§ 23.22.01 — Mining, Excavation and Fill (Development of natural resources)

Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Comprehensive Land Development Resolution § 23.22.01

Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/6302aca8-ca86-44dc-bfe8-ba2446627a32

Section 23.22.01. - Mining, Excavation and Fill (Development of natural resources).

Where permitted, Mining, Excavation and Fill, including the removal of minerals and natural materials, shall be governed by the following requirements: [1] A plan of development shall be submitted to the Commission. Such plan shall show the proposed development as planned and staged, in relation to all adjacent property within three hundred (300) feet of the proposed mining area, including topographic surveys, indicating present conditions (e.g., topography, drainage, and soils) and the conditions of the mined area at the end of the exploitation phase. [2] The plan of development shall also show that the proposed mining activity will not create hazardous conditions for other property by reason of increased flooding or rise in groundwater levels, erosion caused by increased run-off, deposition of debris from flood or erosion, or for other reasons. [3] The plan shall show the location of all proposed buildings and how traffic flow to and from the mining area will be handled. [4] The site shall be a minimum of five (5) acres with no building mining activity within fifty (50) feet of the property line. [5] The location of the mining activities shall not place any undue hardship on adjoining property owners, and the operations in the location proposed should not create unusual traffic hazards or the need for special public streets, bridges, or any other facilities unless the developer assumes full cost of such improvements. [6] All activities shall meet air and water quality standards of the Environmental Protection Division of the Georgia Department of Natural Resources. [7] The plan for re-use and reclamation shall meet the requirements and be approved by the Land Protection Branch of the Georgia Environmental Protection Division or any other agency with jurisdiction. [8] Any extension of quarrying operations beyond the property lines actually being quarried at the effective date of this Resolution shall be considered as a new operation and shall obtain a certificate of zoning compliance or conditional use permit, such permit to be renewed every two (2) years or at such longer interval as may be specified by the Commission. [9] Quarry areas being excavated shall be entirely enclosed with a six-foot high fence located at least ten (10) feet back from the edge of any excavation.

(Amended by Res. of December 9, 2024(1))

Ask a question about Macon-Bibb County law

Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.