§ 11-16 — Permit procedures
Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Code § 11-16
Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/8376c114-77f6-4718-b0fb-7fcf35433557
Sec. 11-16. - Permit procedures.
Application for a development permit, which shall be accompanied with a fifty dollar ($50.00) application fee, shall be made to the Authority on forms furnished by the Authority PRIOR to any development activities, and may include, but not be limited to the following: plans in duplicate drawn to scale showing the topographic elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities. Specifically, the following information is required: (1) Application stage. a. Elevation (in NAVD 88) of the lowest floor, including basement, of all structures; b. Elevation (in NAVD 88) to which any non-residential structure will be flood-proofed; c. Design certification from a registered professional engineer or architect that any proposed non-residential flood-proofed structure will meet the flood-proofing criteria of Section 11-21(2); d. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development. (2) Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the administrator an as-built certification of the regulatory floor elevation or flood-proofing level immediately after the lowest floor or flood proofing is completed. Any lowest floor certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When flood proofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. The Authority shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required herein, shall be cause to issue a stop-work order for the project.
(Ord. No. O-22-0016, § 1(Exh. A), 4-5-2022)
Ask a question about Macon-Bibb County law
Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.
