For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-216.1 — Record keeping, reporting requirements and inspections

Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Code § 22-216.1

Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/008c89c4-a30f-4a07-90f2-5b2a9fdf556f

Sec. 22-216.1. - Record keeping, reporting requirements and inspections.

(a) The holder of a permit issued pursuant to this article shall be required to perform such monitoring and recording of process and operational parameters as deemed necessary and appropriate by the commission with the advice of the EQB. Monitored parameters and required measuring and recording frequencies may include, but not limited to, one or more of the following: (1) Frequency and mass of waste charging (continuous). (2) Ash generation rate (weekly). (3) Primary and secondary chamber temperatures (continuous). (4) Flue gas opacity (continuous). (5) Auxiliary fuel usage (weekly). (6) Primary and secondary combustion air flow rates (weekly). (7) L.D. fan motor current (weekly). (8) Wet scrubbers (weekly): a. Scrubber liquid header pressure. b. Scrubber liquid flow rate. c. Scrubber liquid pH (daily). d. Scrubber static pressure drop. e. Demister static pressure drop. (9) Dry scrubbers and spray dry absorbers: a. Reagent flow rate (daily). b. Slaker slurry outlet temperature (weekly). c. Solids recycle rate (weekly). d. Nozzle air and slurry pressures (weekly). e. Wet and dry bulb temperatures (weekly). (10) Fabric filters: a. Bag failure records (continuous). b. Static pressure drop (weekly). c. Baghouse inlet and outlet temperatures (weekly). (11) Flue gas concentrations: a. Acid gases. b. CO. c. O 2 , CO 2 . d. Opacity. (b) The holder of a permit issued pursuant to this article shall be required to perform a TCLP ash sampling based upon a schedule to be determined by the commission or its designee, which may include the taking of daily grab samples, the analysis of composite grab samples, the analysis of composite grab samples at such frequency as determined by the commission or its designee. (c) The holder of a permit issued pursuant to this article may be required by the commission or its designee to engage in performance testing of the incineration facility at one or more of the following times: the initial startup of a new incineration facility, the startup of an existing incineration facility after significant modification or operational changes, prior to the issuance of an initial permit, and/or the renewal of an existing county permit. Such testing may include, but shall not be limited to, the following: TCLP testing of ash, combustibility testing of ash, putrescility testing of ash, stack testing for acid gases, metals, CO, VOC's, dioxins/furans, PM, etc., and biologic tracer test. (d) The holder of a permit issued pursuant to this article shall be required to provide the commission or its designee, the Macon-Bibb County health department, environmental section, copies of all semi-annual reports submitted to the environmental protection division of the state (EPD), all notices of violation from EPD and responses thereto, EPD reports of no-notice site inspections, and all other correspondence with and submissions to the state EPD. Additionally, Macon-Bibb County shall be promptly notified of any occurrence of a serious nature likely to cause public concern, including but not limited to, fire, explosion, or extensive uncontrolled emissions. (e) The holder of a permit issued pursuant to this article shall be required to provide to the commission or its designee, on an annual basis, the resumes of supervisory and management personnel responsible for the supervision and management of the incineration facility, and all records of training and certification relating to any employee of the incineration facility. (f) The holder of a permit issued pursuant to this article shall be required to present an ash management plan to the commission or its designee at the time that the holder of a permit first makes application for an initial permit pursuant to this article, and annually thereafter following the issuance of the permit for the operation of the incineration facility. Such plan shall include a description of the estimated quantity of ash to be disposed of during the upcoming year, and the names, addresses and telephone numbers of all landfills where such ash will be disposed. (g) The commission or its designee shall have the right to perform inspections of the incineration facility during normal operating hours without prior notice to the owner/operator of such facility. The commission's or its designee's right to perform inspections under this subsection shall include the authority to perform independent testing on any aspect of the performance of the incineration facility for purposes of monitoring the facility's compliance with this article. The commission or its designee, shall have the authority to require that the holder of a county permit issued pursuant to this article be required to install auxiliary sampling ports as a condition of its permit for the purpose of supporting inspections and independent testing.

Ask a question about Macon-Bibb County law

Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.