§ 22B.03 — Supplemental definitions
Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Comprehensive Land Development Resolution § 22B.03
Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/e1d274eb-9ccb-4d20-b1eb-3bdb71efd2c7
Section 22B.03. - Supplemental definitions.
These definitions shall be used in addition to those in chapter 1 of this Resolution. As used in this chapter, unless the context otherwise requires, certain terms and words are defined as follows: [1] Hazardous waste. Any solid waste which has been defined as hazardous waste in the regulations, promulgated by the administrator of the United States Environmental Protection Agency pursuant to the federal act, which are in force and effect on February 1, 1988, codified as 40 C.F.R. § 261.3. [2] Land disturbing activity. Any grading, scraping, excavating, or filling of land; clearing of vegetation and any construction, rebuilding or alteration of a structure. Land disturbing activity shall not include activities such as ordinary maintenance and landscaping operations, individual home gardens, yard and grounds upkeep, repairs, additions or minor modifications to a single-family dwelling, and the cutting of firewood for personal use. [3] Land uses existing prior to the promulgation of a river corridor protection plan. Any land use or land disturbing activity, including all human endeavors directly associated with such use or activity, which, prior to the promulgation of the river corridor protection plan falls within one (1) of the following categories: (a) Is completed; (b) In under construction; (c) Is fully approved by the Commission; (d) All materials have been submitted for approval by the Commission; or (e) Is zoned for such use and expenditures in excess of two thousand five hundred dollars ($2,500.00) have been made in preparation for construction in accordance with such zoning. [4] Natural vegetative buffer or buffer area. A river corridor containing the flora native to that area. The natural floras for specific areas are described in Georgia Geologic Survey Bulletin 114, "The Natural Environments of Georgia." Habitats for endangered and threatened species may require human management of the river corridor in order to maintain those species. [5] Perennial river. A river or section of a river that flows continuously throughout the year. [6] Protected river. Any perennial river or water course with an average annual flow of at least four hundred (400) cubic feet per second as determined by appropriate U.S. Geological Survey documents. However, those segments of rivers covered by the Metropolitan River Protection Act or the Coastal Marshland Protection Act are specifically excluded from the definition of a protected river. [7] Public utility or utilities. A service or services provided by a public utility company or a private entity which provides such service or services, and all equipment and structures necessary to provide such services. [8] River bank. The rising ground, bordering a river, which serves to confine the river to the natural channel during normal course of flow. [9] River corridor. All land, inclusive of islands, in areas of a protected river and being one hundred (100) feet horizontally on both sides of the river as measured from the river banks. The one hundred-foot buffer shall be measured horizontally from the uppermost part of the river bank, usually marked by a break in slope. Although not within the measured one hundred-foot wide buffer, the area between the top of the bank and the edge of the river shall be treated by local governments in the same manner as the river corridor and shall be included within the river corridor protection plan. Because stream channels move due to natural processes such as meandering, river bank erosion, and jumping of channels, the river corridor may shift with time. For the purposes of these standards, the river corridor shall be considered to be fixed at its position at the beginning of each review period for local comprehensive plans. Any shift in the location of the protected river after the start of the review period will require revision of the boundaries of the river corridor at the time of the next review by the department of community affairs. [10] Sensitive natural areas. Any area, as identified now or hereafter, by the department of natural resources, which contains one (1) or more of the following: (a) Habitat, including nesting sites, occupied by rare or endangered species; (b) Rare or exemplary natural communities; (c) Significant land forms, hydroforms, or geological features; or (d) Other areas so designated by the department of natural resources; and which is sensitive or vulnerable to physical or biological alteration.
(Amended November 12, 1996, ZA96-11-01)
Ask a question about Macon-Bibb County law
Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.
