation. c. All streets shall bear the proper quadrant suffix (ie. N.E., N.W., S.E., S.W.). d. Proposed new names shall be reviewed for correct usage and reasonable meanings consistent with the language used. Such review shall also include correct spelling. e. Street names shall not include directional words such as north, south, east or west. f. A street name should be pleasant sounding, appropriate and easy to read so the public and children, in particular, can communicate the name in an emergency situation. g. Street names tending to be confused as homonyms (similar names spelled differently) are not acceptable. h. Names derived from a foreign language are unacceptable. i. Names that tend to be slurred, or have pronunciations that run together are unacceptable. j. Street names with the same theme (ie. flower, states, etc) are suggested for naming streets in an entire subdivision, as means of general identification, rather than duplicating the conventional name differentiated only by the street type (suffix). F. Addressing for Commercial Properties. 1. A current "Full Site" Land Disturbance Permit (LDP) for the parcel proposed for development must be issued by the Community Development Department. This is required before a request for a street address will be processed. An approved copy of the site plans for the project must be presented at the time of application, or the 6-digit LDP number must be made available for reference. 2. A field check of the property may be necessary if a proper address cannot be established. Property is typically identified by legal description (i.e. land district, land lot and parcel location). The site plans for a project are examined; the property is located on the tax map; and the correct address number range is established. 3. A street number conforming to sequential order established by the grid system is selected. If the number has not been duplicated anywhere in the city, an official property address is issued to the parcel. G. Addressing for residential properties. For new residential subdivision, street names are determined during the preliminary plat review and approval process. Names are only approved if the street name, including street type (suffix) is unique within the city. For a single family residential property located outside of a subdivision, the following process will apply: 1. A site plan based on a recent survey must be provided. The tract must be a legal "lot of record" as recorded by plat in the Office of the Clerk of Superior Court. 2. The site plan must be approved by the Community Development Department for applicable zoning requirements. 3. The driveway location for the property must be approved by the Public Works Department for access onto a minor, major or arterial road. 4. Since this type of tract is not typically a candidate for a LDP and does not come through the formal plan review process, it must be reviewed individually on a case by case basis. Each property is unique and may be subject to further review and requirements (i.e. City or State stream buffers, floodplain areas, variance stipulation, septic or sewer approval, etc.) 5. A field check of the property may be necessary to ensure the new street address is in sequence. When appropriate number is determined, an official property address notice is issued.
(Ord. No. 2018-21, § 1(Exh. B), 10-15-18)
Ask a question about Kennesaw law
Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.
