I — Granting of authority
Code of Ordinances of the City of Kennesaw, Georgia (Codified through Ordinance No. 2026-06, enacted March 2, 2026. (Supp. No. 37)) · Kennesaw Municipal Code, App. D, § I
Corpus is an independent public-information project, not the official City of Kennesaw website. Stable reference: corpuslaw.us/code/6dc6b3a4-ac1f-494a-bb4d-0227058c8e28
Section I. - Granting of authority.
Be it ordained by the governing authority of the City of Kennesaw (hereinafter referred to as the "city"), that authority, right, permission and consent are hereby granted to Cobb Electric Membership Corporation, its successors, assigns, lessees and assigns (hereinafter referred to as "Cobb EMC"), for a period of 30 years to occupy and use the streets, alleys and public places of the city within the present and future limits of the said city as from time to time as Cobb EMC may deem proper or necessary for the overhead or underground construction, maintenance, operation and extension of poles, towers, lines, wires, cables, conduits, insulators, transformers, appliances, equipment, connections and other apparatus for the business and purpose of transmitting, conveying, conducting, using, supplying and distributing electricity for light, heat, power and other purposes for which electric current may be or become useful or practicable for public or private use, and to re-enter upon such streets, alleys and public places from time to time as it may deem proper or necessary to perform these functions, and to cut and trim trees and shrubbery when and where necessary, in the judgment of Cobb EMC, to ensure safe and efficient service. The term "distribution facilities" means poles, lines, wires, cables, conductors, insulators, transformers, appliances, equipment, connections, and other apparatus installed by or on behalf of Cobb EMC (whether before or after the adoption of this ordinance) in the streets, alleys, or public places of the city for the purpose of distributing electricity within the present and future limits of the city. Distribution facilities do not include any of the following: (i) electric transmission lines with a design operating voltage of 46 kilovolts or greater (hereafter referred to as "transmission lines"); (ii) poles, towers, frames, or other supporting structures for transmission lines (hereafter referred to as "transmission structures"); (iii) transmission lines and related wires, cables, conductors, insulators, or other apparatus attached to transmission structures; (iv) lines, wires, cables, or conductors installed in concrete-encased ductwork; or (v) network underground facilities.
Ask a question about Kennesaw law
Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.
